Section 4- Operation
4-8
31211018
Placing a Load
Before placing any load be sure that:
• The landing point can safely support the weight of the load.
• The landing point is level; front to back and side to side.
• Use the capacity chart to determine safe boom extension range. See
• Align forks at the level load is to be placed, then extend boom slowly until load is just
above area where it is to be placed.
• Lower the boom until the load rests in position and the forks are free to retract.
Disengaging a Load
Once the load has been placed safely at the landing point, proceed as follows:
1. With the forks free from the weight of the load, the boom can be retracted
and/or the telehandler can be backed away from under the load if surface will not
change level condition of telehandler.
2. Lower the carriage.
3. The telehandler can now be driven from the landing location to continue work.
Содержание Skytrak 6036
Страница 44: ...Section 3 Controls and Indicators 3 2 31211018 3 2 CONTROLS OH4980 9 2 1 10 11 7 6 4 3 8 5 12 13...
Страница 80: ...Section 4 Operation 4 14 31211018 This Page Intentionally Left Blank...
Страница 89: ...Section 5 Attachments 5 9 31211018 This Page Intentionally Left Blank...
Страница 134: ...Section 6 Emergency Procedures 6 4 31211018 This Page Intentionally Left Blank...
Страница 143: ...Section 7 Lubrication and Maintenance 7 9 31211018 8042 10042 O 5731 H 50 EVERY...
Страница 144: ...Section 7 Lubrication and Maintenance 7 10 31211018 10054 O 5711 H 50 EVERY...
Страница 145: ...Section 7 Lubrication and Maintenance 7 11 31211018 250 Hour Lubrication Schedule 6036 6042 O 1830 A EVERY 250 6042 ONLY...
Страница 147: ...Section 7 Lubrication and Maintenance 7 13 31211018 1000 Hour Lubrication Schedule OH4181 1000 EVERY...
Страница 166: ...Section 8 Additional Checks 8 4 31211018 This Page Intentionally Left Blank...
Страница 182: ...Index 4 31211018...
Страница 184: ...Inspection Maintenance and Repair Log Date Comments...
Страница 186: ......