Скачайте бесплатное Руководство по сборке JMP PRL 101 с нашего сайта. Этот подробный мануал поможет вам правильно собрать продукт без сложностей. Получите доступ к инструкциям на manualshive.com.
CHILDREN PLAYGROUND ASSEMBLY INSTRUCTION
PRL 101
Jūrmalas Mežaparki, Ltd.
1 Garkalnes street
Jurmala, LV 2011, Latvia
Страница 1: ...CHILDREN PLAYGROUND ASSEMBLY INSTRUCTION PRL 101 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala LV 2011 Latvia ...
Страница 2: ...it may create an additional load on the playground and pose a hazard to the children The angle of inclination should be no more than 5 Do not install the equipment on a hard surface such as concrete pavement or asphalt Falling on such surface can be traumatic Installation Children must not participate in the assembly and installation process as loose parts falling and or tool usage could cause inj...
Страница 3: ......
Страница 4: ... D5 Plank 96 25 1000 10 D6 Plank 96 25 1000 2 D7 Plank 96 46 1540 1 D8 1 Beam 1400 mm 80 80 1400 1 D9 Beam 1700 mm 80 80 1700 2 D10 Beam 2400 mm 80 80 2400 4 D11 Beam 90 90 2400 1 D12 Beam 90 90 2500 2 D13 Plank 90 46 2012 1 D14 Plank 96 46 1360 1 D15 Plank 96 46 1360 1 D19 Beam 80 80 450 1 N1 Barrier 600 12 970 2 N2 Barrier 570 12 445 2 N3 Floor 838 15 1050 1 CE1 Bar 38 38 426 4 CE2 Slide 1 CE3 S...
Страница 5: ... 80 1400 1 D9 Beam 1700 mm 80 80 1700 2 D10 Beam 2400 mm 80 80 2400 4 D11 Beam 90 90 2400 1 D12 Beam 90 90 2500 2 D13 Plank 90 46 2012 1 D14 Plank 96 46 1360 1 D15 Plank 96 46 1360 1 D19 Beam 80 80 450 1 N1 Barrier 600 12 970 2 N2 Barrier 570 12 445 2 N3 Floor 838 15 1050 1 CE1 Bar 38 38 426 4 CE2 Slide 1 CE3 Swing seat 2 CE4 Tent 1 CE5 Swing around 4 CE6 Swing through 1 CE8 Rope 1 CE12 Bar 38 38 ...
Страница 6: ... T40 Sockets 13 and 17 3 Required safety area for the playground Required safety area for the playground WARNING A Safety zone must be maintained 2000 mm around any playground equipment see above This area must be clear from any objects trees buildings fences rocks curbs pools etc WARNING It is recommended to put the slide in such way that the sun does not overheat the surface 2 000 2 000 2 000 4 ...
Страница 7: ...rmalas Mežaparki Ltd 1 Garkalnes street Jurmala 1 000 1 000 1 000 1 000 1 000 1 540 450 D1 Quantity 2 pcs Lath D2 Quantity 1 pcs Lath D3 Quantity 4 pcs Plank D5 Quantity 10 pcs Lath D6 Quantity 2 pcs Plank D7 Quantity 1 pcs Plank 1540 mm D19 Quantity 1 pcs Beam Detail specification 4 Detail specification ...
Страница 8: ...01 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 1 400 1 700 2 400 D8 1 Quantity 1 pcs Beam 1400 mm D9 Quantity 2 pcs Beam 1700 mm D10 Quantity 4 pcs Beam 2400 mm Detail specification 5 Detail specification ...
Страница 9: ...le Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 2 400 2 500 2 012 1 360 1 360 D11 Quantity 1 pcs Beam D12 Quantity 2 pcs Beam D13 Quantity 1 pcs Plank D14 Quantity 1 pcs Plank D15 Quantity 1 pcs Plank 6 Detail specification Detail specification ...
Страница 10: ...und PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 970 445 1 050 600 Quantity 2 pcs N1 Barrier Quantity 2 pcs N2 Barrier Quantity 1 pcs N3 Floor 7 Barrier specification Barrier specification ...
Страница 11: ...aparki Ltd 1 Garkalnes street Jurmala Quantity 4 pcs Quantity 1 pcs CE1 Bar CE2 Slide Quantity 1 pcs CE4 Tent Quantity 4 pcs CE5 Swing around Quantity 1 pcs CE6 Swing through Quantity 2 pcs CE3 Swing seat Quantity 1 pcs CE8and CE12 Bar and rope Additional elements specification 8 Additional elements specification ...
Страница 12: ... pcs 4 Quantity 9 pcs 5 Quantity 1 pcs 6 Quantity 4 pcs 7 Quantity 2 pcs 8 Quantity 33 pcs 9 Quantity 33 pcs 10 Quantity 33 pcs 11 Quantity 17 pcs 12 Quantity 6 pcs Plastic washer s28tx 5 x 70 DIN931 10 x 160 DIN931 10 x 150 DIN931 10 x 130 DIN931 10 x 190 DIN571 8 x 80 Metal washer M10 Plastic cap Plastic end cap DIN985 M10 screw nut Metal washer M8 Fittings specification 9 Fittings specification...
