JOHNSON CONTROLS
68
SECTION 22 – SEqUENTIAL DRAFT CONTROL (MOTORIZED DRAFT CONTROL)
FORM 155.17-N1
ISSUE DATE: 4/1/2013
1
FLANGE A – PARAFLOW EXHAUST FLANGE
(DIMENSIONS PER SUBMITTAL INFORMATION,
OR SEE APPROPRIATE YORK FORM)
FLANGE B – ROUND END FLANGE OF
REMOVABLE TRANSITION PIECE
(ID DETERMINED BY CHIMNEY SYSTEM DESIGNER)
ID
DRAIN VALVE
YORK
CHILLER-
HEATER
POINT A
DAMPER MOTOR
(YORK SUPPLIED
IF ORDERED)
TEMPERATURE STUB
FLANGE
FLANGE
POINT C
POINT B
TRANSITION SECTION
FITTING FOR
TEMPERATURE
SAFETY SWITCH
DRAFT SENSING LINE
STACK DAMPER ACTUATOR WIRING
ALL DRAFT PANEL / CONNECTIONS
MUST BE COMPLETED IN THE FIELD
INTERFACE TO
BURNER PANEL
PANEL SUPPLIED
FOR WALL MOUNTING
(PEDESTAL OPTIONAL)
DRAFT CONTROL PANEL
(YORK SUPPLIED IF ORDERED)
FIGURE 33 -
SEqUENTIAL DRAFT CONTROL
LD05321
Содержание YORK YPC Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 18: ...JOHNSON CONTROLS 18 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 20: ...JOHNSON CONTROLS 20 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 28: ...JOHNSON CONTROLS 28 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 30: ...JOHNSON CONTROLS 30 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 34: ...JOHNSON CONTROLS 34 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...JOHNSON CONTROLS 36 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...JOHNSON CONTROLS 38 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 46: ...JOHNSON CONTROLS 46 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...JOHNSON CONTROLS 50 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...JOHNSON CONTROLS 52 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 54: ...JOHNSON CONTROLS 54 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 58: ...JOHNSON CONTROLS 58 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 62: ...JOHNSON CONTROLS 62 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 64: ...JOHNSON CONTROLS 64 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 70: ...JOHNSON CONTROLS 70 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 78: ...JOHNSON CONTROLS 78 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...JOHNSON CONTROLS 80 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 84: ...JOHNSON CONTROLS 84 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 93: ...JOHNSON CONTROLS 93 Appendix A Tables A FORM 155 17 N1 ISSUE DATE 4 1 2013 ...
Страница 94: ...JOHNSON CONTROLS 94 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 98: ...JOHNSON CONTROLS 98 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 113: ...JOHNSON CONTROLS 113 Appendix C Insulation Illustrations C FORM 155 17 N1 ISSUE DATE 4 1 2013 NOTES ...