SECTION 4 - BOOM & PLATFORM
3120746
– JLG Lift –
4-7
7. Inspect upper lift cylinder attach pin for wear, scor-
ing, tapering and ovality, or other damage. Ensure
pin surfaces are protected prior to installation.
Replace pins as necessary.
8. Inspect inner diameter of boom pivot bushing for
scoring, distortion, wear, or other damage. Replace
bearing as necessary.
9. Inspect all wear pads for excessive wear or other
damage. Replace pads when worn to within 1/8 inch
(3.2 mm) of threaded insert.
10. Inspect extend and retract wire rope attach point
components for cracks, stretching, distortion, or
other damage. Replace components as necessary.
11. Inspect all threaded components for damage such
as stretching, thread deformation, or twisting.
Replace as necessary.
12. Inspect structural units of boom assembly for bend-
ing, cracking, separation of welds, or other damage.
Replace boom sections as necessary.
Assembly
NOTE:
When installing fly section wear pads, install same
number and thickness of shims as were removed
during disassembly.
1. Measure inside dimensions of the base and mid
sections to determine the number of shims required
for proper lift.
2. Measure inside dimensions of the mid section to
determine the number of shims required for proper
lift.
3. Install side, top and bottom wear pads to the aft end
of fly section; shim evenly to the measurements of
the inside of mid section.
4. Install retract wire ropes into aft end of fly section,
route wire ropes thru holes in side of fly boom sec-
tion and pull into slot.
5. Install side, top and bottom wear pads to the aft end
of mid section; shim evenly to the measurements of
the inside of mid section.
WHEN ASSEMBLING BOOM SECTIONS, ENSURE THAT THE
BOOM SLIDING TRAJECTORIES HAVE BEEN CLEARED OF
CHAINS, TOOLS, AND OTHER OBSTRUCTIONS.
6. Shim the insides of the boom sections for a total of
1/16 inch (0.062) clearance (if the action is centered,
there will be 1/32 clearance on each side).
7. Slide fly boom section into the mid boom section.
Shim boom, if necessary, for a total of 1/16 inch
(0.062) clearance.
8. Install wear pads into the forward position of the mid
boom section. Shim boom, if necessary, for a total of
2/10 inch (0.20) clearance.
9. Properly position the retraction wire rope sheaves
assemblies at the aft end of the mid boom section;
ensure all sheave-to-mounting block attachment
holes align. Install the sheave pins and secure them
with mounting hardware. Position retract wire ropes
onto the sheaves.
Figure 4-9. Routing Installation of Retract Wire Ropes
Содержание 601S
Страница 1: ...Service and Maintenance Manual Model 601S P N 3120746 November 22 2016 ...
Страница 2: ......
Страница 4: ... JLG Lift THIS PAGE LEFT BLANK INTENTIONALLY ...
Страница 16: ...x JLG Lift 3120746 TABLE OF CONTENTS Continued This page left blank intentionally ...
Страница 26: ...SECTION 1 SPECIFICATIONS 1 10 JLG Lift 3120746 Figure 1 3 Torque Chart ...
Страница 36: ...SECTION 2 GENERAL 2 10 JLG Lift 3120746 Figure 2 7 Connector Installation ...
Страница 40: ...SECTION 2 GENERAL 2 14 JLG Lift 3120746 This page left blank intentionally ...
Страница 49: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 9 Figure 3 1 Torque Hub Drive Fairfield ...
Страница 51: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 11 Figure 3 2 Torque Hub Drive Auburn Gear ...
Страница 53: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 13 Figure 3 3 Drive Brake Assembly Ausco ...
Страница 88: ...SECTION 3 CHASSIS TURNTABLE 3 48 JLG Lift 3120746 Figure 3 38 Swing Bearing Tolerance Boom Placement ...
Страница 91: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 51 Figure 3 40 Swing Brake Assembly Ausco ...
Страница 99: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 59 ...
Страница 119: ...SECTION 3 CHASSIS TURNTABLE 3120746 JLG Lift 3 79 Figure 3 46 EFI Component Location ...
Страница 122: ...SECTION 3 CHASSIS TURNTABLE 3 82 JLG Lift 3120746 Figure 3 47 ECM EPM Identification ECM EPM ...
Страница 128: ...SECTION 3 CHASSIS TURNTABLE 3 88 JLG Lift 3120746 This page left blank intentionally ...