Страница 13: ...i Ltd 1 Garkalnes street Jurmala 13 Quantity 6 pcs 14 Quantity 6 pcs 15 Quantity 41 pcs 19 Quantity 4 pcs 20 Quantity 8 pcs Plastic cap small Plastic end cap small s28tx 5 x 50 DIN571 8 x 60 s28tx 5 x 35 21 Quantity 1 pcs DIN7991 10 x 120 22 s28tx 6 0 x 90 Quantity 3 pcs 10 Fittings specification Fittings specification ...
Страница 14: ...ale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala D10 D10 D3 D7 D3 A A C C B C D9 9 8 11 9 8 11 6 A 9 8 11 9 8 11 6 B 9 8 10 11 4 9 8 11 4 9 8 11 C D10 D10 D3 D3 C C C C 430 430 STEP 1 Assembly step 1 11 Front view of ladder Front view of slide ...
Страница 15: ...D PRL 101 Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 1 100 D D D D E E D10 D10 D5 D5 D5 D5 Must be leveled 2 D 2 E STEP 2 Assembly step 2 12 ...
Страница 16: ...Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 1 100 Must be leveled F E D10 D10 D5 D5 D6 D6 F F F E 2 E 2 F STEP 3 Assembly step 3 13 Front view of swing ...
Страница 17: ...UND PRL 101 Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala D10 D5 D5 D10 D10 D5 D5 E E E E 2 E STEP 4 Assembly step 4 14 Front view of ladder ...
Страница 18: ...layground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala G G D6 D6 D8 1 21 9 10 5 11 9 10 10 11 9 8 8 G Comment 1 Double bore is up 1 100 STEP 5 Assembly step 5 15 Front view of swing ...
Страница 19: ... Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala D6 D3 D5 D3 H H N3 15 H STEP 6 Assembly step 6 16 Comment 1 The floor is placed with the abrasive side up ...
Страница 20: ...L 101 Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 1 100 430 430 9 11 4 8 10 4 9 8 11 I I I D9 D3 D3 STEP 7 Assembly step 7 17 Front view of swing ...
Страница 21: ...EN PLAYGROUND PRL 101 Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala D9 D9 D2 J J 2 J STEP 8 Assembly step 8 18 Front view of swing ...
Страница 22: ... 12 5 12 5 0 K1 K1 K1 K K D10 D10 D10 D10 D9 D9 N1 N1 N2 N2 N1 1 15 K 1 15 K1 STEP 9 Assembly step 9 19 All barriers should be bolted as shown above 1 All barriers should be screwed at equal distances from the side beam 2 The barriers should be screwed 30 mm from the floor except for the barriers N1 which should be bolted right above the floor leaving no gap ...
Страница 23: ... 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala Comment D12 D12 D13 M L L CE6 9 8 10 3 11 9 8 10 L 14 13 19 12 M STEP 10 Assembly step 10 20 Comment 1 First beams are inserted into CE6 2 Then part D13 is bolted to beams D12 3 Finally CE6 is bolted to beams D12 ...
Страница 24: ...01 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 2 400 530 460 500 460 450 N N N N D11 CE5 CE5 CE5 CE5 15 N STEP 11 Assembly step 11 21 WARNING Swing hooks must be placed at the exact positions shown below ...
Страница 25: ...AYGROUND PRL 101 Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala O D11 CE6 O 30 14 13 19 12 O 30 19 13 12 14 O STEP 12 Assembly step 12 22 ...
Страница 26: ...HILDREN PLAYGROUND PRL 101 Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala D8 1 P D11 9 8 10 11 6 P STEP 13 Assembly step 13 23 ...
Страница 27: ...nd PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala 15 15 R R D14 D15 CE1 20 20 448 426 364 644 364 280 280 STEP 14 Assembly step 14 24 Comment 1 Parts are inserted until they rebound fully in ...
Страница 28: ...CHILDREN PLAYGROUND PRL 101 Children playground PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala S D9 D10 14 12 13 7 S STEP 15 Assembly step 15 25 ...
Страница 29: ...hree 6 0x90 screws at equal distances 2 The beam is placed on the outside but it is bolted from the inside 3 Beam D19 is placed along the side of the floor top edges of D19 and N3 match 2 U Comment 1 The slide is ATTACHED SO that no space is left between it and the beam D19 2 The slide is bolted both to the construction leaving no gap STEP 16 Assembly step 16 26 WARNING It is recommended to put th...
Страница 30: ... PRL 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala T D10 D9 U CE3 D19 STEP 17 Assembly step 17 27 WARNING It is recommended to put the slide in such way that the sun does not overheat the surface ...
Страница 31: ... 101 drawings Page Scale Pages 29 Date 12 12 2012 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala D10 D9 Z Z Comment 1 The first rod should be placed at least 300 mm above the ground level 2 Distance between bars are 300 mm STEP 18 Assembly step 18 28 ...
Страница 32: ...2 Jūrmalas Mežaparki Ltd 1 Garkalnes street Jurmala D11 CE3 CE3 CE4 D6 D5 Y X X D1 D1 X Comment 1 The swing around hooks should be tightened so that there is no lateral sideward movement 20 1 Y 350 STEP 19 Assembly step 19 29 WARNING Swing seats must be located at least 350 mm above the ground level ...