background image

 

BATTERY BACKUP 
 

The TEC-44 is equipped with a Power Failure Protection Safeguard. The battery back-up is intended to finish a rotation cycle 
in case of a power failure. The Power Failure Protection Safeguard consists of 4 AA size, 1.5V (penlight) batteries.

 

1. To (re)place the batteries, open the housing 
by unscrewing the 4 housing screws. 

 

2. Place the 4 batteries and close the housing by replacing the 4 
housing screws.  
 

  

 

 
Rely as little as possible on the power failure protection safeguard. Solve 
the power supply problem as soon as possible!

 

 

 

Содержание TEC-44

Страница 1: ...1 Installation instructions 10 2015 ...

Страница 2: ...d legal requirements for safety when operating this product When handling operating or carrying out maintenance on this product personnel must employ safe engineering practices and observe all local health safety requirements regulations International users refer to regulations that prevail within the country of installation Most accidents which occur during the operation and maintenance of machin...

Страница 3: ...6 CHANGING THE INTERVAL TIME CYCLE Should the pre set interval time cycle 4 not be suitable for your requirements alternative interval times can be selected Refer to chart 1 page 6 and select the program best suited to your requirements Follow the procedure below to change the program a Choose the preferred program 0 9 or b Press SET until your program number is displayed 7 CHANGING THE ROTATION T...

Страница 4: ...4 1 2 3 4 5 6 7 8 9 ...

Страница 5: ...5 Housing screw plug 4 Housing top part with attached cable Motor Valve indicator Washer 2 Housing screw 4 Gasket Housing bottom part Ball valve Bolt 2 ...

Страница 6: ...nds rotation valve stays open 13 s 4 1 hrs E 25 seconds rotation valve stays open 18 s 5 2 hrs F 30 seconds rotation valve stays open 23 s 6 4 hrs H 45 seconds rotation valve stays open 38 s 7 8 hrs L 1 minute rotation valve stays open 53 s 8 16 hrs P 5 minutes rotation valve stays open 4m 53 s 9 24 hrs o 15 minutes rotation valve stays open 14m 53 s External Switching see page 8 adding a remote s...

Страница 7: ...re The Power Failure Protection Safeguard consists of 4 AA size 1 5V penlight batteries 1 To re place the batteries open the housing by unscrewing the 4 housing screws 2 Place the 4 batteries and close the housing by replacing the 4 housing screws Rely as little as possible on the power failure protection safeguard Solve the power supply problem as soon as possible ...

Страница 8: ...8 ADDITIONAL OPTIONS 1 2 REMOTE SWITCHING The TEC 44 can be controlled by a remote switch See illustration below how to connect a remote control 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 L N Remote switch ...

Страница 9: ...or 230VAC electrical systems Use the below mentioned diagrams to configure your drain to the corresponding electrical power supply 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 Place jumpers on points 1 2 and 3 4 L N L N Place both jumpers on points 2 3 230VAC 115VAC ...

Страница 10: ...r pcb SMT technology ensuring consistency in production Timer cycle indication Bright LED illumination LED program indicator Test feature Yes Valve type 2 2 way motorised ball valve Valve orifice 12 mm 0 5 Valve seals FPM and Teflon Inlet outlet connections 1 2 BSP or NPT Inlet connection height 1 0 cm 0 04 Serviceable valve Yes Valve housing material Brass nickel plated Stainless steel available ...

Страница 11: ...11 SERVICE CHART Date Description Name ...

Страница 12: ...12 DIMENSIONS mm ...

Отзывы: