SECTION 5 - EMERGENCY PROCEDURES
5-4
– JLG Lift –
3121303
Manual Platform Deck Retraction
1.
The platform deck extension should be retracted before
the platform lowering begins.
2.
Locate separate valve handle and place on the valve as
shown (first section from the left).
3.
Open valve by pulling handle down.
4.
While continuing to hold the valve open, activate the
manual pump by pumping back and fourth as shown.
5.
After manual platform deck retraction is complete,
release valve on the valve bank and remove handle from
valve. Turn the valve on the hand pump counterclock-
wise to open and push pump handle forward
Содержание LIFTLUX 210-25
Страница 2: ......
Страница 22: ...SECTION 1 SAFETY PRECAUTIONS 1 12 JLG Lift 3121303 NOTES...
Страница 32: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 10 JLG Lift 3121303 NOTES...
Страница 48: ...SECTION 4 MACHINE OPERATION 4 2 JLG Lift 3121303 SIDESLOPE HORIZONTAL GRADE Figure 4 1 Grade and Sideslope...
Страница 80: ...SECTION 7 INSPECTION AND REPAIR LOG 7 2 JLG Lift 3121303 Table 7 1 Inspection and Repair Log Date Comments...
Страница 82: ......
Страница 83: ......