SECTION 5 - HYDRAULICS
5-68
– JLG Lift –
3121259
Control Neutral Adjustment
ADJUSTMENT OF THE EDC IS VERY SENSITIVE. BE SURE TO HOLD THE HEX
WRENCH STEADY WHILE LOOSENING THE LOCKNUT. TOTAL ADJUSTMENT IS
LESS THAN 120 DEGREES.
All functions of the Electric Displacement Control (EDC) are
preset at the factory. Adjust the pump to neutral with the
pump running on a test stand or on the vehicle/machine with
the prime mover operating. If adjustment fails to give satisfac-
tory results, you may need to replace the control or coils. Refer
to Control Solenoids in this section.
UNINTENDED MOVEMENT OF THE MACHINE OR MECHANISM MAY CAUSE
INJURY TO THE TECHNICIAN OR BYSTANDERS. TO PROTECT AGAINST UNIN-
TENDED MOVEMENT, SECURE THE MACHINE OR DISABLE/ DISCONNECT THE
MECHANISM WHILE SERVICING.
1.
Install a 50 bar [1000 psi] gauge in each of the two servo
gauge ports (M4and M5). Disconnect the external con-
trol input (electrical connections) from the control. Start
the prime mover and operate at normal speed.
2.
Use a 4mm internal hex wrench to hold the neutral
adjusting screw (D015) stationary while loosening the
locknut (D060) with a 13mm wrench.
3.
Observe pressure gauges. If necessary, turn adjusting
screw (D015) to reduce any pressure differential.
4.
Rotate the neutral adjusting screw (D015) clockwise
until the pressure increases on the gauge. Note the
angular position of the wrench. Then rotate the neutral
adjusting screw counter clockwise until the pressure
increases by an equal amount on the other gauge. Again
note the angular position of the wrench.
5.
Rotate the neutral adjusting screw clockwise half the
distance between the wrench positions noted above.
The gauges should read the same pressure, indicating
that the control is in its neutral position.
6.
Hold the neutral adjusting screw stationary and tighten
the lock nut (D060).Torque to 10 Nm [7 lb.ft.]. Do not
over torque the nut.
7.
When the neutral position is set, stop the prime mover,
remove the gauges, and install the gauge port plugs.
Reconnect the external control input.
NOTE:
A small pressure differential of 1.5 bar [22 psi] or less is
acceptable. Zero differential is usually not possible.
Figure 5-36. Neutral Adjustment (EDC) - Bot-
tom View
Содержание 340AJ
Страница 1: ...Service and Maintenance Manual Model 340AJ P N 3121259 June 27 2017...
Страница 2: ......
Страница 10: ...vi JLG Lift 3121259 TABLE OF CONTENTS SECTION NO TITLE PAGE NO Thispageleftblankintentionally...
Страница 15: ...3121259 JLG Lift xi LIST OF FIGURES FIGURE NO TITLE PAGE NO Thispageleftblankintentionally...
Страница 18: ...xiv JLG Lift 3121259 LIST OF TABLES TABLE NO TITLE PAGE NO Thispageleftblankintentionally...
Страница 42: ...SECTION 2 GENERAL 2 12 JLG Lift 3121259 NOTES...
Страница 69: ...SECTION 3 CHASSIS TURNTABLE 3121259 JLG Lift 3 27 Figure 3 24 Bearing Pressing Tool...
Страница 71: ...SECTION 3 CHASSIS TURNTABLE 3121259 JLG Lift 3 29 Figure 3 27 Bearing Nut Wrench...
Страница 134: ...SECTION 3 CHASSIS TURNTABLE 3 92 JLG Lift 3121259 NOTES...
Страница 157: ...SECTION 4 BOOM PLATFORM 3121259 JLG Lift 4 23 Figure 4 8 Rotator Counterbalance Valve...
Страница 218: ...SECTION 5 HYDRAULICS 5 58 JLG Lift 3121259 Figure 5 32 Fasteners and Plugs Sheet 1 of 2...
Страница 219: ...SECTION 5 HYDRAULICS 3121259 JLG Lift 5 59 Figure 5 33 Fasteners and Plugs Sheet 2 of 2...
Страница 236: ...SECTION 5 HYDRAULICS 5 76 JLG Lift 3121259 Figure 5 39 Gear Pump Cutaway...
Страница 246: ...SECTION 5 HYDRAULICS 5 86 JLG Lift 3121259 Figure 5 40 Oil Sampling Port...
Страница 255: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 9 PLATFORM MODULE GROUND MODULE Figure 6 2 Control Module Location...
Страница 256: ...SECTION 6 JLG CONTROL SYSTEM 6 10 JLG Lift 3121259 Figure 6 3 Ground Module Sheet 1 of 4...
Страница 267: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 21 Figure 6 10 Analyzer Diagnostics Menu Sheet 1 of 4...
Страница 268: ...SECTION 6 JLG CONTROL SYSTEM 6 22 JLG Lift 3121259 Figure 6 11 Analyzer Diagnostics Menu Sheet 2 of 4...
Страница 269: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 23 Figure 6 12 Analyzer Diagnostics Menu Sheet 3 of 4...
Страница 270: ...SECTION 6 JLG CONTROL SYSTEM 6 24 JLG Lift 3121259 Figure 6 13 Analyzer Diagnostics Menu Sheet 4 of 4...
Страница 271: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 25 Figure 6 14 Analyzer Personalities Menu Sheet 1 of 2...
Страница 272: ...SECTION 6 JLG CONTROL SYSTEM 6 26 JLG Lift 3121259 Figure 6 15 Analyzer Personalities Menu Sheet 2 of 2...
Страница 273: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 27 Figure 6 16 Analyzer Machine Setup Menu...
Страница 274: ...SECTION 6 JLG CONTROL SYSTEM 6 28 JLG Lift 3121259 Figure 6 17 Analyzer Calibrations Menu...
Страница 289: ...SECTION 6 JLG CONTROL SYSTEM 3121259 JLG Lift 6 43 14 Press ENTER If calibration is successful the screen will read...
Страница 336: ...SECTION 6 JLG CONTROL SYSTEM 6 90 JLG Lift 3121259 NOTES...
Страница 346: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 10 JLG Lift 3121259 Figure 7 13 Connector Installation...
Страница 365: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 3121259 JLG Lift 7 29 This page left blank intentionally...
Страница 368: ...SECTION 7 BASIC ELECTRICAL INFORMATION SCHEMATICS 7 32 JLG Lift 3121259 NOTES...
Страница 369: ......