SECTION 3 - CHASSIS & TURNTABLE
3-62
3121200
12.
Carefully lower the turntable onto the swing bearing,
ensuring that the scribed line of the inner race of the
bearing aligns with scribed line on the turntable.
13.
Spray a light coat of Safety Solvent 13 on the new bear-
ing bolts. Then apply a light coating of JLG Threadlocker
0100019 to the new bearing bolts, and install the bolts
and washers through the turntable and inner race of the
bearing.
14.
Following the Torque Sequence diagram shown in Fig-
ure 3-29., Swing Bearing Torque Sequence, tighten the
bolts to a torque of 118 ft.lbs. (160 Nm) w/Loctite.
15.
Remove the lifting equipment.
16.
Connect the hydraulic lines to the fittings on the turnta-
ble as tagged prior to removal.
17.
Install the boom assembly. Refer to Section 4.3, Boom
and Cylinder Assembly.
18.
Using all applicable safety precautions, activate the
hydraulic system and check the swing system for proper
and safe operation.
Swing Bearing Torque Values
1.
Outer Race - 118 ft.lbs. (160 Nm)
2.
Inner Race - 118 ft.lbs. (160 Nm)
3.
See Swing Bearing Torquing Sequence.
CHECK THE INNER AND OUTER SWING BEARING BOLTS FOR MISSING OR
LOOSENESS AFTER FIRST 50 HOURS OF OPERATION, AND EVERY 600 HOURS
THEREAFTER.
Swing Drive Checks
There are three visual checks that can be used to determine if
the swing drive is worn. Gently rock the boom back and forth
and look for the following:
1.
Movement of the turntable gear (this indicates the
motor is spinning due to a worn out motor or air in the
lines)
2.
Rotation of the Screw Shaft
3.
Screw shaft moving in and out of the end plate
3
2
1
Содержание T500J
Страница 1: ...Service and Maintenance Manual Model T500J PN 3121200 July 25 2018 Rev I AS NZS...
Страница 2: ......
Страница 16: ...xii 3121200 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally...
Страница 36: ...SECTION 2 GENERAL 2 8 3121200 NOTES...
Страница 115: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 79 MAE29600 DRIVE MOTOR SPINDLE 1 Figure 3 37 Wheel Drive Removal and Installation...
Страница 136: ...SECTION 3 CHASSIS TURNTABLE 3 100 3121200 Figure 3 41 Battery Cable Routing Prior to SN 0030001804...
Страница 143: ...SECTION 3 CHASSIS TURNTABLE 3121200 3 107 Figure 3 45 Battery Charger Schematic...
Страница 213: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 3121200 5 39 This page left blank intentionally...
Страница 234: ...SECTION 5 BASIC HYDRAULIC INFORMATION SCHEMATICS 5 60 3121200 NOTES...
Страница 246: ...SECTION 6 JLG CONTROL SYSTEM 6 12 3121200 Figure 6 5 System Test Flow Chart Platform Tests...
Страница 248: ...SECTION 6 JLG CONTROL SYSTEM 6 14 3121200 Figure 6 6 System Test Flow Chart Ground Station Tests...
Страница 283: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121200 7 11 Figure 7 17 Connector Installation...
Страница 297: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121200 7 25 This page left blank intentionally...
Страница 304: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 3121200 NOTES...
Страница 305: ......