SECTION 4 - BOOM & PLATFORM
3121160
– JLG Lift –
4-19
Assembly
1.
Align lift cylinder with attach holes in articulating jib
boom. Using a soft head mallet, install cylinder pin
#7 into articulating jib boom and secure with mount-
ing hardware.
2.
Align rotator support with attach hole in articulating
jib boom. Using a soft head mallet, install rotator
support pin #6 into articulating jib boom and secure
with mounting hardware.
3.
Align bottom tubes with attach holes in rotator sup-
port. Using a soft head mallet, install rotator support
pin #5 into articulating jib boom and secure with
mounting hardware.
4.
Align articulating jib boom with attach hole in articu-
lating jib boom pivot weldment. Using a soft head
mallet, install rotator support pin #4 into articulating
jib boom and secure with mounting hardware.
5.
Align bottom tubes with attach holes in articulating
jib boom pivot weldment. Using a soft head mallet,
install rotator support pin #3 into articulating jib
boom pivot weldment and secure with mounting
hardware.
6.
Align articulating jib boom pivot weldment with
attach holes in fly boom assembly. Using a soft head
mallet, install pivot pin #2 into fly boom assembly
and secure with mounting hardware.
7.
Align the slave leveling cylinder with attach holes in
articulating jib boom pivot weldment. Using a soft
head mallet, install slave leveling cylinder pin #1
into articulating jib boom pivot weldment and secure
with mounting hardware.
4.9 LIMIT SWITCHES ADJUSTMENT
Main Boom Horizontal Limit Switch
1.
Place machine on level surface.
2.
Raise main boom to 10 degrees above horizontal.
limit switch should activate before this point.
3.
Lower main boom until limit switch resets. this
should be 1 degree above to 4 degrees below hori-
zontal. (See Figure 4-7. for adjustments)
NOTE:
Angle indicator should be placed approx. 2 ft. from
the main boom pivot pin and the attach point on the
main boom. Tower angle switch must be reset before
main boom angle switch can be activated.
Tower Boom Horizontal Limit Switch
1.
Place machine on level surface.
2.
Raise Tower Boom to 13 degrees above horizontal.
The tower angle limit switch should activate at this
point.
3.
Lower the tower boom until the limit switch resets.
This should be 2 to 7 degrees below where the
switch was activated.
Содержание 740A
Страница 1: ...Service and Maintenance Manual Models 740A 740AJ P N 3121160 January 8 2013 ...
Страница 2: ......
Страница 20: ...xviii JLG Lift 3121160 LIST OF TABLES TABLE NO TITLE PAGE NO This page left blank intentionally ...
Страница 35: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 15 Figure 1 4 Torque Chart SAE Fasteners Sheet 1 of 3 ...
Страница 36: ...SECTION 1 SPECIFICATIONS 1 16 JLG Lift 3121160 Figure 1 5 Torque Chart SAE Fasteners Sheet 2 of 3 ...
Страница 37: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 17 Figure 1 6 Torque Chart SAE Fasteners Sheet 3 of 3 ...
Страница 38: ...SECTION 1 SPECIFICATIONS 1 18 JLG Lift 3121160 Figure 1 7 Torque Chart METRIC Fasteners Sheet 1 of 3 ...
Страница 39: ...SECTION 1 SPECIFICATIONS 3121160 JLG Lift 1 19 Figure 1 8 Torque Chart METRIC Fasteners Sheet 2 of 3 ...
Страница 40: ...SECTION 1 SPECIFICATIONS 1 20 JLG Lift 3121160 Figure 1 9 Torque Chart METRIC Fasteners Sheet 3 of 3 ...
Страница 50: ...SECTION 2 GENERAL 2 10 JLG Lift 3121160 Figure 2 2 Engine Operating Temperature Specifications Ford 4150548 E ...
Страница 51: ...SECTION 2 GENERAL 3121160 JLG Lift 2 11 Figure 2 3 Engine Operating Temperature Specifications GM 4150548 E ...
Страница 52: ...SECTION 2 GENERAL 2 12 JLG Lift 3121160 NOTES ...
Страница 109: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 57 Figure 3 39 Swing Hub ...
Страница 111: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 59 Figure 3 40 Swing Brake Assembly Ausco Prior to S N 0300068040 ...
Страница 123: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 71 Figure 3 43 Swing Drive Hub Fairfield S N 0300068040 to Present ...
Страница 135: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 83 Figure 3 48 Rotary Coupling Port Location ...
Страница 138: ...SECTION 3 CHASSIS TURNTABLE 3 86 JLG Lift 3121160 A B D D B C Figure 3 51 Auxiliary Pump Sheet 1 of 2 ...
