Table 6-11.
Component Maintenance Intervals - X430AJ - with Lithium-Ion Battery Pack
Component
Operation
Pre-Start As Needed
Hours
10
50
100
250
500 1000 2000
Hydraulic Oil
Check Level
•
Replace
•
Hydraulic Oil Filter
Replace Cartridge
•*
•
Articulated Joint Points
Grease
•*
•
Battery (Auxiliary)
Check
•
Reduction Gear Oil
Check Level
•
Replace
•*
•
Machine
General Periodic Check
•
•*
Extension Arm Internal Sliding Ring (if equipped)
Check Wear
•
Replace
•
Turntable Bolt Tightening
Check
•*
•
Platform Mount Pin Nuts
Check torque 148 ft. lb. (200 Nm)
•
SERV...
* 1st time interval then per chart thereafter
** At least every 3 months or 1000 hrs. of operation
*** At lease every 5 years or 2000 hrs of operation. Check every year. If torque is not correct, replace the nuts with new nuts of same specification.
Install dry without using grease or oil to specified torque.
SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
3121773
– JLG Lift –
6-11
To
order
go
to
Discount-Equipment.com