background image

SECTION 2 - 

SECTION 2 - GENERAL SERVICE INFORMATION

GENERAL SERVICE INFORMATION

2-4

2-4

 – JLG Lift –

 – JLG Lift –

3121228

3121228

Maintenance and Inspection Table Codes:

Maintenance and Inspection Table Codes:

1.

1. Che

Check for p

ck for prop

roper and se

er and secur

cure inst

e install

allati

ation.

on.

2.

2. Visua

Visual  ins

l  inspecti

pection  f

on  for  da

or  damage, 

mage, crack

cracks,  di

s,  distort

stortion, 

ion, or

or

excessive  wear.

excessive  wear.

3.

3. Che

Check 

ck for 

for pro

proper 

per adj

adjust

ustmen

ment.

t.

4.

4. Che

Check f

ck for c

or crac

racked 

ked or b

or brok

roken w

en weld

elds.

s.

5.

5. Op

Oper

erat

ates 

es pr

prop

oper

erly

ly..

6.

6. Return

Returns to n

s to neutra

eutral or "

l or "off" 

off" posi

position 

tion when r

when release

eleased.

d.

7.

7. Cl

Clea

ean an

n and fr

d free o

ee of de

f debr

bris

is..

8.

8. Int

Interl

erlock

ocks fu

s funct

nction 

ion pro

proper

perly

ly..

9.

9. Ch

Chec

eck fo

k for si

r sign

gns of l

s of lea

eaka

kage

ge..

10.

10. Dec

Decals 

als ins

instal

talled 

led and 

and leg

legib

ible.

le.

11.

11. Che

Check f

ck for 

or pro

proper 

per flu

fluid l

id leve

evel.

l.

12.

12. Che

Check fo

ck for chaf

r chafing a

ing and pr

nd prope

oper rou

r routin

ting.

g.

13.

13. Che

Check 

ck for 

for pro

proper 

per tol

tolera

erance

nces.

s.

14

14.. Pr

Prop

oper

erly l

ly lub

ubri

rica

cate

ted.

d.

15.

15. T

Torq

orqued to pr

ued to prope

oper spec

r specifi

ificat

cation

ion..

16.

16. No g

No gouges

ouges, exc

, excessiv

essive wear

e wear, or 

, or cords 

cords showin

showing.

g.

17.

17. Pro

Proper

perly inf

ly inflat

lated and se

ed and seate

ated arou

d around rim

nd rim..

18

18.. Pro

Proper an

per and aut

d author

horize

ized com

d compon

ponent

ents.

s.

19

19.. F

Ful

ully 

ly ch

char

arge

ged.

d.

20.

20. No l

No loose 

oose conn

connectio

ections, c

ns, corro

orrosion, 

sion, or ab

or abrasio

rasions.

ns.

2

21

1.. V

Ve

erriiffy

y..

2

22

2.. P

Per

erffo

orrm

m..

23

23.. Se

Seal

aled 

ed pr

prop

oper

erly

ly..

24.

24. Ove

Overri

rrides 

des Pla

Platfo

tform c

rm cont

ontrol

rols.

s.

25.

25. Inspe

Inspected 

cted per 

per Servi

Service a

ce and M

nd Mainte

aintenance 

nance Manua

Manual.

l.

Footnotes:

Footnotes:

(a) 

(a)  Prior to use each 

Prior to use each day; or at eac

day; or at each Operator change.

h Operator change.

(b) 

(b)  Prior to each sale, lease, 

Prior to each sale, lease, or delivery

or delivery..

(c) 

(c)  In service for 3 months; or Out o

In service for 3 months; or Out of service for 3 months

f service for 3 months

or 

or more; 

more; or 

or Purchased 

Purchased used.

used.

(d) 

(d)  Annually

Annually, no later than 13 months from the d

, no later than 13 months from the date of the

ate of the

prior 

prior inspection.

inspection.

