SECTION 2 - GENERAL
3120746
– JLG Lift –
2-1
SECTION 2. GENERAL
2.1 MACHINE PREPARATION, INSPECTION,
AND MAINTENANCE
General
This section provides the necessary information needed
by those personnel that are responsible to place the
machine in operation readiness and maintain its safe
operating condition. For maximum service life and safe
operation, ensure that all the necessary inspections and
maintenance have been completed before placing the
machine into service.
Preparation, Inspection, and Maintenance
It is important to establish and conform to a comprehen-
sive inspection and preventive maintenance program. The
following table outlines the periodic machine inspections
and maintenance recommended by JLG Industries, Inc.
Consult your national, regional, or local regulations for fur-
ther requirements for aerial work platforms. The frequency
of inspections and maintenance must be increased as
environment, severity and frequency of usage requires.
Pre-Start Inspection
It is the User’s or Operator’s primary responsibility to per-
form a Pre-Start Inspection of the machine prior to use
daily or at each change of operator. Reference the Opera-
tor’s and Safety Manual for completion procedures for the
Pre-Start Inspection. The Operator and Safety Manual
must be read in its entirety and understood prior to per-
forming the Pre-Start Inspection.
Pre-Delivery Inspection and Frequent
Inspection
The Pre-Delivery Inspection and Frequent Inspection shall
be performed by a qualified JLG equipment mechanic.
JLG Industries, Inc. recognizes a qualified JLG equipment
mechanic as a person who, by possession of a recog-
nized degree, certificate, extensive knowledge, training, or
experience, has successfully demonstrated the ability and
proficiency to service, repair, and maintain the subject
JLG product model.
The Pre-Delivery Inspection and Frequent Inspection pro-
cedures are performed in the same manner, but at differ-
ent times. The Pre-Delivery Inspection shall be performed
prior to each sale, lease, or rental delivery. The Frequent
Inspection shall be accomplished for each machine in ser-
vice for 3 months or 150 hours (whichever comes first);
out of service for a period of more than 3 months; or when
purchased used. The frequency of this inspection must be
increased as environment, severity and frequency of
usage requires.
Reference the JLG Pre-Delivery and Frequent Inspection
Form and the Inspection and Preventative Maintenance
Schedule for items requiring inspection during the perfor-
mance of these inspections. Reference the appropriate
areas of this manual for servicing and maintenance proce-
dures.
Annual Machine Inspection
The Annual Machine Inspection must be performed by a
Factory-Certified Service Technician on an annual basis,
no later than thirteen (13) months from the date of the
prior Annual Machine Inspection. JLG Industries, Inc. rec-
ognizes a Factory-Certified Service Technician as a per-
son who has successfully completed the JLG Service
Training School for the subject JLG product model. Refer-
ence the machine Service and Maintenance Manual and
appropriate JLG inspection form for performance of this
inspection.
Reference the JLG Annual Machine Inspection Form and
the Inspection and Preventative Maintenance Schedule for
items requiring inspection during the performance of this
inspection. Reference the appropriate areas of this man-
ual for servicing and maintenance procedures.
For the purpose of receiving safety-related bulletins, it is
important that JLG Industries, Inc. has updated ownership
information for each machine. When performing each
Annual Machine Inspection, notify JLG Industries, Inc. of
the current machine ownership.
Preventative Maintenance
In conjunction with the specified inspections, mainte-
nance shall be performed by a qualified JLG equipment
mechanic. JLG Industries, Inc. recognizes a qualified JLG
equipment mechanic as a person who, by possession of a
recognized degree, certificate, extensive knowledge, train-
ing, or experience, has successfully demonstrated the
ability and proficiency to service, repair, and maintain the
subject JLG product model.
Reference the Preventative Maintenance Schedule and
the appropriate areas of this manual for servicing and
maintenance procedures. The frequency of service and
maintenance must be increased as environment, severity
and frequency of usage requires.
Содержание 601S
Страница 1: ...Service and Maintenance Manual Model 601S P N 3120746 November 22 2016 ...
Страница 2: ......
Страница 4: ... JLG Lift THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 16: ...x JLG Lift 3120746 TABLE OF CONTENTS Continued This page left blank intentionally ...
Страница 26: ...SECTION 1 SPECIFICATIONS 1 10 JLG Lift 3120746 Figure 1 3 Torque Chart ...
Страница 36: ...SECTION 2 GENERAL 2 10 JLG Lift 3120746 Figure 2 7 Connector Installation ...
Страница 40: ...SECTION 2 GENERAL 2 14 JLG Lift 3120746 This page left blank intentionally ...
Страница 49: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 9 Figure 3 1 Torque Hub Drive Fairfield ...
Страница 51: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 11 Figure 3 2 Torque Hub Drive Auburn Gear ...
Страница 53: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 13 Figure 3 3 Drive Brake Assembly Ausco ...
