![Juniper SSR130 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/juniper/ssr130/ssr130_hardware-manual_2032542020.webp)
Table 7: Site Preparation Checklist (continued)
Date
Performed by
For More Information
Item or Task
Verify that there is appropriate clearance in
your selected location.
Cables
Acquire cables and connectors:
•
Determine the number of cables needed
based on your planned configuration.
•
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
SSR130 Site Guidelines and Requirements
IN THIS SECTION
General Site Installation Guidelines | 21
Site Electrical Wiring Guidelines | 21
Chassis Physical Specifications for SSR130 | 22
Environmental Requirements and Specifications for SSR130 | 22
Clearance Requirements for Hardware Maintenance of SSR130 | 23
Requirements for Mounting an SSR130 Appliance on a Desktop or Other Level Surface | 24
Rack Requirements for SSR130 | 24
20
Содержание SSR130
Страница 1: ...SSR130 Hardware Guide Published 2022 01 17...
Страница 7: ...1 CHAPTER Overview SSR130 Appliance Overview 8 SSR130 Chassis 10 LTE Support on SSR130 15...
Страница 49: ...3 Verify that all four Device interfaces are up 49...
Страница 55: ...Lithium Battery Declaration 88...
Страница 57: ...57...
Страница 61: ...Restricted Access Warning 61...
Страница 73: ...Unterminated Fiber Optic Cable Warning 73...
Страница 79: ...Jewelry Removal Warning 79...