Section 5 - Attachments
5-41
31200172
Personnel Work Platform (Before S/N 0160037689)
The operator and personnel in platform must read and understand the
separate personnel work platform manual prior to installing and using a
platform.
Preparation and Setup
1. Check to ensure the personnel platform is securely attached at the quick switch
or is securely attached to the forks and/or carriage if using fork mounted
personnel work platform. Follow installation procedure on page 5-11 for JLG
quick switch mounted personnel work platforms.
2. Ensure the telehandler is on a firm surface and is level.
3. Engage the park brake. Blocking the wheels is also recommended.
4. Level the platform, both side to side (frame level) and front to back
(attachment tilt).
5. Keep area under the platform free from personnel.
6. When personnel are on platform, the operator must remain seated in cab with
personnel in direct line of sight.
7.
DO NOT
lift or carry persons in the bucket or on forks.
WARNING
FALL HAZARD.
Never tilt the platform forward, rearward, or level the machine
when the platform is occupied.
Содержание GRADALL 544D-10
Страница 24: ...Section 1 General Safety Practices 1 14 31200172 This Page Intentionally Left Blank...
Страница 67: ...Section 5 Attachments 5 5 31200172 This Page Intentionally Left Blank...
Страница 79: ...Section 5 Attachments 5 17 31200172 This Page Intentionally Left Blank...
Страница 106: ...Section 5 Attachments 5 44 31200172 This Page Intentionally Left Blank...
Страница 115: ...Section 7 Lubrication and Maintenance 7 7 31200172 250 Hour Lubrication Schedule MX0072 EVERY 250 R...
Страница 128: ...Section 7 Lubrication and Maintenance 7 20 31200172 This Page Intentionally Left Blank...
Страница 129: ...Section 8 Additional Checks 8 1 31200172 SECTION 8 ADDITIONAL CHECKS This Page Intentionally Left Blank...
Страница 130: ...Section 8 Additional Checks 8 2 31200172 This Page Intentionally Left Blank...
Страница 138: ...Inspection Maintenance and Repair Log Date Comments...
Страница 140: ......