Johnson & Starley HI-SPEC J25 Скачать руководство пользователя страница 1

HI-SPEC J25 WARM AIR HEATERS

SYSTEM E-T and Basic Control

INSTALLATION,  COMMISSIONING & SERVICING INSTRUCTIONS

G.C. No 42 451 04

Publication No. ZZ 753/12

January 2010

These instructions are to be left with the User or adjacent to the Gas Meter

1

28

Johnson

& Starley

1

Air filter

2

Air circulating fan

3

Heat exchanger access cover

4

Multifunctional control

5

Data Plate

6

Heat shield

7

Burner assembly

8

Pilot burner

9

Lighting port

10

Fan delay control/limit switch

11

Gas supply pipe

12

Piezo igniter unit

13

Time control

2

3

5

10

8

9

7

6

12

4

13

1

11

Fig. 1

This appliance ha been tested and certified by G. L. Industrial Services UK Ltd. for use with natural gas G20.

Note:

If a HIJAN 6 or SUPERJAN 6 circulator is fitted, the relevant Installation, Commissioning and Servicing instructions

provided with that appliance must also be observed.

1.

BRIEF DESCRIPTION

1.1

HI-SPEC J25 is an open-flued, fan assisted downflow, ducted warm air heater, which may be supplied with SYSTEM E-T or
Basic control. A HIJAN 6 or SUPERJAN 6 circulator is available as an option.  A pilot burner incorporating an Atmospheric
Sensing Device (ASD) is fitted which responds to the presence of flue gases and shuts down the appliance.

1.2

The Air heater output can be adjusted between 5.6kW (20.0MJ/h, 19,000Btu/h) and 7.3kW (26.4MJ/h, 25,000Btu/h). “Summer
air circulation” of unheated air is available by manual selection (see User’s Instructions). HIJAN 6 output is 3.81kW (13.7MJ/
h, 13,000Btu/h), whilst SUPERJAN 6 output is 6.0kW (21.6MJ/h, 20,470Btu/h).

THIS APPLIANCE CONFORMS TO BS EN 45014

10.

SHORT LIST OF SPARES

HI-SPEC J25

KEY

G.C No

MFR’S No

DESCRIPTION

QTY

1

232 878

BOS 02064

Fan Assembly

1

2

381 627

1000-0701140

Multifunctional Control (S.I.T. Nova)

1

3

379 837

1000-0704250

Pilot Assembly (S.I.T.)

1

4

378 466

BOS 02031

Time Control

1

5

245 503

T193-0751000

Burner Assembly

1

6

398 388

BOS 02060

Main Injector (Bray 33/700)

1

7

395 945

1000-0701160

Piezo Unit (High Energy)

1

8

245 509

1000-0513820

Fuse T3.15A anti-surge

1

9

T193-0145000

Filter Tray

1

10

364 835

S00832

Solenoid Valve

1

11

242 228

S00174

Heat Exchanger

1

12

245 542

1000-0515970

Capacitor 15 uF

1

System E-T Models only

13

245 510

ET 001

Electronic Panel Assembly with daughter board

1

14

245 514

1000-0515620

Thermista-stat

1

15

245 515

1000-0515455

Fan Delay/Overheat (limit) switch

1

16

1000-0515090

Mains Filter

1

18

T193 0531000

Complete Electrical panel

1

T193 0131000

Cabinet Door Assembly

1

Basic Control Models only

19

T193 0530000

Electrical Panel

1

20

245 520

1000-0516125

Fan delay/Overheat (limit) switch

1

21

245 522

1000-0515200

Transformer Fan Speed

1

22

245 525

1000-0515730

Transformer 24 volt

1

23

245 413

1000-0511760

Relay Module

1

Johnson and Starley prides itself on its ability to supply spare parts quickly and efficiently. If you have a problem in obtaining a
spare part, please contact Johnson and Starley Spares Department at the address below.

JOHNSON & STARLEY LTD.

Telephone:

(01604) 762881

Rhosili Road,

Brackmills,

Fax:

(01604)  767408

    Northampton NN4 7LZ

Содержание HI-SPEC J25

Страница 1: ...User s Instructions HIJAN 6 output is 3 81kW 13 7MJ h 13 000Btu h whilst SUPERJAN 6 output is 6 0kW 21 6MJ h 20 470Btu h THIS APPLIANCE CONFORMS TO BS EN 45014 10 SHORT LIST OF SPARES HI SPEC J25 KEY...

Страница 2: ...n combustible partition or a perforated metal partition with the perforations not exceeding 13mm 1 2in The secondary flue must be a tight fit where it passes through the partition and must be suitably...

Страница 3: ...the heater by transferring the return air spigot Refering to fig 9 page25 remove the 4 x knockouts and use the return air spigot as a template in order to mark out where to cut the heater casing Usin...

Страница 4: ...vertical height details are given below For air heaters the minimum equivalent vertical height is 1 metre The installer must make a judgement based on his knowledge and experience and the examination...

