Johnson Controls A19ZBC Series Скачать руководство пользователя страница 1

 
 

FANs 121, 125 

 

Temperature Controls Section 

 

Technical Bulletin 

A19ZBC 

  

Issue 

Date 

1291 

©  1991 Johnson Controls, Inc. 

1

 

  Code No. LIT-121071 
  Part No. 996-460 

 

A19ZBC Type 

Temperature Control 

 

Application 

The A19ZBC is used for general 
purpose operating temperature 
control applications.  The control 
has a single-pole, double-throw 
contact unit and a temperature 
range of 0 to 70

°

F (-15 to 25

°

C). 

A packing nut assembly, Part 
No. FTG13A-600R, (Fig. 2) and 
a bulb well No. WEL14A-602R 
(Fig. 3) for immersion 
applications are available and 
are ordered separately, if 
required. 

All Series A19 controls are 
designed for use 

only

 as 

operating controls.  Where an 
operating control failure 
would result in personal injury 
and/or loss of property, it is 
the responsibility of the 
installer to add devices 
(safety, limit controls) or 
systems (alarm, supervisory 
systems) that protect against, 
or warn of, control failure. 

Installation 

When provided, follow the 
equipment manufacturer’s 
instructions.  If instructions are 
not supplied, follow the 
instructions in this sheet. 

!

  CAUTION:  Do not dent or 

deform the sensitive bulb of 
this control.  A dent or 
deformation will change the 
calibration and cause the 
control to cycle at a 
temperature lower than the 
dial setting. 

Mounting 

When installing the control, use 
the mounting bracket as a 
template and mark the location 
for the two mounting screws.  
Drill or punch two holes and start 
the mounting screws.  Place the 
slot in the bottom of the bracket 
under the head of the lower 
mounting screw.  Position the 
control so the top screw is in the 
top slot.  Tighten both screws.  It 
is not necessary to level the 
control except for appearance. 

For closed tank applications 
without a bulb well, use the 
FTG13A-600R packing nut.  
(See Fig. 2.)  Put parts over the 
support tube section of the 
element and place the bulb in 
the tank.  Install the 1/2 in. NPT 
adapter in the tank opening and 
tighten.  Screw the packing nut 
with the retaining washers and 
packing into the adapter as 
shown in Fig. 2. 

!

  CAUTION:  Turn Off the 

liquid supply and relieve the 
pressure before installing or 
removing the bulb or bulb 
well. 

For applications requiring a bulb 
well, install the bulb well in the 
tank opening.  Remove the 
bushing from the bulb well and 
slide the bushing over the 
capillary.  Insert the bulb into the 
bulb well and replace the 
bushing.  Push the bulb into 
position in the bottom of the well.  
Tighten the set screw in the 
adapter end to hold the bulb in 
position. 

 

Fig. 1 -- A19ZBC Temperature 

Control.  Note the mounting 

bracket on the back of the case. 

 

Отзывы: