SECTION 5 - HYDRAULICS
3121160
– JLG Lift –
5-19
5.9 HYDRAULIC OIL CHANGE-OUT
PROCEDURE
This procedure is written to change out JLG std. hydraulic
oil (Mobile 424) to cold weather fluid for machines operat-
ing in temperatures exceeding -20F. (-29C.). JLG recom-
mends (Mobile DTE 13). This procedure also applies to
change-out of cold weather oil to std. Mobil 424 hydraulic
oil.
NOTE:
This is not a procedure for changing from a petro-
leum based fluid to a water based fluid. Stricter
guidelines are required when fluids are not compat-
able.
1.
All booms stowed, (jib also), drain the hydraulic oil
tank, (approx. 40 gallons [150 L]).
2.
Disconnect the main drive lines (A& B) from the right
rear drive motor, and right front motor if 4 wheel
drive. Drain into a container.
3.
Disconnect the case drain lines from each of these
motors and drain. This will drain most of the drive
system. After they have been drained, reconnect
them.
4.
Refill the hydraulic oil tank with the appropriate fluid
as recommended.
5.
Remove the o-ring plug, (#10 size) on top of the
Rexroth load sense pump. The plug is removed until
the oil flows out of the pump. This insures that the
pump cases are full of oil before starting. Install the
plug after there is a steady flow of oil.
6.
Jog the Auxiliary power pump 2-3 times (not ener-
gizing a function, only the Aux. Pump switch). Then
activate the Aux. switch for approx. 20 seconds. This
will flush the Aux. system.
7.
Start the engine and let idle for a couple of minutes.
Shut off engine.
8.
If the machine has a jib: Remove the hose con-
nected to port #17 on the main valve block and
drain into a container that will hold at least 2 gallons
(8 L) of oil. Plug port #17. Start the engine and acti-
vate jib up to the end of stroke. Stop, reconnect the
hose to port#17, and cycle the jib function.
9.
Remove the hose at port #8 on the main valve
block. Place this hose inside a container that will
hold approx 10 gallons (38 L). Activate tower lift up
to the end of stroke. Reconnect the hose on port #8
and lower the tower boom.
NOTE:
Depending on the ceiling height, the upper boom
might have to be lowered while lifting the tower.
10.
Locate the manual pull valve on the side of the oil
tank (red knob). Disconnect the 1/4" hose (port #1)
where it connects to the side of the hyd. return filter
(plug the port) and place into a container that will
hold approx. 10 gallons (38 L). Start the engine. Pull
the red knob and hold it open, while tower is lifting
up. Raise the tower 7-8 ft. (2-2.5 m) and stop.
Release the red knob, and lower the tower boom. At
the end of stroke, hold the switch in the down posi-
tion. You will hear a hissing sound coming from the
upright. this is oil being replenished in the tower cir-
cuit. Hold the switch until the sound stops. (approx.
15-20 secs.) Repeat this procedure 2 more times.
Reconnect port #1 hose to the hyd. return filter.
11.
Disconnect the 1/4" hose at the port marked "MT"
(plug the port). Drain the hose into a container that
will hold approx. 2 gallons (8 L). Activate platform
rotate and hold for approx. 60 seconds each direc-
tion. Reconnect the hose to port "MT"
12.
Raise the tower boom to the end of stroke. Discon-
nect the hose from port #1 (plug the port) and drain
into a container that will hold approx. 3 gallons (11.5
L). Activate tower telescope out. At end of stroke,
reconnect the hose and retract the tower telescope
cylinder.
13.
Disconnect the hose at port #9 (plug the port), and
drain into a container that will hold approx. 4 gal-
lons. Activate main telescope out. At end of stroke,
reconnect the hose and retract the telescope func-
tion.
14.
From the ground control, tilt the platform back to the
end of stroke. Turn off the engine. Locate the master
cylinder and disconnect the rod end hose (plug the
port). NOTE: THERE WILL BE PRESSURE IN THIS
CIRCUIT. Drain this hose into a container that will
hold approx. 2 gallons, and activate platform level
down, to end of stroke. Reconnect hose. Cycle plat-
form level, 2 more times. Raise the tower boom to
full height. Disconnect the hose at port #12 and
drain into a container that will hold approx. 10 gal-
lons. Activate upper lift down to the end of stroke.
Reconnect the hose to port #12. Disconnect the
hose on port #11 (plug the port) and drain into a
container that will hold approx. 10 gallons (38 L).
Activate lift up to end of stroke. Reconnect the hose
to port #11.
NOTE:
After all functions have been cycled 2-3 times, check
the hydraulic oil tank level.
Содержание 740A
Страница 1: ...Service and Maintenance Manual Models 740A 740AJ P N 3121160 January 8 2013 ...
Страница 2: ......
Страница 20: ...xviii JLG Lift 3121160 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally ...
Страница 35: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 15 Figure 1 4 Torque Chart SAE Fasteners Sheet 1 of 3 ...
Страница 36: ...SECTION 1 SPECIFICATIONS 1 16 JLG Lift 3121160 Figure 1 5 Torque Chart SAE Fasteners Sheet 2 of 3 ...
Страница 37: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 17 Figure 1 6 Torque Chart SAE Fasteners Sheet 3 of 3 ...
Страница 38: ...SECTION 1 SPECIFICATIONS 1 18 JLG Lift 3121160 Figure 1 7 Torque Chart METRIC Fasteners Sheet 1 of 3 ...
Страница 39: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 19 Figure 1 8 Torque Chart METRIC Fasteners Sheet 2 of 3 ...
