![Jung LB management Скачать руководство пользователя страница 152](http://html1.mh-extra.com/html/jung/lb-management/lb-management_manual_2031681152.webp)
6.4.5 Set date and time
The date and time that should be shown on the display can be set as follows:
1.
Tap the Menu button.
2.
Select SET.
3.
Tap the OK button to confirm the selection.
The year now flashes on the display.
4.
Tap the Plus or Minus button to change values for date and time.
5.
Tap the OK button to confirm your input.
After your confirmation, the next value is called up, which you can again adjust using the Plus
and Minus buttons. All values are accepted after you have confirmed the last value.
6.4.6 Change temperature parameters
The temperature values for comfort and ECO temperature can be set as follows:
1.
Tap the Menu button.
2.
Select TEMP.
3.
Tap the OK button to confirm the selection.
The setpoint value for the comfort temperature flashes on the display.
4.
Tap the Plus or Minus button to change the setpoint value.
5.
Tap the OK button to confirm your input.
In the same way, you also set the values for the ECO temperature and, if parametrised,
the cooling temperature.
6.
Activate or deactivate the heating optimisation and temperature drop detection.
7.
Finally, set the offset value by tapping the Plus or Minus button.
Note
: The device starts with the saved setpoint values after values have been changed.
6.4.7 Change parameters for control
During initial commissioning, various settings are made to adapt the temperature control to local
conditions. The settings can be changed as follows:
1.
Tap and hold the Menu and Reset buttons for longer than ten seconds.
The display shows a countdown that counts down from 9 to 0. If the countdown has reached
0, “SET, YES or NO” is shown on the display.
2.
Now confirm or change the displayed parameters one after the other by tapping the OK but-
ton or the Plus or Minus button.
152
TEMPERATURE CONTROL
Содержание LB management
Страница 1: ...21 LB Management...
Страница 2: ...Company founder Albrecht Jung Ernst Paris 2 COMPANY...
Страница 4: ...4 PREFACE...
Страница 9: ...THE JUNG LB MANAGEMENT 9...
Страница 11: ...THE JUNG LB MANAGEMENT 11...
Страница 15: ...THE JUNG LB MANAGEMENT 15...
Страница 17: ...THE JUNG LB MANAGEMENT 17...
Страница 31: ...Casa Fonte Boa Portugal Photos Jose Campos USAGE SCENARIOS 31 USAGE SCENARIOS 31...
Страница 33: ...01 04 04 04 01 02 03 USAGE SCENARIOS 33...
Страница 43: ...EQUIPMENT OVERVIEW 43...
Страница 51: ...LB MANAGEMENT LIGHT 51...
Страница 111: ...LB MANAGEMENT SHADING 111...
Страница 139: ...TEMPERATURE CONTROL 139...
Страница 155: ...THE CLEVER CONFIG APP 155...
Страница 173: ...OPERATION 173...