SECTION 4 - BOOM & PLATFORM
3121234
4-37
5.
Connect the hydraulic lines to the cylinder as tagged
during removal.
6.
Remove the supporting device and function check the
boom to make sure the lift cylinder operates properly
and there are no leaks.
4.8
WIRE ROPE
Each day before using the machine:
1.
Raise the main boom to approximately horizontal.
2.
Extend and retract the boom sections.
3.
Check for delayed movement of the fly section, which
indicates loose wire ropes.
Inspection
NOTE:
The pictures in this paragraph are just samples to show the
replacement criteria of the rope.
1.
Inspect ropes for broken wires, particularly valley wire
breaks and breaks at end terminations.
2.
Inspect ropes for corrosion.
3.
Inspect ropes for kinks or abuse.
4.
Inspect sheaves for condition of bearings/pins. (See
Dimension Of Sheaves for proper dimension.)
5.
Inspect sheaves for condition of flanges. (See Dimension
Of Sheaves for proper dimension.)
6.
Inspect sheaves with a groove wearout gauge for exces-
sive wear.
7.
Ropes passing inspection should be lubricated with wire
rope lubricant before reassembly.
Three Month Inspection
1.
Remove boom covers and visually (with flashlight)
inspect the ropes for rust, broken wires, frays, abuse, or
any signs of abnormalities.
2.
Check rope tension by deflecting the ropes by hand.
Properly tensioned ropes should have little or no move-
ment.
12 Year or 7000 Hour Replacement
Mandatory wire rope and sheave replacement.
Additional inspection required if:
1.
Machine is exposed to hostile environment or condi-
tions.
2.
Erratic boom operation or unusual noise exists.
3.
Machine is idle for an extended period.
4.
Boom is overloaded or sustained a shock load.
5.
Boom exposed to electrical arc. Wires may be fused
internally.
Replacement Criteria
1.
Sheaves and wire rope must be replaced as sets.
2.
Rusted or corroded wire ropes.
3.
Kinked, “bird caged”, or crushed ropes.
4.
Ropes at end of adjustment range.
5.
Sheaves failing wearout gage inspection.
6.
Ropes with 6 total broken wires in one rope lay, 3 in one
strand in one rope lay, 1 valley break, or 1 break at any
end termination.
Flexing a wire rope can often expose broken wires hidden in
valleys between strands.
A kink is caused by pulling down a loop
in a slack line during improper handling,
installation, or operation.
Observe the groove so that it may be clearly seen whether the
contour of the gauge matches the
contour of the bottom of the groove.
Содержание 680S
Страница 1: ...Service and Maintenance Manual Model 680S Prior to SN 0300189341 P N 3121234 December 05 2017 AS NZS...
Страница 2: ......
Страница 48: ...SECTION 2 GENERAL 2 10 3121234 Figure 2 1 Engine Operating Temperature Specifications Deutz 4150548 E...
Страница 49: ...SECTION 2 GENERAL 3121234 2 11 Figure 2 2 Engine Operating Temperature Specifications Ford 4150548 E...
Страница 50: ...SECTION 2 GENERAL 2 12 3121234 Figure 2 3 Engine Operating Temperature Specifications Caterpillar 4150548 E...
Страница 51: ...SECTION 2 GENERAL 3121234 2 13 Figure 2 4 Engine Operating Temperature Specifications GM 4150548 E...
Страница 52: ...SECTION 2 GENERAL 2 14 3121234 NOTES...
Страница 55: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 3 This page left blank intentionally...
Страница 86: ...SECTION 3 CHASSIS TURNTABLE 3 34 3121234 Figure 3 25 Assembly Tools Bearing Cone Pressing B Bearing...
Страница 87: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 35 Figure 3 26 Assembly Tools Bearing Cone Pressing A Bearing...
Страница 88: ...SECTION 3 CHASSIS TURNTABLE 3 36 3121234 Figure 3 27 Assembly Tools Bearing Cup Pressing A B Bearings...
Страница 89: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 37 Figure 3 28 Assembly Tools Seal Pressing...
Страница 90: ...SECTION 3 CHASSIS TURNTABLE 3 38 3121234 Figure 3 29 Assembly Tools Spacer Brake Disc Installation...
Страница 91: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 39 Figure 3 30 Assembly Tools Brake Retaining Ring Installation...
Страница 139: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 87 Figure 3 62 Swing Hub Prior to SN 0300134352...
Страница 143: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 91 Figure 3 64 Swing Brake...
Страница 196: ...SECTION 3 CHASSIS TURNTABLE 3 144 3121234 Figure 3 82 Rotary Coupling Port Location Prior to SN 0300137913 5 1660303 B...
Страница 205: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 153 This page left blank intentionally...
Страница 206: ...SECTION 3 CHASSIS TURNTABLE 3 154 3121234 Figure 3 89 Generator Troubleshooting Circuit Diagram Sheet 1 of 2...
Страница 207: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 155 Figure 3 90 Generator Troubleshooting Circuit Diagram Sheet 2 of 2...
Страница 208: ...SECTION 3 CHASSIS TURNTABLE 3 156 3121234 Figure 3 91 Generator Electrical Circuit Diagram...
Страница 209: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 157 Figure 3 92 Power Board PC1 Electrical Circuit Diagram...
Страница 210: ...SECTION 3 CHASSIS TURNTABLE 3 158 3121234 Figure 3 93 Power Board PC2 Electrical Circuit Diagram Sheet 1 of 2...
Страница 211: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 159 Figure 3 94 Power Board PC2 Electrical Circuit Diagram Sheet 2 of 2...
Страница 224: ...SECTION 3 CHASSIS TURNTABLE 3 172 3121234 Figure 3 103 EMR 2 Engine Side Equipment...
Страница 225: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 173 Figure 3 104 Deutz EMR 2 Troubleshooting Flow Chart...
Страница 226: ...SECTION 3 CHASSIS TURNTABLE 3 174 3121234 Figure 3 105 Deutz EMR 2 Vehicle Side Connection Diagram...
Страница 227: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 175 Figure 3 106 Deutz EMR 2 Engine Side Connection Diagram Sheet 1 of 2...
Страница 228: ...SECTION 3 CHASSIS TURNTABLE 3 176 3121234 Figure 3 107 Deutz EMR 2 Engine Side Connection Diagram Sheet 2 of 2...
Страница 229: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 177 Figure 3 108 EMR 2 Engine Plug Pin Identification...
Страница 230: ...SECTION 3 CHASSIS TURNTABLE 3 178 3121234 Figure 3 109 EMR 2 Vehicle Plug Pin Identification...
Страница 231: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 179 Figure 3 110 EMR2 Fault Codes Sheet 1 of 5...
Страница 232: ...SECTION 3 CHASSIS TURNTABLE 3 180 3121234 Figure 3 111 EMR2 Fault Codes Sheet 2 of 5...
Страница 233: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 181 Figure 3 112 EMR2 Fault Codes Sheet 3 of 5...
Страница 234: ...SECTION 3 CHASSIS TURNTABLE 3 182 3121234 Figure 3 113 EMR2 Fault Codes Sheet 4 of 5...
Страница 235: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 183 Figure 3 114 EMR2 Fault Codes Sheet 5 of 5...
Страница 264: ...SECTION 3 CHASSIS TURNTABLE 3 212 3121234 NOTES...
Страница 285: ...SECTION 4 BOOM PLATFORM 3121234 4 21 This page left blank intentionally...
Страница 286: ...SECTION 4 BOOM PLATFORM 4 22 3121234 Figure 4 7 Boom Assembly Cutaway Sheet 1 of 2 10 15 12 6 9...
Страница 333: ...SECTION 4 BOOM PLATFORM 3121234 4 69 Figure 4 25 Load Sensing Device...
Страница 336: ...SECTION 4 BOOM PLATFORM 4 72 3121234 NOTES...
Страница 402: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 66 3121234 Figure 5 100 Fault logic Troubleshooting...
Страница 403: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 3121234 5 67 Figure 5 101 Fault logic Troubleshooting...
Страница 404: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 68 3121234 Figure 5 102 Fault logic Troubleshooting...
Страница 407: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 3121234 5 71 This page left blank intentionally...
Страница 410: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 74 3121234 Figure 5 105 Hydraulic Schematic Sheet 3 of 8 SHEET 2...
Страница 412: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 76 3121234 Figure 5 107 Hydraulic Schematic Sheet 5 of 8 SHEET 3...
Страница 414: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 78 3121234 Figure 5 109 Hydraulic Schematic Sheet 7 of 8 SHEET 4...
Страница 416: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 80 3121234 NOTES...
Страница 423: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 7 Figure 6 2 ADE Block Diagram...
Страница 445: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 29 Figure 6 6 Analyzer Flow Chart Prior to Version 5 X Software Sheet 4 of 4...
Страница 447: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 31 Figure 6 8 Analyzer Flow Chart Version 5 X Software Sheet 2 of 4...
Страница 461: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 45 1 1001103667 Y Figure 6 22 Ground Control Module Sheet 1 of 3...
Страница 462: ...SECTION 6 JLG CONTROL SYSTEM 6 46 3121234 1 1001103667 Y Figure 6 23 Ground Control Module Sheet 2 of 3...
Страница 463: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 47 1 1001103667 Y Figure 6 24 Ground Control Module Sheet 3 of 3...
Страница 464: ...SECTION 6 JLG CONTROL SYSTEM 6 48 3121234 CONNECTOR 1001141138 D Figure 6 25 Platform Control Module Sheet 1 of 2...
Страница 465: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 49 CONNECTOR 1001141138 D Figure 6 26 Platform Control Module Sheet 2 of 2...
Страница 480: ...SECTION 6 JLG CONTROL SYSTEM 6 64 3121234 NOTES...
Страница 491: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121234 7 11 Figure 7 15 Connector Installation...
Страница 526: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 46 3121234 Figure 7 54 Electrical Schematic GM Sheet 1 of 2 SHEET 1...
Страница 528: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 48 3121234 NOTES...
Страница 529: ......