SECTION 2 - GENERAL
3121259
– JLG Lift –
2-1
SECTION 2. GENERAL
2.1
MACHINE PREPARATION, INSPECTION, AND
MAINTENANCE
General
This section provides the necessary information needed by
those personnel that are responsible to place the machine in
operation readiness and maintain its safe operating condition.
For maximum service life and safe operation, ensure that all
the necessary inspections and maintenance have been com-
pleted before placing the machine into service.
Preparation, Inspection, and Maintenance
It is important to establish and conform to a comprehensive
inspection and preventive maintenance program. The follow-
ing table outlines the periodic machine inspections and main-
tenance recommended by JLG Industries, Inc. Consult your
national, regional, or local regulations for further requirements
for aerial work platforms. The frequency of inspections and
maintenance must be increased as environment, severity and
frequency of usage requires.
Pre-Start Inspection
It is the User’s or Operator’s primary responsibility to perform a
Pre-Start Inspection of the machine prior to use daily or at
each change of operator. Reference the Operation and Safety
Manual for completion procedures for the Pre-Start Inspec-
tion. The Operator and Safety Manual must be read in its
entirety and understood prior to performing the Pre-Start
Inspection.
Pre-Delivery Inspection and Frequent Inspection
The Pre-Delivery Inspection and Frequent Inspection shall be
performed by a qualified JLG equipment mechanic. JLG Indus-
tries, Inc. recognizes a qualified JLG equipment mechanic as a
person who, by possession of a recognized degree, certificate,
extensive knowledge, training, or experience, has successfully
demonstrated the ability and proficiency to service, repair, and
maintain the subject JLG product model.
The Pre-Delivery Inspection and Frequent Inspection proce-
dures are performed in the same manner, but at different
times. The Pre-Delivery Inspection shall be performed prior to
each sale, lease, or rental delivery. The Frequent Inspection
shall be accomplished for each machine in service for 3
months or 150 hours (whichever comes first); out of service for
a period of more than 3 months; or when purchased used. The
frequency of this inspection must be increased as environ-
ment, severity and frequency of usage requires.
Reference the JLG Pre-Delivery and Frequent Inspection Form
and the Inspection and Preventive Maintenance Schedule for
items requiring inspection during the performance of these
inspections. Reference the appropriate areas of this manual for
servicing and maintenance procedures.
Annual Machine Inspection
The Annual Machine Inspection must be performed by a Fac-
tory-Trained Service Technician on an annual basis, no later
than thirteen (13) months from the date of the prior Annual
Machine Inspection. JLG Industries, Inc. recognizes a Factory-
Trained Service Technician as a person who has successfully
completed the JLG Service Training School for the subject JLG
product model. Reference the machine Service and Mainte-
nance Manual and appropriate JLG inspection form for perfor-
mance of this inspection.
Reference the JLG Annual Machine Inspection Form and the
Inspection and Preventive Maintenance Schedule for items
requiring inspection during the performance of this inspec-
tion. Reference the appropriate areas of this manual for servic-
ing and maintenance procedures.
For the purpose of receiving safety-related bulletins, it is
important that JLG Industries, Inc. has updated ownership
information for each machine. When performing each Annual
Machine Inspection, notify JLG Industries, Inc. of the current
machine ownership.
Preventive Maintenance
In conjunction with the specified inspections, maintenance
shall be performed by a qualified JLG equipment mechanic.
JLG Industries, Inc. recognizes a qualified JLG equipment
mechanic as a person who, by possession of a recognized
degree, certificate, extensive knowledge, training, or experi-
ence, has successfully demonstrated the ability and profi-
ciency to service, repair, and maintain the subject JLG product
model.
Reference the Preventive Maintenance Schedule and the
appropriate areas of this manual for servicing and mainte-
nance procedures. The frequency of service and maintenance
must be increased as environment, severity and frequency of
usage requires.
