SECTION 5 - HYDRAULICS
3120746
– JLG Lift –
5-9
5. Secure the sling and lifting device at the telescope
cylinder’s approximate center of gravity, and lift the
cylinder to the aft end of the boom assembly.
WHEN INSERTING THE TELESCOPE CYLINDER INTO THE BOOM,
IT MAY BE NECESSARY AT SOME POINT TO TURN THE CYLIN-
DER SLIGHTLY IN ORDER TO CLEAR ASSEMBLIES MOUNTED
WITHIN THE BOOM. CARE MUST BE TAKEN TO MOVE THE CYL-
INDER SLOWLY INTO POSITION: DAMAGE TO COMPONENTS
MAY RESULT FROM FORCIBLE IMPACT WITH THESE ASSEM-
BLIES.
6. Carefully install the telescope cylinder barrel end
support into slots in mid boom and secure with
blocks and bolts. Use Loctite #242 on bolts.
7. Align holes in aft end of the fly boom section with
holes in cable mounting block, then secure with
mounting hardware.
8. Align holes in aft end of the base boom section with
holes in cable mounting block, then secure with
mounting hardware.
9. Remove cylinder port plugs and hydraulic line caps
and correctly attach lines to cylinder ports.
10. Align holes in rod end of the telescope cylinder with
holes in push bar. Install push bar pin and secure
with mounting hardware.
11. Align holes in push bar with holes in turntable. Install
push bar pin and secure with mounting hardware.
NOTE:
Boom cables must be torqued after installation of the
telescope cylinder. (See Boom Rope Torquing Pro-
cedures.)
Boom Lift Cylinder Removal
1. Place the machine on a flat and level surface. Start
the engine and place the main boom in the horizon-
tal position. Shut down engine and prop the boom.
2. Remove the hardware retaining the cylinder rod
attach pin to the boom. Using a suitable brass drift,
drive out the cylinder rod attach pin.
3. Using auxiliary power, retract the lift cylinder rod
completely.
4. Disconnect, cap and tag the main boom lift cylinder
hydraulic lines and ports.
5. Remove barrel end attach pin retaining hardware.
Using a suitable brass drift drive out the barrel end
attach pin from the turntable.
6. Remove the cylinder from the turntable and place in
a suitable work area.
Boom Lift Cylinder Installation
1. Install lift cylinder in place using suitable slings or
supports, aligning attach pin mounting holes on the
turntable.
2. Using a suitable drift, drive the barrel end attach pin
through the mounting holes in the lift cylinder and
the turntable. Secure in place with the pin retaining
hardware.
3. Remove cylinder port plugs and hydraulic line caps
and correctly attach lines to cylinder ports.
4. Using auxiliary power, extend the cylinder rod until
the attach pin hole aligns with those in the boom.
Using a suitable soft mallet, drive the cylinder rod
attach pin through the boom and lift cylinder. Secure
the pin in place with attaching hardware.
5. Remove boom prop and overhead crane. Activate
hydraulic system.
6. Using all applicable safety precautions, operate the
boom functions. Check for correct operation and
hydraulic leaks. Secure as necessary.
7. Check fluid level of hydraulic tank and adjust as nec-
essary.
Содержание 601S
Страница 1: ...Service and Maintenance Manual Model 601S P N 3120746 November 22 2016 ...
Страница 2: ......
Страница 4: ... JLG Lift THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 16: ...x JLG Lift 3120746 TABLE OF CONTENTS Continued This page left blank intentionally ...
Страница 26: ...SECTION 1 SPECIFICATIONS 1 10 JLG Lift 3120746 Figure 1 3 Torque Chart ...
Страница 36: ...SECTION 2 GENERAL 2 10 JLG Lift 3120746 Figure 2 7 Connector Installation ...
Страница 40: ...SECTION 2 GENERAL 2 14 JLG Lift 3120746 This page left blank intentionally ...
Страница 49: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 9 Figure 3 1 Torque Hub Drive Fairfield ...
Страница 51: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 11 Figure 3 2 Torque Hub Drive Auburn Gear ...
Страница 53: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 13 Figure 3 3 Drive Brake Assembly Ausco ...
Страница 88: ...SECTION 3 CHASSIS TURNTABLE 3 48 JLG Lift 3120746 Figure 3 38 Swing Bearing Tolerance Boom Placement ...
Страница 91: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 51 Figure 3 40 Swing Brake Assembly Ausco ...
Страница 99: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 59 ...
Страница 119: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 79 Figure 3 46 EFI Component Location ...
