
SECTION 3 - CHASSIS & TURNTABLE
3-72
3121234
20.
Install orifice poppet (30).
21.
Install shift spool (31).
22.
Install spring retaining washers onto springs (32 and 33).
23.
Carefully install centering springs (34, 35 and 36).
24.
Install new O-rings (37, 38 and 39).
25.
Using a 5/8 in. wrench torque plug (40) to 20 ft. lbs.
(27 Nm).
26.
Using a 11/16 in. wrench, torque plugs (41 and 42) to
27 ft. lbs. (37 Nm).
Initial Start-up Procedures
Follow this procedure when starting-up a new motor or when
installing a motor that has been removed.
UNINTENDED MOVEMENT OF THE MACHINE OR MECHANISM MAY CAUSE
INJURY TO THE TECHNICIAN OR BYSTANDERS. TO PROTECT AGAINST UNIN-
TENDED MOVEMENT, SECURE THE MACHINE OR DISABLE / DISCONNECT THE
MECHANISM WHILE SERVICING.
Prior to installing the motor, inspect for damage incurred
during shipping. Make certain all system components (reser-
voir, hoses, valves, fittings, heat exchanger, etc.) are clean prior
to filling with fluid.
1.
Fill the reservoir with recommended hydraulic fluid.
Always filter fluid through a 10 micron filter when pour-
ing into the reservoir. Never reuse hydraulic fluid.
2.
Fill the inlet line leading from the pump to the reservoir.
Check the inlet line for properly tightened fittings and
be certain it is free of restrictions and air leaks.
3.
Fill the pump and motor housing with clean hydraulic
fluid. Pour filtered oil directly into the upper most case
drain port.
4.
To ensure the pump and motor stay filled with oil, install
case drain lines into the upper most case drain ports.
5.
Install a 0 to 500 psi (0 to 35 bar) gauge in the charge
pressure gauge port of the pump to monitor system
pressure during start up.
NOTE:
Follow recommendations in the vehicle / machine opera-
tor’s manual for prime mover start up procedures.
6.
While watching the pressure gauge, run the engine at
the lowest possible speed until system pressure builds
to normal levels (minimum 160 psi (11 bar)). Once sys-
tem pressure is established, increase to full operating
speed. If system pressure is not maintained, shut down
the prime mover, determine cause and take corrective
action.
7.
Operate the hydraulic system for at least fifteen minutes
under light load conditions.
8.
Check and adjust control settings as necessary after
installation.
9.
Shut down the prime mover and remove the pressure
gauge. Replace plug at the charge pressure gauge port.
10.
Check the fluid level in the reservoir; add clean filtered
fluid if necessary. The motor is now ready for operation.
39
40
34
30
41
37
36
33
42
38
35
32
31
(27 Nm)
20 ft.lbs.
5/8 in
(37 Nm)
(37 Nm)
27 ft.lbs.
27 ft.lbs.
11/16 in
11/16 in
30. Orifice Poppet
31. Shift Spool
32. Spring
33. Spring
34. Spring
35. Spring
36. Spring
37. O-ring
38. O-ring
39. O-ring
40. Plug
41. Plug
42. Plug
Figure 3-58. Loop Flushing Spool
Содержание 680S
Страница 1: ...Service and Maintenance Manual Model 680S Prior to SN 0300189341 P N 3121234 December 05 2017 AS NZS...
Страница 2: ......
Страница 48: ...SECTION 2 GENERAL 2 10 3121234 Figure 2 1 Engine Operating Temperature Specifications Deutz 4150548 E...
Страница 49: ...SECTION 2 GENERAL 3121234 2 11 Figure 2 2 Engine Operating Temperature Specifications Ford 4150548 E...
Страница 50: ...SECTION 2 GENERAL 2 12 3121234 Figure 2 3 Engine Operating Temperature Specifications Caterpillar 4150548 E...
Страница 51: ...SECTION 2 GENERAL 3121234 2 13 Figure 2 4 Engine Operating Temperature Specifications GM 4150548 E...
Страница 52: ...SECTION 2 GENERAL 2 14 3121234 NOTES...
Страница 55: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 3 This page left blank intentionally...
Страница 86: ...SECTION 3 CHASSIS TURNTABLE 3 34 3121234 Figure 3 25 Assembly Tools Bearing Cone Pressing B Bearing...
Страница 87: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 35 Figure 3 26 Assembly Tools Bearing Cone Pressing A Bearing...
Страница 88: ...SECTION 3 CHASSIS TURNTABLE 3 36 3121234 Figure 3 27 Assembly Tools Bearing Cup Pressing A B Bearings...
Страница 89: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 37 Figure 3 28 Assembly Tools Seal Pressing...
Страница 90: ...SECTION 3 CHASSIS TURNTABLE 3 38 3121234 Figure 3 29 Assembly Tools Spacer Brake Disc Installation...
Страница 91: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 39 Figure 3 30 Assembly Tools Brake Retaining Ring Installation...
Страница 139: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 87 Figure 3 62 Swing Hub Prior to SN 0300134352...
Страница 143: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 91 Figure 3 64 Swing Brake...
Страница 196: ...SECTION 3 CHASSIS TURNTABLE 3 144 3121234 Figure 3 82 Rotary Coupling Port Location Prior to SN 0300137913 5 1660303 B...
Страница 205: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 153 This page left blank intentionally...
Страница 206: ...SECTION 3 CHASSIS TURNTABLE 3 154 3121234 Figure 3 89 Generator Troubleshooting Circuit Diagram Sheet 1 of 2...