Содержание 340AJ
Страница 1: ...Service and Maintenance Manual Model 340AJ P N 3121259 June 27 2017...
Страница 2: ......
Страница 10: ...vi JLG Lift 3121259 TABLE OF CONTENTS SECTION NO TITLE PAGE NO Thispageleftblankintentionally...
Страница 15: ...3121259 JLG Lift xi LIST OF FIGURES FIGURE NO TITLE PAGE NO Thispageleftblankintentionally...
Страница 18: ...xiv JLG Lift 3121259 LIST OF TABLES TABLE NO TITLE PAGE NO Thispageleftblankintentionally...
Страница 42: ...SECTION 2 GENERAL 2 12 JLG Lift 3121259 NOTES...
Страница 69: ...SECTION 3 CHASSIS TURNTABLE 3121259 JLG Lift 3 27 Figure 3 24 Bearing Pressing Tool...
Страница 71: ...SECTION 3 CHASSIS TURNTABLE 3121259 JLG Lift 3 29 Figure 3 27 Bearing Nut Wrench...
Страница 134: ...SECTION 3 CHASSIS TURNTABLE 3 92 JLG Lift 3121259 NOTES...
Страница 157: ...SECTION 4 BOOM PLATFORM 3121259 JLG Lift 4 23 Figure 4 8 Rotator Counterbalance Valve...
Страница 218: ...SECTION 5 HYDRAULICS 5 58 JLG Lift 3121259 Figure 5 32 Fasteners and Plugs Sheet 1 of 2...
Страница 219: ...SECTION 5 HYDRAULICS 3121259 JLG Lift 5 59 Figure 5 33 Fasteners and Plugs Sheet 2 of 2...
Страница 236: ...SECTION 5 HYDRAULICS 5 76 JLG Lift 3121259 Figure 5 39 Gear Pump Cutaway...
Страница 246: ...SECTION 5 HYDRAULICS 5 86 JLG Lift 3121259 Figure 5 40 Oil Sampling Port...
Страница 255: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 9 PLATFORM MODULE GROUND MODULE Figure 6 2 Control Module Location...
Страница 256: ...SECTION 6 JLG CONTROL SYSTEM 6 10 JLG Lift 3121259 Figure 6 3 Ground Module Sheet 1 of 4...
Страница 267: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 21 Figure 6 10 Analyzer Diagnostics Menu Sheet 1 of 4...
Страница 268: ...SECTION 6 JLG CONTROL SYSTEM 6 22 JLG Lift 3121259 Figure 6 11 Analyzer Diagnostics Menu Sheet 2 of 4...
Страница 269: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 23 Figure 6 12 Analyzer Diagnostics Menu Sheet 3 of 4...
Страница 270: ...SECTION 6 JLG CONTROL SYSTEM 6 24 JLG Lift 3121259 Figure 6 13 Analyzer Diagnostics Menu Sheet 4 of 4...
Страница 271: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 25 Figure 6 14 Analyzer Personalities Menu Sheet 1 of 2...
Страница 272: ...SECTION 6 JLG CONTROL SYSTEM 6 26 JLG Lift 3121259 Figure 6 15 Analyzer Personalities Menu Sheet 2 of 2...
Страница 273: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 27 Figure 6 16 Analyzer Machine Setup Menu...
Страница 274: ...SECTION 6 JLG CONTROL SYSTEM 6 28 JLG Lift 3121259 Figure 6 17 Analyzer Calibrations Menu...
Страница 289: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 43 14 Press ENTER If calibration is successful the screen will read...
Страница 336: ...SECTION 6 JLG CONTROL SYSTEM 6 90 JLG Lift 3121259 NOTES...
Страница 346: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 10 JLG Lift 3121259 Figure 7 13 Connector Installation...
Страница 365: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121259 JLG Lift 7 29 This page left blank intentionally...
Страница 368: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121259 NOTES...
Страница 369: ......