Страница 132: ...SECTION 4 BOOM PLATFORM 4 4 JLG Lift 3120746 Figure 4 5 Boom Assembly Cutaway Sheet 1 of 2 ...
Страница 133: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 5 Figure 4 6 Boom Assembly Cutaway Sheet 2 of 2 ...
Страница 145: ...SECTION 4 BOOM PLATFORM 3120746 JLG Lift 4 17 Figure 4 22 Rotator Assembly Helac ...
Страница 148: ...SECTION 4 BOOM PLATFORM 4 20 JLG Lift 3120746 This page left blank intentionally ...
Страница 160: ...SECTION 5 HYDRAULICS 5 12 JLG Lift 3120746 Figure 5 16 Troubleshooting System Response is Sluggish ...
Страница 174: ...SECTION 5 HYDRAULICS 5 26 JLG Lift 3120746 This page left blank intentionally ...
Страница 176: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 2 JLG Lift 3120746 Figure 6 1 EPBCS Block Diagram ...
Страница 180: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 6 JLG Lift 3120746 Figure 6 3 Control Module and Fault Code Indicator Location ...
Страница 183: ...SECTION 6 JLG CONTROL SYSTEM ADE 3120746 JLG Lift 6 9 Figure 6 4 Analyzer Flow Chart Sheet 1 of 3 ...
Страница 184: ...SECTION 6 JLG CONTROL SYSTEM ADE 6 10 JLG Lift 3120746 Figure 6 5 Analyzer Flow Chart Sheet 2 of 3 ...
Страница 185: ...SECTION 6 JLG CONTROL SYSTEM ADE 3120746 JLG Lift 6 11 Figure 6 6 Analyzer Flow Chart Sheet 3 of 3 ...
Страница 224: ...SECTION 7 SCHEMATICS 7 2 JLG Lift 3120746 Figure 7 1 Electrical Components Installation Prior to S N 62137 Sheet 1 of 2 ...
Страница 225: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 3 Figure 7 2 Electrical Components Installation Prior to S N 62137 Sheet 2 of 2 ...
Страница 228: ...SECTION 7 SCHEMATICS 7 6 JLG Lift 3120746 Figure 7 5 Electrical Schematic Deutz Engine Sheet 1 of 2 ...
Страница 229: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 7 Figure 7 6 Electrical Schematic Deutz Engine Sheet 2 of 2 1870074 C ...
Страница 230: ...SECTION 7 SCHEMATICS 7 8 JLG Lift 3120746 Figure 7 7 Electrical Schematic Ford Dual Fuel Engine Sheet 1 of 2 ...
Страница 231: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 9 Figure 7 8 Electrical Schematic Ford Dual Fuel Engine Sheet 2 of 2 1870077 A ...
Страница 232: ...SECTION 7 SCHEMATICS 7 10 JLG Lift 3120746 Figure 7 9 Electrical Schematic Ford EFI Engine Sheet 1 of 2 ...
Страница 233: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 11 Figure 7 10 Electrical Schematic Ford EFI Engine Sheet 2 of 2 1870127 A ...
Страница 234: ...SECTION 7 SCHEMATICS 7 12 JLG Lift 3120746 Figure 7 11 Electrical Schematic ADE Machines Sheet 1 of 4 ...
Страница 235: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 13 Figure 7 12 Electrical Schematic ADE Machines Sheet 2 of 4 1870132 G ...
Страница 236: ...SECTION 7 SCHEMATICS 7 14 JLG Lift 3120746 Figure 7 13 Electrical Schematic ADE Machines Sheet 3 of 4 ...
Страница 237: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 15 Figure 7 14 Electrical Schematic ADE Machines Sheet 4 of 4 1870132 G ...
Страница 238: ...SECTION 7 SCHEMATICS 7 16 JLG Lift 3120746 Figure 7 15 Hydraulic Schematic Sheet 1 of 4 ...
Страница 239: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 17 Figure 7 16 Hydraulic Schematic Sheet 2 of 4 2792338 A ...
Страница 240: ...SECTION 7 SCHEMATICS 7 18 JLG Lift 3120746 Figure 7 17 Hydraulic Schematic Sheet 3 of 4 ...
Страница 241: ...SECTION 7 SCHEMATICS 3120746 JLG Lift 7 19 Figure 7 18 Hydraulic Schematic Sheet 4 of 4 2792338 A ...
Страница 242: ...SECTION 7 SCHEMATICS 7 20 JLG Lift 3120746 This page left blank intentionally ...
Страница 243: ......