Страница 207: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 155 Figure 3 90 Generator Troubleshooting Circuit Diagram Sheet 2 of 2...
Страница 208: ...SECTION 3 CHASSIS TURNTABLE 3 156 3121234 Figure 3 91 Generator Electrical Circuit Diagram...
Страница 209: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 157 Figure 3 92 Power Board PC1 Electrical Circuit Diagram...
Страница 210: ...SECTION 3 CHASSIS TURNTABLE 3 158 3121234 Figure 3 93 Power Board PC2 Electrical Circuit Diagram Sheet 1 of 2...
Страница 211: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 159 Figure 3 94 Power Board PC2 Electrical Circuit Diagram Sheet 2 of 2...
Страница 224: ...SECTION 3 CHASSIS TURNTABLE 3 172 3121234 Figure 3 103 EMR 2 Engine Side Equipment...
Страница 225: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 173 Figure 3 104 Deutz EMR 2 Troubleshooting Flow Chart...
Страница 226: ...SECTION 3 CHASSIS TURNTABLE 3 174 3121234 Figure 3 105 Deutz EMR 2 Vehicle Side Connection Diagram...
Страница 227: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 175 Figure 3 106 Deutz EMR 2 Engine Side Connection Diagram Sheet 1 of 2...
Страница 228: ...SECTION 3 CHASSIS TURNTABLE 3 176 3121234 Figure 3 107 Deutz EMR 2 Engine Side Connection Diagram Sheet 2 of 2...
Страница 229: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 177 Figure 3 108 EMR 2 Engine Plug Pin Identification...
Страница 230: ...SECTION 3 CHASSIS TURNTABLE 3 178 3121234 Figure 3 109 EMR 2 Vehicle Plug Pin Identification...
Страница 231: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 179 Figure 3 110 EMR2 Fault Codes Sheet 1 of 5...
Страница 232: ...SECTION 3 CHASSIS TURNTABLE 3 180 3121234 Figure 3 111 EMR2 Fault Codes Sheet 2 of 5...
Страница 233: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 181 Figure 3 112 EMR2 Fault Codes Sheet 3 of 5...
Страница 234: ...SECTION 3 CHASSIS TURNTABLE 3 182 3121234 Figure 3 113 EMR2 Fault Codes Sheet 4 of 5...
Страница 235: ...SECTION 3 CHASSIS TURNTABLE 3121234 3 183 Figure 3 114 EMR2 Fault Codes Sheet 5 of 5...
Страница 264: ...SECTION 3 CHASSIS TURNTABLE 3 212 3121234 NOTES...
Страница 285: ...SECTION 4 BOOM PLATFORM 3121234 4 21 This page left blank intentionally...
Страница 286: ...SECTION 4 BOOM PLATFORM 4 22 3121234 Figure 4 7 Boom Assembly Cutaway Sheet 1 of 2 10 15 12 6 9...
Страница 333: ...SECTION 4 BOOM PLATFORM 3121234 4 69 Figure 4 25 Load Sensing Device...
Страница 336: ...SECTION 4 BOOM PLATFORM 4 72 3121234 NOTES...
Страница 402: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 66 3121234 Figure 5 100 Fault logic Troubleshooting...
Страница 403: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 3121234 5 67 Figure 5 101 Fault logic Troubleshooting...
Страница 404: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 68 3121234 Figure 5 102 Fault logic Troubleshooting...
Страница 407: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 3121234 5 71 This page left blank intentionally...
Страница 410: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 74 3121234 Figure 5 105 Hydraulic Schematic Sheet 3 of 8 SHEET 2...
Страница 412: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 76 3121234 Figure 5 107 Hydraulic Schematic Sheet 5 of 8 SHEET 3...
Страница 414: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 78 3121234 Figure 5 109 Hydraulic Schematic Sheet 7 of 8 SHEET 4...
Страница 416: ...SECTION 5 BASIC HYDRAULICS INFORMATION SCHEMATICS 5 80 3121234 NOTES...
Страница 423: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 7 Figure 6 2 ADE Block Diagram...
Страница 445: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 29 Figure 6 6 Analyzer Flow Chart Prior to Version 5 X Software Sheet 4 of 4...
Страница 447: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 31 Figure 6 8 Analyzer Flow Chart Version 5 X Software Sheet 2 of 4...
Страница 461: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 45 1 1001103667 Y Figure 6 22 Ground Control Module Sheet 1 of 3...
Страница 462: ...SECTION 6 JLG CONTROL SYSTEM 6 46 3121234 1 1001103667 Y Figure 6 23 Ground Control Module Sheet 2 of 3...
Страница 463: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 47 1 1001103667 Y Figure 6 24 Ground Control Module Sheet 3 of 3...
Страница 464: ...SECTION 6 JLG CONTROL SYSTEM 6 48 3121234 CONNECTOR 1001141138 D Figure 6 25 Platform Control Module Sheet 1 of 2...
Страница 465: ...SECTION 6 JLG CONTROL SYSTEM 3121234 6 49 CONNECTOR 1001141138 D Figure 6 26 Platform Control Module Sheet 2 of 2...
Страница 480: ...SECTION 6 JLG CONTROL SYSTEM 6 64 3121234 NOTES...
Страница 491: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121234 7 11 Figure 7 15 Connector Installation...
Страница 526: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 46 3121234 Figure 7 54 Electrical Schematic GM Sheet 1 of 2 SHEET 1...
Страница 528: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 48 3121234 NOTES...
Страница 529: ......