3.5
Preparing the truck for operation
Switching on the truck
Requirements
– For checks and operations to be performed before starting daily operation, see
Procedure
• Enter the operator position, see page 62.
• Pull the Emergency Disconnect switch (12) to unlock it.
• Switch on the truck, to do this
• Insert the key in the key switch (6) and turn it as far to the right as it will go.
• Enter the code in the code lock (8) (
o
).
• Hold the card or transponder in front of the ISM access module and depending
on the setting press the green button on the ISM access module (
o
).
The truck is ready for operation.
6, 8
12
20
65
10.19 en-GB
Содержание ESD 220
Страница 1: ...ESD 220 06 10 Operating instructions 51190940 10 19 en GB ESD 220...
Страница 2: ...2...
Страница 4: ...4 10 19 en GB...
Страница 10: ...10 10 19 en GB...
Страница 12: ...0506 GB 2 0506 GB 2...
Страница 16: ...14 10 19 en GB...
Страница 21: ...7 8 6 5 7 9 11 10 12 14 16 20 17 15 19 18 13 21 19 10 19 en GB...
Страница 27: ...4 2 Dimensions d 25 10 19 en GB...
Страница 32: ...5 Identification Points and Data Plates 26 24 25 30 34 33 31 28 22 32 29 23 27 30 10 19 en GB...
Страница 38: ...36 10 19 en GB...
Страница 44: ...42 10 19 en GB...
Страница 56: ...54 10 19 en GB...
Страница 59: ...2 Displays and Controls 1 7 10 56 57 23 6 58 12 19 14 59 60 61 20 21 57 10 19 en GB...
Страница 77: ...6 8 12 20 10 3 2 7 75 10 19 en GB...
Страница 79: ...6 8 12 20 10 3 2 7 77 10 19 en GB...
Страница 83: ...20 10 81 10 19 en GB...
Страница 122: ...120 10 19 en GB...
Страница 158: ......
Страница 162: ...02 16 EN 6...
Страница 164: ...02 16 EN 8 14 Safety instructions and warning information...
Страница 186: ......