SECTION 11 – STEAM / CONDENSATE PURITY
As with the water side of the system, it is the respon-
sibility of the owner (operator) of this equipment to
engage the services of an experienced and reputable
steam / condensate treatment specialist for both the
initial charging of the system and its continuous moni-
toring and treatment. Improperly treated or maintained
steam / condensate will result in decreased efficien-
cy, high operating costs and premature failure due to
steam / condensate side corrosion.
Steam / Condensate samples should be collected and
analyzed on at least a monthly basis by the treat-
ment specialist. A quarterly review with the treatment
supplier should address the conditions of the steam
systems and develop action plans based on these anal-
yses. A third party consulting company can help over-
see the treatment programs in order to properly protect
the physical plant and avoid costly downtime.
It is equally important that the owner (operator) of
the equipment performs an inspection of the genera-
tor tubes at the frequencies recommended in the Tube
Maintenance Section the “Preventive Maintenance
Schedule” located in manual 155.17-OM1. In ad-
dition to periodic cleaning with tube brushes, tubes
must be inspected for wear and corrosion. Tube fail-
ures usually occur due to corrosion, erosion, and
fatigue due to thermal stress. Eddy current analysis
and visual inspection by boroscope of all tubes are
invaluable preventative maintenance methods. These
provide a quick method of determining waterside /
steam generator tube condition at a reasonable cost.
Your local Johnson Controls Service Representative
will be more than happy to supply any or all of these
services.
Содержание YORK YPC Series
Страница 10: ...JOHNSON CONTROLS 10 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 18: ...JOHNSON CONTROLS 18 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 20: ...JOHNSON CONTROLS 20 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 28: ...JOHNSON CONTROLS 28 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 30: ...JOHNSON CONTROLS 30 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 34: ...JOHNSON CONTROLS 34 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...JOHNSON CONTROLS 36 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 38: ...JOHNSON CONTROLS 38 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 46: ...JOHNSON CONTROLS 46 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...JOHNSON CONTROLS 50 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...JOHNSON CONTROLS 52 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 54: ...JOHNSON CONTROLS 54 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 58: ...JOHNSON CONTROLS 58 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 62: ...JOHNSON CONTROLS 62 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 64: ...JOHNSON CONTROLS 64 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 70: ...JOHNSON CONTROLS 70 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 78: ...JOHNSON CONTROLS 78 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 80: ...JOHNSON CONTROLS 80 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 84: ...JOHNSON CONTROLS 84 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 93: ...JOHNSON CONTROLS 93 Appendix A Tables A FORM 155 17 N1 ISSUE DATE 4 1 2013 ...
Страница 94: ...JOHNSON CONTROLS 94 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 98: ...JOHNSON CONTROLS 98 FORM 155 17 N1 ISSUE DATE 4 1 2013 THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 113: ...JOHNSON CONTROLS 113 Appendix C Insulation Illustrations C FORM 155 17 N1 ISSUE DATE 4 1 2013 NOTES ...