GENERAL

GENERAL

O

Oppeerraattiioon  

n  

&  

&  

S

Saaffeetty  

y  

M

Maannuuaal  

l  

iin  

n  

S

Sttoorraagge  

e  

B

Booxx

2211

2211

2211

A

AN

NS

SI

 

I

 

&

 

&

 

EEM

MI

 

I

 

H

Haannddbbooookks

 

s

 

iin

 

n

 

S

Sttoorraagge

 

e

 

B

Booxx

2211

2211

2211

C

Caappaacciitty  

y  

D

Deeccaalls  

s  

IInnssttaalllleedd,  

,  

S

Seeccuurree,  

,  

LLeeggiibbllee

2211

2211

2211

A

Alll  

l  

D

Deeccaallss//P

Pllaaccaarrdds  

s  

IInnssttaalllleedd,  

,  

S

Seeccuurree,  

,  

LLeeggiibbllee

2211

2211

2211

""W

Waallkk--A

Arroouunndd"  

"  IInnssppeeccttiioon  

n  P

Peerrffoorrm

meedd

2222

A

Annnnuuaal

 

l

 

M

Maacchhiinne

 

e

 

IInnssppeeccttiioon

 

n

 

D

Duuee

2211

N

No  

o  

U

Unnaauutthhoorriizzeed  

d  

M

Mooddiiffiiccaattiioonns  

s  

oor  

r  

A

Addddiittiioonnss

2211

2211

A

Alll  

l  

R

Reelleevvaannt  

t  

S

Saaffeetty  

y  

P

Puubblliiccaattiioonns  

s  

IInnccoorrppoorraatteedd

2211

2211,  

,  

2222

G

Geenneerraal  

l  

S

Sttrruuccttuurraal  

l  

C

Coonnddiittiioon  

n  

aannd  

d  

W

Weellddss

22,  

,  

44

22,  

,  

44

A

Alll  

l  

FFaasstteenneerrss,  

,  

P

Piinnss,  

,  

S

Shhiieellddss,  

,  

aannd  

d  

C

Coovveerrss

11,  

,  

22

G

Grreeaasse  

e  

aannd  

d  

LLuubbrriiccaatte  

e  

tto  

o  

S

Sppeecciiffiiccaattiioonnss

2222

2222

FFuunnccttiioon

 

n

 

TTeesst

 

t

 

oof

 

f

 

A

Alll

 

l

 

S

Syysstteem

mss

2222

2222

P

Paaiinnt

 

t

 

aannd

 

d

 

A

Appppeeaarraannccee

77

77

N

Noottiiffy  

y  

JJLLG  

G  

oof  

f  

cchhaanngge  

e  

iin  

n  

M

Maacchhiinne  

e  

O

Ow

wnneerrsshhiipp

2222

**

Ch

Chan

ange o

ge onl

nly w

y whe

hen s

n serv

ervic

iced

ed, F

, Filill ha

l half f

lf ful

ull.l.

**

**

Rep

Replac

lace after s

e after syst

ystem brus

em brush wear i

h wear indi

ndicat

cator war

or warning i

ning is act

s activa

ivated

ted..

***

*** Drain 

Drain and ref

and refill wit

ill with fresh h

h fresh hydrau

ydraulic flu

lic fluid every t

id every two yea

wo years.

rs.

T

Table 2-2. 10MSP - Preventive Maintenance & Inspection Schedule. 

able 2-2. 10MSP - Preventive Maintenance & Inspection Schedule.  (Continued)

(Continued)

AREA ON MACHINE

AREA ON MACHINE

INTERVAL

INTERVAL

PRE-START (a)

PRE-START (a)

INSPECTION

INSPECTION

3 MONTH

3 MONTH

PREVENTATIVE

PREVENTATIVE

MAINTENANCE

MAINTENANCE

6 MONTH

6 MONTH

PREVENTATIVE

PREVENTATIVE

MAINTENANCE

MAINTENANCE

PRE-DELIVERY (b)

PRE-DELIVERY (b)

OR FREQUENT (c)

OR FREQUENT (c)

INSPECTION

INSPECTION

ANNUAL (d)

ANNUAL (d)

(YEARLY)

(YEARLY)

INSPECTION

INSPECTION

Содержание 10msp

Страница 1: ...Ser Service and Maintenance Ma vice and Maintenance Manual nual ANSI ANSI Model Model 10MSP 10MSP V Vertical Lift ertical Lift P N 3121228 P N 3121228 April 29 2 April 29 2013 013...

