5.  Apply loctite #243 to the threads of both hex head bolts (P/N 297-7091). 

 

6.  Attach hydraulic valve (P/N 353-3455) to the mounting bracket (P/N 353-3454) 

as shown in Figure #2, using the two hexhead bolts (P/N 297-7091).  A washer 
(P/N 8T-4224) must be placed on both the head and nut end of the bolt. Secure 
with nut (P/N 5C-7261). 

 

 

 

FIGURE #2 

 
 

7.  Measure 570 mm (22-1/2 inches) from the compensation cylinder barrel rod end 

and mark the location (refer to Figure #3).    

 

FIGURE #1 

Note:   Left hand image shows ports marked “V1” and “V2”. 
Right hand image shows ports marked “C1” and “C2”. 
Secondary ports are uppermost in both images. 

#C111C3

Содержание TH336

Страница 1: ...elehandlers do not have the correct load values Lifting certain loads specified on those load charts will cause the machine to tip over This bulletin requires the installation of a compensating valve...

Страница 2: ...9 592 594 600 602 603 605 606 608 615 617 632 635 637 639 641 644 653 Model Affected Serial Number s GROUP B Compensating Valve Kit Installation Procedure TH336 TDE00101 103 117 137 140 142 148 155 15...

Страница 3: ...must be installed on all affected units in accordance with the enclosed Compensating Valve Kit Installation Procedure GROUP B UNITS The Compensating Valve Kit must be installed on all affected units i...

Страница 4: ...ob Load Chart installation is a 0 5 hour job Up to 2 hours and 100 km for travel PARTS DISPOSITION Handle the parts in accordance with your Warranty Bulletin on warranty parts handling CONTACTS A copy...

Страница 5: ...Washer 5C 7261 2 Nut 343 7049 2 Hose Clamp 353 3448 1 Hose Assembly 353 3451 1 Hose Assembly 353 3450 1 Hose Assembly 353 3449 1 Hose Assembly 342 3862 3 Cable Tie Telehandler Model TH337 TH407 Kit 3...

Страница 6: ...machine for servicing by a Park the machine on a firm level surface with the machine level b Retract the boom and elevate the boom to approximately a 33 degree boom angle c Place the travel select lev...

Страница 7: ...ts P N 297 7091 A washer P N 8T 4224 must be placed on both the head and nut end of the bolt Secure with nut P N 5C 7261 FIGURE 2 7 Measure 570 mm 22 1 2 inches from the compensation cylinder barrel r...

Страница 8: ...size close to the work area Oil discharge will be less than 1 litre 1 4 gallon 12 Carefully loosen the compensation cylinder hoses attached to the hydraulic pipe mounted on the underside of the boom a...

Страница 9: ...valve port marked C1 to the inner boom hydraulic pipe and hose P N 353 3452 from the outer boom hydraulic pipe to valve port marked C2 Correctly torque the hose fittings to 55 Nm 41 lb ft 16 Ensure th...

Страница 10: ...Page 6 of 7 FIGURE 5 18 Confirm installation is correct as shown in Figure 6 FIGURE 6 C111C3...