210.100-IOM (JUL 2021)
Page 21
AcuAir Hygienic Air Units
Installation
Figure 17: Multi-section reconnect sealing on AcuAir food grade and sanitary series units
POLYURETHANE
CAULK
BASE RECONNECT FLANGE
.25 DIA
CONTINUOUS
BEAD OF CAULK
EXTERNAL RECONNECT
EXTERIOR SKIN
HCS NC GR5 .25 X .75
WITH FLANGE LOCKNUT NC .25-20
SPLIT REATTACHMENT ANGLE
Interior Finish
Caulking to be:
DOW RTV-732
Food Grade Caulk
INTERIOR WALL PANEL
POLYURETHANE FOAM
INSULATION
CONTINUOUS FINISHING BEAD
OF CAULK ALONG INNER SEAM
Figure 16: Cross section of split wall assembly
box to prevent the migration of moisture.
11. Inspect all splits to see if all electrical and piping con-
nections are complete and correct.
NOTICE
Do not remove temporary roof supports and diagonal
(shipping) supports until the split sections are com-
pletely reassembled.
Applying the AcuAir Food Grade
roof reconnect finish
1. The mechanical joint between the unit sections must
be bolted and sealed with polyurethane caulking before
applying the roof coating.
2. Acu-Shield Roof Coating can be applied to the roof
reconnect after any exposed polyurethane caulking is
dry and when surface temperature is between 45°F
and 108°F. Below 45°F, extra steps must be taken to
keep the polyurethane caulking, Acu-Shield, and metal
reconnect surfaces heated for correct application
during installation. Contact product service for further
direction.