Страница 88: ...SECTION 3 CHASSIS TURNTABLE 3 48 JLG Lift 3120746 Figure 3 38 Swing Bearing Tolerance Boom Placement ...
Страница 91: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 51 Figure 3 40 Swing Brake Assembly Ausco ...
Страница 99: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 59 ...
Страница 119: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 79 Figure 3 46 EFI Component Location ...
Страница 122: ...SECTION 3 CHASSIS TURNTABLE 3 82 JLG Lift 3120746 Figure 3 47 ECM EPM Identification ECM EPM ...
Страница 128: ...SECTION 3 CHASSIS TURNTABLE 3 88 JLG Lift 3120746 This page left blank intentionally ...
Страница 132: ...SECTION 4 BOOM PLATFORM 4 4 JLG Lift 3120746 Figure 4 5 Boom Assembly Cutaway Sheet 1 of 2 ...
Страница 133: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 5 Figure 4 6 Boom Assembly Cutaway Sheet 2 of 2 ...
Страница 145: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 17 Figure 4 22 Rotator Assembly Helac ...
Страница 148: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3120746 This page left blank intentionally ...
Страница 160: ...SECTION 5 HYDRAULICS 5 12 JLG Lift 3120746 Figure 5 16 Troubleshooting System Response is Sluggish ...
Страница 174: ...SECTION 5 HYDRAULICS 5 26 JLG Lift 3120746 This page left blank intentionally ...
Страница 176: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 2 JLG Lift 3120746 Figure 6 1 EPBCS Block Diagram ...
Страница 180: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 6 JLG Lift 3120746 Figure 6 3 Control Module and Fault Code Indicator Location ...
Страница 183: ...SECTION 6 JLG CONTROL SYSTEM ADE 3120746 JLG Lift 6 9 Figure 6 4 Analyzer Flow Chart Sheet 1 of 3 ...
Страница 184: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 10 JLG Lift 3120746 Figure 6 5 Analyzer Flow Chart Sheet 2 of 3 ...
Страница 185: ...SECTION 6 JLG CONTROL SYSTEM ADE 3120746 JLG Lift 6 11 Figure 6 6 Analyzer Flow Chart Sheet 3 of 3 ...
Страница 224: ...SECTION 7 SCHEMATICS 7 2 JLG Lift 3120746 Figure 7 1 Electrical Components Installation Prior to S N 62137 Sheet 1 of 2 ...
Страница 225: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 3 Figure 7 2 Electrical Components Installation Prior to S N 62137 Sheet 2 of 2 ...
Страница 228: ...SECTION 7 SCHEMATICS 7 6 JLG Lift 3120746 Figure 7 5 Electrical Schematic Deutz Engine Sheet 1 of 2 ...
Страница 229: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 7 Figure 7 6 Electrical Schematic Deutz Engine Sheet 2 of 2 1870074 C ...
Страница 230: ...SECTION 7 SCHEMATICS 7 8 JLG Lift 3120746 Figure 7 7 Electrical Schematic Ford Dual Fuel Engine Sheet 1 of 2 ...
Страница 231: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 9 Figure 7 8 Electrical Schematic Ford Dual Fuel Engine Sheet 2 of 2 1870077 A ...
Страница 232: ...SECTION 7 SCHEMATICS 7 10 JLG Lift 3120746 Figure 7 9 Electrical Schematic Ford EFI Engine Sheet 1 of 2 ...
Страница 233: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 11 Figure 7 10 Electrical Schematic Ford EFI Engine Sheet 2 of 2 1870127 A ...
Страница 234: ...SECTION 7 SCHEMATICS 7 12 JLG Lift 3120746 Figure 7 11 Electrical Schematic ADE Machines Sheet 1 of 4 ...
Страница 235: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 13 Figure 7 12 Electrical Schematic ADE Machines Sheet 2 of 4 1870132 G ...
Страница 236: ...SECTION 7 SCHEMATICS 7 14 JLG Lift 3120746 Figure 7 13 Electrical Schematic ADE Machines Sheet 3 of 4 ...
Страница 237: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 15 Figure 7 14 Electrical Schematic ADE Machines Sheet 4 of 4 1870132 G ...
Страница 238: ...SECTION 7 SCHEMATICS 7 16 JLG Lift 3120746 Figure 7 15 Hydraulic Schematic Sheet 1 of 4 ...
Страница 239: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 17 Figure 7 16 Hydraulic Schematic Sheet 2 of 4 2792338 A ...
Страница 240: ...SECTION 7 SCHEMATICS 7 18 JLG Lift 3120746 Figure 7 17 Hydraulic Schematic Sheet 3 of 4 ...
Страница 241: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 19 Figure 7 18 Hydraulic Schematic Sheet 4 of 4 2792338 A ...
Страница 242: ...SECTION 7 SCHEMATICS 7 20 JLG Lift 3120746 This page left blank intentionally ...
Страница 243: ......