MAINTENANCE
153
MUX17JP021602
Boom
Lift
Models X17JPLUS
12.6.4.D
‐
Structural
inspection
A
structural
inspection
is
required
to
verify
the
structural
soundness
of
critical
components
of
the
aerial
platform
and
must
be
performed:
1
10
years
after
the
date
of
manufacture
and
every
5
years
thereafter
2
After
every
accident
that
may
actually,
presumably,
or
potentially
cause
da
‐
mage
and
affect
the
structural
soundness
or
stability
of
the
aerial
platform.
Such
accidents
include
short
circuits,
impacts,
falls,
collisions,
or
cases
of
over
‐
stress
or
stability
failure.
3
After
a
change
of
ownership,
unless
a
complete
service
history
is
provided,
in
‐
cluding
maintenance
and
inspection
records.
The
structural
inspection
must
be
carried
out
under
the
supervision
of
a
profes
‐
sional
engineer.
This
inspection
must:
1
Consider
the
service
history
of
the
aerial
platform
in
terms
of
hours
of
service,
severity
of
use,
and
number
and
variability
of
users;
2
Review
the
inspection
and
maintenance
record
of
the
aerial
platform;
3
Verify
the
efficiency
of
all
operating
controls;
4
Perform
a
visual
inspection
of
the
aerial
platform;
5
Consider
recommendations
of
the
manufacturer
regarding
the
aerial
pla
‐
tform,
including
manufacturer
ʹ
s
safety
bulletins.
12.6.5.E
‐
Maintenance
Before
adjustments
and
repairs
are
started
on
the
aerial
platform,
the
following
precautions
must
be
taken:
1
The
power
system
must
be
stopped,
and
the
starting
devices
must
be
rende
‐
red
inoperative;
2
All
controls
must
be
in
the
OFF
position
and
all
operating
systems
must
be
se
‐
cured
against
accidental
activation
by
brakes,
chocks
or
other
means;
3
Elevating
and
rotating
assembly
and
platform
must
be
completely
lowered,
if
possible,
or
otherwise
secured
by
blocking
or
propping;
4
The
hydraulic
oil
pressure
must
be
released
from
all
hydraulic
circuits
before
loosening
or
removing
hydraulic
components;
5
Safety
props
or
latches
must
be
installed
where
applicable;
6
Other
precautions
must
be
adopted
as
specified
in
the
user
and
operation
ma
‐
nual.
Содержание X17JPLUS
Страница 2: ......
Страница 8: ...MUX17JP021602 6 Boom Lift Models X17JPLUS ...
Страница 34: ...32 Boom Lift Models X17JPLUS TECHNICAL INFORMATIONS MUX17JP021602 ...
Страница 87: ...USING THE MACHINE 85 MUX17JP021602 Boom Lift Models X17JPLUS 11 3 WORKING AREA Fig 79 Working area ...
Страница 162: ...160 Boom Lift Models X17JPLUS MAINTENANCE MUX17JP021602 ...
Страница 189: ...HYDRAULIC SYSTEM 187 MUX17JP021602 Boom Lift Models X17JPLUS 15 HYDRAULIC SYSTEM Riferimento Descrizione 1 Hand pump ...
Страница 192: ...190 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 16 WIRING DIAGRAM ...
Страница 193: ...WIRING DIAGRAM 191 MUX17JP021602 Boom Lift Models X17JPLUS Fig 172 Petrol ...
Страница 194: ...192 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 Fig 173 Diesel ...
Страница 195: ...WIRING DIAGRAM 193 MUX17JP021602 Boom Lift Models X17JPLUS Fig 174 Lithium ...
Страница 197: ...WIRING DIAGRAM 195 MUX17JP021602 Boom Lift Models X17JPLUS Worldwide locations ...
Страница 198: ...196 Boom Lift Models X17JPLUS WIRING DIAGRAM MUX17JP021602 ...
Страница 199: ......