Страница 40: ...SECTION 1 SPECIFICATIONS 1 20 JLG Lift 3121160 Figure 1 9 Torque Chart METRIC Fasteners Sheet 3 of 3 ...
Страница 50: ...SECTION 2 GENERAL 2 10 JLG Lift 3121160 Figure 2 2 Engine Operating Temperature Specifications Ford 4150548 E ...
Страница 51: ...SECTION 2 GENERAL 3121160 JLG Lift 2 11 Figure 2 3 Engine Operating Temperature Specifications GM 4150548 E ...
Страница 52: ...SECTION 2 GENERAL 2 12 JLG Lift 3121160 NOTES ...
Страница 109: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 57 Figure 3 39 Swing Hub ...
Страница 111: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 59 Figure 3 40 Swing Brake Assembly Ausco Prior to S N 0300068040 ...
Страница 123: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 71 Figure 3 43 Swing Drive Hub Fairfield S N 0300068040 to Present ...
Страница 135: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 83 Figure 3 48 Rotary Coupling Port Location ...
Страница 138: ...SECTION 3 CHASSIS TURNTABLE 3 86 JLG Lift 3121160 A B D D B C Figure 3 51 Auxiliary Pump Sheet 1 of 2 ...
Страница 153: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 101 Figure 3 54 EFI Component Location ...
Страница 156: ...SECTION 3 CHASSIS TURNTABLE 3 104 JLG Lift 3121160 Figure 3 55 ECM EPM Identification ECM EPM ...
Страница 167: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 115 Figure 3 59 Deutz EMR 2 Troubleshooting Flow Chart ...
Страница 168: ...SECTION 3 CHASSIS TURNTABLE 3 116 JLG Lift 3121160 Figure 3 60 Deutz EMR 2 Vehicle Side Connection Diagram ...
Страница 169: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 117 Figure 3 61 Deutz EMR 2 Engine Side Connection Diagram Sheet 1 of 2 ...
Страница 170: ...SECTION 3 CHASSIS TURNTABLE 3 118 JLG Lift 3121160 Figure 3 62 Deutz EMR 2 Engine Side Connection Diagram Sheet 2 of 2 ...
Страница 171: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 119 Figure 3 63 EMR 2 Engine Plug Pin Identification ...
Страница 172: ...SECTION 3 CHASSIS TURNTABLE 3 120 JLG Lift 3121160 Figure 3 64 EMR 2 Vehicle Plug Pin Identification ...
Страница 173: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 121 Figure 3 65 EMR2 Fault Codes Sheet 1 of 5 ...
Страница 174: ...SECTION 3 CHASSIS TURNTABLE 3 122 JLG Lift 3121160 Figure 3 66 EMR2 Fault Codes Sheet 2 of 5 ...
Страница 175: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 123 Figure 3 67 EMR2 Fault Codes Sheet 3 of 5 ...
Страница 176: ...SECTION 3 CHASSIS TURNTABLE 3 124 JLG Lift 3121160 Figure 3 68 EMR2 Fault Codes Sheet 4 of 5 ...
Страница 177: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 125 Figure 3 69 EMR2 Fault Codes Sheet 5 of 5 ...
Страница 236: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3121160 Figure 4 7 Boom Valve and Limit Switches Location 0271989 A ...
Страница 237: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 21 Figure 4 8 Transportation Switch Installation CE Only 0258384 A ...
Страница 238: ...SECTION 4 BOOM PLATFORM 4 22 JLG Lift 3121160 Figure 4 9 Tower Power Track Installation Sheet 1 of 2 ...
Страница 239: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 23 Figure 4 10 Tower Power Track Installation Sheet 2 of 2 ...
Страница 244: ...SECTION 4 BOOM PLATFORM 4 28 JLG Lift 3121160 Figure 4 14 Rotator Assembly HELAC ...
Страница 276: ...SECTION 4 BOOM PLATFORM 4 60 JLG Lift 3121160 THIS SENSOR ON NON ADE MACHINES ONLY Figure 4 21 UMS Sensor Location ...
Страница 277: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 61 ADE MACHINES NON ADE MACHINES Figure 4 22 UMS Module Location ...
Страница 286: ...SECTION 4 BOOM PLATFORM 4 70 JLG Lift 3121160 NOTES ...
Страница 307: ...SECTION 5 HYDRAULICS 3121160 JLG Lift 5 21 Figure 5 17 Variable Displacement Pump Rexroth ...
Страница 316: ...SECTION 5 HYDRAULICS 5 30 JLG Lift 3121160 NOTES ...
Страница 319: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 3 Figure 6 2 ADE Block Diagram ...
Страница 325: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 9 Figure 6 8 Analyzer Flow Chart Version 5 X Software Sheet 2 of 4 ...
Страница 328: ...SECTION 6 JLG CONTROL SYSTEM 6 12 JLG Lift 3121160 Figure 6 11 Control Module Location ...
Страница 374: ...SECTION 6 JLG CONTROL SYSTEM 6 58 JLG Lift 3121160 NOTES ...
Страница 381: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121160 JLG Lift 7 7 Figure 7 11 Connector Installation ...
Страница 400: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 26 JLG Lift 3121160 Figure 7 34 Hydraulic Schematic Sheet 1 of 6 ...
Страница 402: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 28 JLG Lift 3121160 Figure 7 36 Hydraulic Schematic Sheet 3 of 6 ...
Страница 404: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 30 JLG Lift 3121160 Figure 7 38 Hydraulic Schematic Sheet 5 of 6 ...
Страница 406: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121160 NOTES ...
Страница 407: ......