Страница 122: ...SECTION 3 CHASSIS TURNTABLE 3 82 JLG Lift 3120746 Figure 3 47 ECM EPM Identification ECM EPM ...
Страница 128: ...SECTION 3 CHASSIS TURNTABLE 3 88 JLG Lift 3120746 This page left blank intentionally ...
Страница 132: ...SECTION 4 BOOM PLATFORM 4 4 JLG Lift 3120746 Figure 4 5 Boom Assembly Cutaway Sheet 1 of 2 ...
Страница 133: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 5 Figure 4 6 Boom Assembly Cutaway Sheet 2 of 2 ...
Страница 145: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 17 Figure 4 22 Rotator Assembly Helac ...
Страница 148: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3120746 This page left blank intentionally ...
Страница 160: ...SECTION 5 HYDRAULICS 5 12 JLG Lift 3120746 Figure 5 16 Troubleshooting System Response is Sluggish ...
Страница 174: ...SECTION 5 HYDRAULICS 5 26 JLG Lift 3120746 This page left blank intentionally ...
Страница 176: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 2 JLG Lift 3120746 Figure 6 1 EPBCS Block Diagram ...
Страница 180: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 6 JLG Lift 3120746 Figure 6 3 Control Module and Fault Code Indicator Location ...
Страница 183: ...SECTION 6 JLG CONTROL SYSTEM ADE 3120746 JLG Lift 6 9 Figure 6 4 Analyzer Flow Chart Sheet 1 of 3 ...
Страница 184: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 10 JLG Lift 3120746 Figure 6 5 Analyzer Flow Chart Sheet 2 of 3 ...
Страница 185: ...SECTION 6 JLG CONTROL SYSTEM ADE 3120746 JLG Lift 6 11 Figure 6 6 Analyzer Flow Chart Sheet 3 of 3 ...
Страница 224: ...SECTION 7 SCHEMATICS 7 2 JLG Lift 3120746 Figure 7 1 Electrical Components Installation Prior to S N 62137 Sheet 1 of 2 ...
Страница 225: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 3 Figure 7 2 Electrical Components Installation Prior to S N 62137 Sheet 2 of 2 ...
Страница 228: ...SECTION 7 SCHEMATICS 7 6 JLG Lift 3120746 Figure 7 5 Electrical Schematic Deutz Engine Sheet 1 of 2 ...
Страница 229: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 7 Figure 7 6 Electrical Schematic Deutz Engine Sheet 2 of 2 1870074 C ...
Страница 230: ...SECTION 7 SCHEMATICS 7 8 JLG Lift 3120746 Figure 7 7 Electrical Schematic Ford Dual Fuel Engine Sheet 1 of 2 ...
Страница 231: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 9 Figure 7 8 Electrical Schematic Ford Dual Fuel Engine Sheet 2 of 2 1870077 A ...
Страница 232: ...SECTION 7 SCHEMATICS 7 10 JLG Lift 3120746 Figure 7 9 Electrical Schematic Ford EFI Engine Sheet 1 of 2 ...
Страница 233: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 11 Figure 7 10 Electrical Schematic Ford EFI Engine Sheet 2 of 2 1870127 A ...
Страница 234: ...SECTION 7 SCHEMATICS 7 12 JLG Lift 3120746 Figure 7 11 Electrical Schematic ADE Machines Sheet 1 of 4 ...
Страница 235: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 13 Figure 7 12 Electrical Schematic ADE Machines Sheet 2 of 4 1870132 G ...
Страница 236: ...SECTION 7 SCHEMATICS 7 14 JLG Lift 3120746 Figure 7 13 Electrical Schematic ADE Machines Sheet 3 of 4 ...
Страница 237: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 15 Figure 7 14 Electrical Schematic ADE Machines Sheet 4 of 4 1870132 G ...
Страница 238: ...SECTION 7 SCHEMATICS 7 16 JLG Lift 3120746 Figure 7 15 Hydraulic Schematic Sheet 1 of 4 ...
Страница 239: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 17 Figure 7 16 Hydraulic Schematic Sheet 2 of 4 2792338 A ...
Страница 240: ...SECTION 7 SCHEMATICS 7 18 JLG Lift 3120746 Figure 7 17 Hydraulic Schematic Sheet 3 of 4 ...
Страница 241: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 19 Figure 7 18 Hydraulic Schematic Sheet 4 of 4 2792338 A ...
Страница 242: ...SECTION 7 SCHEMATICS 7 20 JLG Lift 3120746 This page left blank intentionally ...
Страница 243: ......