Страница 2: ...NOTES NOTES...

Страница 3: ...THE OWNER SAFETY IN THIS AREA IS THE RESPONSIBILITY OF THE OWNER OPERATOR OPERATOR B B HYD HYDRA RAULI ULIC S C SYST YSTEM EM SAF SAFETY ETY 1 1 It sh It should ould be p be particu articularly larly...

Страница 4: ...ue of Manual December 23 2005 Manual Revised January 2 2005 Manual Revised January 6 2005 Manual Revised May 23 2006 Manual Revised October 4 2006 Manual Revised December 5 2007 Manual Revised Septemb...

Страница 5: ...chine Overall 1 3 Platform Entry Height Floor to Platform Floor 1 3 Machine Ground Clearance 1 3 Machine Turning Radius Outside 1 3 1 4 TORQUE REQUIREMENTS 1 3 1 5 CYLINDER SPECIFICATIONS 1 3 1 6 SERI...

Страница 6: ...ation 3 4 3 4 DRIVE ELEVATION CUT OUT SWITCH INSTALLATION 3 5 3 5 WHEEL DRIVE ASSEMBLY SERVICING 3 5 Roll and Leak Testing 3 5 Oil Type and Capacity 3 5 Drive Motor Brush Wear Warning Indication 3 6 W...

Страница 7: ...3 Platform Control Console Installation 4 3 Platform Junction Box Install Remove 4 4 Junction Box to Ground Control Harness Remove Install 4 4 Platform Interlock Switch Circuit 4 5 4 3 GROUND CONTROL...

Страница 8: ...ALGORITHM PROGRAMMING OF THE DELTA Q BATTERY CHARGER TO OPTIMIZE BATTERY LIFE AND MACHINE CYCLE TIMES THE USE OF NON APPROVED BATTER IES IN YOUR JLG EQUIPMENT MAY RESULT IN PERFORMANCE ISSUES OR BATTE...

Страница 9: ...ice Classification GL 3 and sufficient chemical stabil ity for mobile hydraulic system service JLG Industries recommends Mobilfluid 424 hydraulic oil which has an SAE viscosity of 10W 30 and a viscosi...

Страница 10: ...er Section CL BrushorSpray Inspect lubricateifdryorrusting KeytoLubricants MPG MultipurposeGrease HO HydraulicOil ISO Vggrade32 46 GEAROIL GoodQualityWormGearOil SAE90 AGMA 5 EPCompounded CL ChainLube...

Страница 11: ...0 136 80 108 9 16 12 0 5625 0 1820 11600 110 149 80 108 120 163 98 133 18 0 5625 0 2030 12950 120 163 90 122 135 184 109 148 5 8 11 0 6250 0 2260 14400 150 203 110 149 165 224 135 183 18 0 6250 0 2560...

Страница 12: ...imate and or conditions and depend ing on the location and use of the machine ing on the location and use of the machine T Table 2 1 Ma able 2 1 Maintenance and Inspection intenance and Inspection Req...

Страница 13: ...eA As ss se em mb blly y 2 2 2 2 G Ge ea ar rB Bo ox xA As ss se em mb blly y D Dr ri iv ve eM Mo ot to or r B Br ru us sh he es s FUNCTIONS CONTROLS FUNCTIONS CONTROLS 7 7 P Plla at tf fo or rm mC Co...

Страница 14: ...d Purchased used used d d Annually Annually no later than 13 months from the d no later than 13 months from the date of the ate of the prior prior inspection inspection GENERAL GENERAL O Op pe er ra a...

Страница 15: ...nobstructed Cover all parts to keep them clean Be sure all parts are clean before they are installed New parts should remain in their containers until they are ready to be used Components Removal and...

