10. During operation
10.1. Operate the crane
Lifting should be carried out in the following order:
1. Lift the load.
2. Move load closer to the crane.
3. Slew
4. Lower the load.
WARNING
• Never go underneath a hanging load or move a load over people.
• The crane may not be used for lifting personnel
Comply with the values listed on the load plate; do not overload the crane. Follow the operation of
the load warning indicator. The warning lights will flash when the load exceeds 90 % of the
maximum allowed value.
If possible, lift the load from its center of gravity. Do not lift a log from its top end.
Do not lift a load over yourself or the cab
• Never drive the cylinders to their extreme positions at full
speed.
• Never operate the stabiliser system while the crane is
loaded.
• Ensure that the weight of the load and the vehicle does
not rest solely on the stabiliser system. Adjust the
stabiliser leg if necessary.
• Do not load from in front of the vehicle: there is a risk of the vehicle tilting over!
4
3
2
1
During operation
Jonsered 1188S CE
61