SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION AND INSPECTION
2-4
– JLG Lift –
3121272
2.3
PRE-START INSPECTION
The Pre-Start Inspection should include each of the following:
1. Cleanliness –
Check all surfaces for leakage (oil or bat-
tery fluid) or foreign objects. Report this to the proper
maintenance personnel.
2. Structure -
Inspect the machine structure for dents,
damage, weld or parent metal cracks or other discrep-
ancies. Report this to the proper maintenance person-
nel.
3. Decals and Placards
– Check all for cleanliness and
legibility. Ensure none of the decals and placards are
missing. Ensure all illegible decals and placards are
cleaned or replaced. (See Section 5.8, DECAL INSTAL-
LATION)
4. Operation and Safety Manuals
- Ensure that a copy
of the Operation and Safety Manual, AEM Safety Man-
ual (ANSI markets only), and ANSI Manual of Responsi-
bilities (ANSI markets only) is enclosed in the weather
resistant storage container.
5. “Walk-Around” Inspection
–
Refer to Figure 2-1. on
6. Battery –
Charge as required.
7. Hydraulic Oil Level
-
Check the hydraulic oil level in
the pump reservoir, add as required.
8. Accessories/Attachments -
Reference the Operation
and Safety Manual of each attachment or accessory
installed upon the machine for specific inspection,
operation, and maintenance instructions.
9. Function Check
– Once the “Walk-Around” Inspection
is complete, perform a functional check of all systems
in an area free of overhead and ground level obstruc-
tions. Refer to Section 3 for more specific instructions
on the operation of each function.
.
Parent Metal Crack
Weld Crack