Table 19: Site Preparation Checklist
(Continued)
Item or Task
For More Information
Perfor
med
by
Date
Plan rack or cabinet location, ensuring
the required space clearances.
"Clearance Requirements for Airflow and Hardware
Maintenance for EX9251 Switches" on page 46
Secure the rack or cabinet to the floor
and building structure.
Cables
Plan the cable routing and
management.
Acquire cables and connectors:
•
Determine the number of cables
needed based on your planned
configuration.
•
Ensure that the distance between
hardware components to be
connected allows for cable lengths
to be within the specified
maximum limits.
Management Cable Specifications
EX9251 Site Guidelines and Requirements
IN THIS SECTION
Environmental Requirements and Specifications for EX Series Switches | 38
Site Electrical Wiring Guidelines | 45