Document/Revision No. IM-EN-SDGEN2-BP 1.02 Effective: December 2, 2014
6
Installation Equipment
Figure 2
Installation equipment
1
Retractor inner casing
Supplied by K-Patents
2
Retractor outer casing
Supplied by K-Patents
3
Adjustable wrench
4
Combination wrench, 19 mm / 3/4 in
5
Flat head screwdriver
6
Allen key 3 mm
Allen key 4 mm
7
Allen key 8 mm / 5/16 mm
8
Thread seal tape
9
Sensor insertion / removal card
Supplied by K-Patents
10
Product user manual
Supplied by K-Patents
11
Pocket guide
Supplied by K-Patents
NOTE:
The material of the SDI2 valve body that is welded onto a process pipe is Duplex
steel SAF2205 (EN 1.4462, ASTM S32205/S31803). Choose the welding method and
filler
accordingly.
K-Patents recommends complying with the applicable EN / ASTM standards.
3
Safety Requirements
These safety requirements must be followed at all times when installing, operating, or
servicing PR-23
-SD sensor. These are the minimum safety requirements – your company
may require additional PPE (personal protective equipment).
PROCESS
REFRACT
OMETER
PR-23
POCKETGUIDE
1
2
3
4
5
6
7
9
8
10
11