Configuring Communication Paths
3–12
iSTAR Ultra Installation and Configuration Guide
Configuring Communication Paths
This section includes guidelines and procedures for configuring primary and secondary
communication paths.
Planning Primary Communications
Configuring a primary communication path involves:
Specifying a master for the cluster
Specifying a communication methods between the master and the C•CURE host.
Specifying connection parameters for establishing and maintaining the primary path.
Primary Communication Guidelines
Follow these guidelines when configuring a primary path:
Every cluster must have a master.
Only one master is allowed per cluster.
If a cluster contains only one controller, that controller is the master.
Any controller in a cluster can be designated as the master.
Planning Secondary Communications
Configuring a secondary communications path involves:
Specifying the same controller responsible for secondary communications with the
C•CURE host via another NIC when a communications failure occurs on the primary
path.
Specifying the connection type.
Содержание tyco iSTAR Ultra
Страница 8: ...Table of Contents viii iSTAR Ultra Installation and Configuration Guide...
Страница 66: ...Visual Indicators 4 10 iSTAR Ultra Installation and Configuration Guide...
Страница 98: ...Readers and Accessory Boards 5 32 iSTAR Ultra Installation and Configuration Guide...
Страница 101: ...Overview iSTAR Ultra Installation and Configuration Guide 6 3 Figure 6 1 IP ACM Ethernet Door Module v2...
Страница 102: ...Overview 6 4 iSTAR Ultra Installation and Configuration Guide...
Страница 110: ...Firmware Upgrades 7 8 iSTAR Ultra Installation and Configuration Guide...
Страница 118: ...GCM Battery Replacement 8 8 iSTAR Ultra Installation and Configuration Guide...