Страница 5: ...ces of actual flue Terminal 2 5 Pipe bend 2 x 0 61 1 22 Pipe 4x1m 0 78 3 12 5 x 0 3m 0 78 1 17 Sum K 8 01 Equivalent height From the formula 2 5 2 5 He 6 2 x 2 5 2 5 0 78 x 6 2 8 01 He 3 793 This flue...

Страница 6: ...for 5 1 14 Where flue blocks are used builders should ensure that no obstruction is created during erection The installer should ensure that the connection flue does not project beyond the internal w...

Страница 7: ...be located where there is free air circulation approx 1 5m 5ft from the floor b Avoid the following locations i In a room where temperature is greatly affected by the sun or any other heat source e g...

Страница 8: ...r installations are adequate 6 2 SYSTEMBALANCING 6 2 1 Set the Air Heater electrical supply ON 6 2 2 Set the SUMMER AIRFLOW switch to 1 6 2 3 Balance the system to provide the required volume proporti...

Страница 9: ...l i Remove the Burner Pressure Adjuster cover ii Set the Burner Pressure Adjuster to provide a pressure test gauge indication for the correct burner pressure as detailed in Table 4 iii Refit the Burne...

Страница 10: ...nt to an exit from the heat exchanger by means a smoke match or puffer b Ensure that there is no spillage present indicated by displacement of smoke downwards and out of the draught diverter If the Dr...

Страница 11: ...8 That the heater must be serviced at least once a year by a competent person to ensure efficient and safe operation 7 2 9 That the red instructions for safe use have been pointed out and understood 7...

Страница 12: ...n the 2 lower Burner Assembly securing screws 8 2 7 Whilst supporting the Burner and Control Assembly release the 2 upper Burner assembly fixing screws and withdraw the Burner and Control Assembly 8 2...

Страница 13: ...respectively c Room thermostat connections from connection block terminals 7 and 8 d Limit Switch from connection block terminals 13 and 14 e Fan Delay Control from connection block terminals 18 and...

Страница 14: ...ure that the baffles are pushed fully home the gaskets are soundly sealed and fully re commission the heater 9 DEFECT DIAGNOSIS 9 1 IMPORTANT If an electrical defect occurs after installation of the a...

Страница 15: ...ure that the baffles are pushed fully home the gaskets are soundly sealed and fully re commission the heater 9 DEFECT DIAGNOSIS 9 1 IMPORTANT If an electrical defect occurs after installation of the a...

Страница 16: ...respectively c Room thermostat connections from connection block terminals 7 and 8 d Limit Switch from connection block terminals 13 and 14 e Fan Delay Control from connection block terminals 18 and...

Страница 17: ...n the 2 lower Burner Assembly securing screws 8 2 7 Whilst supporting the Burner and Control Assembly release the 2 upper Burner assembly fixing screws and withdraw the Burner and Control Assembly 8 2...

Страница 18: ...8 That the heater must be serviced at least once a year by a competent person to ensure efficient and safe operation 7 2 9 That the red instructions for safe use have been pointed out and understood 7...

Страница 19: ...nt to an exit from the heat exchanger by means a smoke match or puffer b Ensure that there is no spillage present indicated by displacement of smoke downwards and out of the draught diverter If the Dr...

Страница 20: ...l i Remove the Burner Pressure Adjuster cover ii Set the Burner Pressure Adjuster to provide a pressure test gauge indication for the correct burner pressure as detailed in Table 4 iii Refit the Burne...

Страница 21: ...r installations are adequate 6 2 SYSTEMBALANCING 6 2 1 Set the Air Heater electrical supply ON 6 2 2 Set the SUMMER AIRFLOW switch to 1 6 2 3 Balance the system to provide the required volume proporti...

Страница 22: ...be located where there is free air circulation approx 1 5m 5ft from the floor b Avoid the following locations i In a room where temperature is greatly affected by the sun or any other heat source e g...

Страница 23: ...for 5 1 14 Where flue blocks are used builders should ensure that no obstruction is created during erection The installer should ensure that the connection flue does not project beyond the internal w...

Страница 24: ...ces of actual flue Terminal 2 5 Pipe bend 2 x 0 61 1 22 Pipe 4x1m 0 78 3 12 5 x 0 3m 0 78 1 17 Sum K 8 01 Equivalent height From the formula 2 5 2 5 He 6 2 x 2 5 2 5 0 78 x 6 2 8 01 He 3 793 This flue...

Страница 25: ...vertical height details are given below For air heaters the minimum equivalent vertical height is 1 metre The installer must make a judgement based on his knowledge and experience and the examination...

Страница 26: ...the heater by transferring the return air spigot Refering to fig 9 page25 remove the 4 x knockouts and use the return air spigot as a template in order to mark out where to cut the heater casing Usin...

Страница 27: ...n combustible partition or a perforated metal partition with the perforations not exceeding 13mm 1 2in The secondary flue must be a tight fit where it passes through the partition and must be suitably...

Страница 28: ...User s Instructions HIJAN 6 output is 3 81kW 13 7MJ h 13 000Btu h whilst SUPERJAN 6 output is 6 0kW 21 6MJ h 20 470Btu h THIS APPLIANCE CONFORMS TO BS EN 45014 10 SHORT LIST OF SPARES HI SPEC J25 KEY...

Отзывы: