![Johnson Controls LSWD Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/johnson-controls/lswd/lswd_startup-manual_2023444027.webp)
JOHNSON CONTROLS
27
SECTION 3 - PRE START-UP CHECkLIST
FORM 145.05-SU7
ISSUE DATE: 10/31/2019
Accepting this indicates a PASS.
MANUALLY FORCING DIGITAL
AND ANALOG OUTPUTS
You can force all Digital and Analog Outputs to each
device except compressors. Compressors are locked to
prevent accidental operation.
TABLE 6 -
DIGITAL OUTPUTS
DIGITAL OUTPUTS
TESTING/NOT TESTING
Compressor A
N/A
Compressor B
N/A
Compressor C
N/A
Compressor D
N/A
Compressor E
N/A
Compressor F
N/A
Electric Heat Stage 1
Electric Heat Stage 2
Electric Heat Stage 3
Electric Heat Stage 4
OCC/UNOC Indication
Pump Start
Supply Fan Output (CV)
Supply Fan Output (VAV,
FLEX)
SF VFD Bypass Relay
VAV Heat Relay
Alarm
TABLE 7 -
ANALOG OUTPUTS
ANALOG OUTPUTS
TESTING/NOT TESTING
Supply Fan VFD Speed
OA Damper Position
Heating Valve
Economizer Valve
Cond Water Value
Bypass Damper Position
TO VERIFY ELECTRIC HEAT OPERATES
CORRECTLY:
1. Push the SERVICE key, go left to the DO section
and down to find Supply Fan Output.
2. Change Supply Fan Output to ON.
3. Go to the AO section and down to find Supply Fan
VFD Speed. (Not needed for Constant Volume)
4. Change Supply Fan VFD Speed to 80%. (Not
needed for Constant Volume). This turns on the
Supply Fan to 80% speed.
5. Under the DO section find Electric Heat Stage 1
and turn ON. This turns the electric heater on for
testing purposes.
6. Record amperage of the Stage 1 electric heater.
7. To energize additional heaters, Stage 1 must stay
ON.
8. Energize the Stage 2 heater and record amperage.
9. Stage 2 heater can be turned off, but Stage 1 must
stay energized for additional heater testing.
10. Stage 3 and 4 (if installed) can be turned on and
tested and turned OFF.
11. After all heaters are tested turn off Stage 1.
12. Change the DO for the Supply Fan Output to OFF.
13. Change the Supply Fan VFD Speed to 0.
TO VERIFY HEATING VALVE (STEAM OR HOT
WATER) OPERATION:
1. Verify in the PROGRAM key-HEATING that
the valve type matches either DIRECT OR RE-
VERSE acting.
2. Push the SERVICE key, scroll left for the Analog
Output section.
3. Scroll down to find Heating Valve.
4. Change to 100%. This opens the valve when DI-
RECT acting. When REVERSE acting this opens
the valve.
5. Change to 0%. This closes the valve closed DI-
RECT acting. When REVERSE acting this opens
the valve.
Содержание LSWD
Страница 4: ...JOHNSON CONTROLS 4 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...
Страница 10: ...JOHNSON CONTROLS 10 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...
Страница 11: ...JOHNSON CONTROLS 11 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 PRE START UP CHECKLIST ...
Страница 12: ...JOHNSON CONTROLS 12 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Страница 13: ...JOHNSON CONTROLS 13 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Страница 14: ...JOHNSON CONTROLS 14 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Страница 15: ...JOHNSON CONTROLS 15 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Страница 16: ...JOHNSON CONTROLS 16 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Страница 17: ...JOHNSON CONTROLS 17 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Страница 18: ...JOHNSON CONTROLS 18 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Страница 19: ...JOHNSON CONTROLS 19 SECTION 3 pre Start Up Checklist FORM 145 05 SU7 ISSUE DATE 10 31 2019 ...
Страница 20: ...JOHNSON CONTROLS 20 FORM 145 05 SU7 ISSUE DATE 10 31 2019 SECTION 3 pre Start Up Checklist ...
Страница 30: ...JOHNSON CONTROLS 30 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...
Страница 34: ...JOHNSON CONTROLS 34 ...
Страница 35: ...JOHNSON CONTROLS 35 ...
Страница 36: ...JOHNSON CONTROLS 36 ...
Страница 37: ...JOHNSON CONTROLS 37 FORM 145 05 SU7 ISSUE DATE 10 31 2019 THIS PAGE INTENTIONALLY BLANK ...