MAINTENANCE
171
MUX17JP021602
Boom
Lift
Models X17JPLUS
short
‐
circuit
has
been
resolved,
the
cell
will
start
to
cool
down.
However,
the
area
has
to
remain
isolated
until
the
cell
reaches
ambient
temperature
and
is
removed
from
the
area.
The
temperature
of
the
cell
has
to
be
checked
periodically
using
a
remote
sensor
such
as
an
infra
‐
red
sensor.
If
the
cell
remains
hot
the
following
actions
must
be
assessed.
MINIMUM
EQUIPMENT
REQUIRED:
• Infra
‐
red
temperature
probe
• Safety
glasses
• Hard
hat
with
impact
resistant
face
visor
• Non
‐
conductive
pliers
• Hand,
arm
and
body
protection
PROCEDURE:
• Evacuate
the
area
as
soon
as
abnormal
cell
temperature
has
been
established.
• Periodically
check
the
temperature
of
the
cell
using
a
remote
sensor
for
the
first
two
hours
or
until
one
of
the
following
cases
occur:
– The
cell
starts
to
cool
down
– The
cell
vents
– The
cell
explodes
• If
the
cell
starts
cooling,
check
the
temperature
every
hour
until
ambient
tem
‐
perature
has
been
reached.
• If
a
temperature
sensor
is
not
available,
do
not
handle
the
cell
for
a
minimum
of
24
hours.
• Remove
the
cell
from
the
work
area
when
ambient
temperature
has
been
rea
‐
ched
and
return
to
normal
operations.
• Dispose
of
the
cell
in
accordance
with
existing
legislation
(in
the
country
in
question)
on
hazardous
goods.
• The
procedures
in
cases
of
venting
or
explosion
are
examined
in
the
following
paragraphs.
12.18.1.3.Procedure
for
handling
vented
cells
In
normal
conditions
a
cell
does
not
show
leaks
or
venting,
however
a
cell
may
vent
or
release
substances
if
the
critical
temperature
is
reached
or
if
the
protective
glass
‐
metal
seal
breaks
due
to
severe
mechanical
conditions.
The
severity
of
the
leak
consequent
to
venting
ranges
from
slight
leak
around
the
seal
to
a
violent
leak
of
substances
through
the
vent.
In
some
cases,
if
the
cell
is
not
plugged,
it
Содержание X17JPLUS
Страница 2: ......
Страница 8: ...MUX17JP021602 6 Boom Lift Models X17JPLUS ...
Страница 34: ...32 Boom Lift Models X17JPLUS TECHNICAL INFORMATIONS MUX17JP021602 ...
Страница 87: ...USING THE MACHINE 85 MUX17JP021602 Boom Lift Models X17JPLUS 11 3 WORKING AREA Fig 79 Working area ...
Страница 162: ...160 Boom Lift Models X17JPLUS MAINTENANCE MUX17JP021602 ...
Страница 189: ...HYDRAULIC SYSTEM 187 MUX17JP021602 Boom Lift Models X17JPLUS 15 HYDRAULIC SYSTEM Riferimento Descrizione 1 Hand pump ...
Страница 192: ...190 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 16 WIRING DIAGRAM ...
Страница 193: ...WIRING DIAGRAM 191 MUX17JP021602 Boom Lift Models X17JPLUS Fig 172 Petrol ...
Страница 194: ...192 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 Fig 173 Diesel ...
Страница 195: ...WIRING DIAGRAM 193 MUX17JP021602 Boom Lift Models X17JPLUS Fig 174 Lithium ...
Страница 197: ...WIRING DIAGRAM 195 MUX17JP021602 Boom Lift Models X17JPLUS Worldwide locations ...
Страница 198: ...196 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 ...
Страница 199: ......