Страница 153: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 101 Figure 3 54 EFI Component Location ...
Страница 156: ...SECTION 3 CHASSIS TURNTABLE 3 104 JLG Lift 3121160 Figure 3 55 ECM EPM Identification ECM EPM ...
Страница 167: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 115 Figure 3 59 Deutz EMR 2 Troubleshooting Flow Chart ...
Страница 168: ...SECTION 3 CHASSIS TURNTABLE 3 116 JLG Lift 3121160 Figure 3 60 Deutz EMR 2 Vehicle Side Connection Diagram ...
Страница 169: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 117 Figure 3 61 Deutz EMR 2 Engine Side Connection Diagram Sheet 1 of 2 ...
Страница 170: ...SECTION 3 CHASSIS TURNTABLE 3 118 JLG Lift 3121160 Figure 3 62 Deutz EMR 2 Engine Side Connection Diagram Sheet 2 of 2 ...
Страница 171: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 119 Figure 3 63 EMR 2 Engine Plug Pin Identification ...
Страница 172: ...SECTION 3 CHASSIS TURNTABLE 3 120 JLG Lift 3121160 Figure 3 64 EMR 2 Vehicle Plug Pin Identification ...
Страница 173: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 121 Figure 3 65 EMR2 Fault Codes Sheet 1 of 5 ...
Страница 174: ...SECTION 3 CHASSIS TURNTABLE 3 122 JLG Lift 3121160 Figure 3 66 EMR2 Fault Codes Sheet 2 of 5 ...
Страница 175: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 123 Figure 3 67 EMR2 Fault Codes Sheet 3 of 5 ...
Страница 176: ...SECTION 3 CHASSIS TURNTABLE 3 124 JLG Lift 3121160 Figure 3 68 EMR2 Fault Codes Sheet 4 of 5 ...
Страница 177: ...SECTION 3 CHASSIS TURNTABLE 3121160 JLG Lift 3 125 Figure 3 69 EMR2 Fault Codes Sheet 5 of 5 ...
Страница 236: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3121160 Figure 4 7 Boom Valve and Limit Switches Location 0271989 A ...
Страница 237: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 21 Figure 4 8 Transportation Switch Installation CE Only 0258384 A ...
Страница 238: ...SECTION 4 BOOM PLATFORM 4 22 JLG Lift 3121160 Figure 4 9 Tower Power Track Installation Sheet 1 of 2 ...
Страница 239: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 23 Figure 4 10 Tower Power Track Installation Sheet 2 of 2 ...
Страница 244: ...SECTION 4 BOOM PLATFORM 4 28 JLG Lift 3121160 Figure 4 14 Rotator Assembly HELAC ...
Страница 276: ...SECTION 4 BOOM PLATFORM 4 60 JLG Lift 3121160 THIS SENSOR ON NON ADE MACHINES ONLY Figure 4 21 UMS Sensor Location ...
Страница 277: ...SECTION 4 BOOM PLATFORM 3121160 JLG Lift 4 61 ADE MACHINES NON ADE MACHINES Figure 4 22 UMS Module Location ...
Страница 286: ...SECTION 4 BOOM PLATFORM 4 70 JLG Lift 3121160 NOTES ...
Страница 307: ...SECTION 5 HYDRAULICS 3121160 JLG Lift 5 21 Figure 5 17 Variable Displacement Pump Rexroth ...
Страница 316: ...SECTION 5 HYDRAULICS 5 30 JLG Lift 3121160 NOTES ...
Страница 319: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 3 Figure 6 2 ADE Block Diagram ...
Страница 325: ...SECTION 6 JLG CONTROL SYSTEM 3121160 JLG Lift 6 9 Figure 6 8 Analyzer Flow Chart Version 5 X Software Sheet 2 of 4 ...
Страница 328: ...SECTION 6 JLG CONTROL SYSTEM 6 12 JLG Lift 3121160 Figure 6 11 Control Module Location ...
Страница 374: ...SECTION 6 JLG CONTROL SYSTEM 6 58 JLG Lift 3121160 NOTES ...
Страница 381: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121160 JLG Lift 7 7 Figure 7 11 Connector Installation ...
Страница 400: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 26 JLG Lift 3121160 Figure 7 34 Hydraulic Schematic Sheet 1 of 6 ...
Страница 402: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 28 JLG Lift 3121160 Figure 7 36 Hydraulic Schematic Sheet 3 of 6 ...
Страница 404: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 30 JLG Lift 3121160 Figure 7 38 Hydraulic Schematic Sheet 5 of 6 ...
Страница 406: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121160 NOTES ...
Страница 407: ......