Страница 16: ...ays inspect that segment of chain that operates over a sheave As the chain flexes over the sheaves joints and plate edges very gradually wear Chain stretch can be measured using a manufacturers wear s...

Страница 17: ...r protruding pins Keep chains lubricated Stress Corrosion Cracking The outside link plates which are heavily press fitted to the pins are particularly susceptible to stress corrosion cracking Like fat...

Страница 18: ...25 hour DRIVE count down the machine will only drive in creep turtle drive mode and platform lift up will be disabled At this point cycling power on off will only repeat the final 10 second mode cycl...

Страница 19: ...on Right Side Shown 1 Wheel Drive Assembly 2 Frame Mounting Surface 3 Mounting Bolts Washers a 4 Drive Wheel 5 Wheel Mounting Lugs b NOTE Installation same for left and right drive motor a Apply Locti...

Страница 20: ...the brake containment holes This will keep the brake housing in one piece 4 Cut the black wire tie not shown from the frame of the motor 5 Remove the 3 Brake Bolts 7 6 Remove the Brake Housing B1 and...

Страница 21: ...CH CLIPS WHICH ARE FASTENED TO THE BRUSH CARRIER ASSEMBLY WITH SCREWS ITEM 5 RAISE THE COVER STRAIGHT UP REMOVE THE SCREWS THEN HINGE THE COVER UP SEE CENTER ILLUSTRATION AND PRY THE CLIPS OFF OF THE...

Страница 22: ...iously with motor cover disassembly shown for reference only 1 3 4 Brush Assembly Remove Install 1 Brush Assembly a 2 Brush Carrier Socket 3 Brush Tab Slot 4 Brush Terminal Screw 5 Brush Attach Termin...

Страница 23: ...ubes shown shortened for illustrative purposes only Pump Remove Install Requires removal of tank assembly and pump pick up tube 1 Pump Assembly 3 Motor to Pump Coupler 2 Pump Assembly Screws 4 Pump Sh...

Страница 24: ...T MODIFY UNIT IN ANY WAY TO AFFECT STABIL ITY JLG MACHINES EQUIPPED WITH DELTA Q BATTERY CHARGERS ARE DESIGNED FOR THE BEST PERFORMANCE WITH OEM FAC TORY APPROVED BATTERIES APPROVED JLG REPLACEMENT BA...

Страница 25: ...to keep button from turning Reattach wires to same terminals on new switch Power Selector Switch Installation 1 Selector Knob 3 Power Selector Switch 2 Nut 4 Align and insert tab into cover Note Reatt...

Страница 26: ...Service and Maintenance Settings allow modi fication to machine personality settings such as lift speeds drive speeds as well as various switch polarity settings also enable various optional equipment...

Страница 27: ...e then move on to Selecting Programmable Item to Adjust Selecting Programmable Item to Adjust 1 Use the Platform UP DOWN buttons 1 to scroll through the list of programmable items available to your pr...

Страница 28: ...um mR Re ev ve er rs se eS Sp pe ee ed d P Plla at tf fo or rm mL Lo ow we er re ed d 2 20 0 1 1 1 10 00 0 2 2 M Ma ax xi im mu um mT Tu ur rn n S Sp pe ee ed d P Plla at tf fo or rm mL Lo ow we er r...

Страница 29: ...odule Module Drive Lift Mo Drive Lift Mode Selector de Selector Switch Switch Horn But Horn Button Swit ton Switch ch Rear Rear Cover Cover Wiring Harness Wiring Harness Connector So Connector Socket...

Страница 30: ...atformConsole CircuitBoardConnections PlatformConsole CircuitBoardConnections 1 1 Horn Switch C5 Horn Switch C5 2 2 Communications Cable to Communications Cable to Platform Junction Box Platform Junct...

Страница 31: ...oving from console PlatformConsole Drive LiftModeSelectSwitch 1 Switch Assembly a 2 Locking Tabs Note a Remove rear cover unplug switch wire press tabs to remove 1 2 1 2 PlatformConsole HornSwitchInst...

Страница 32: ...Switch Retainer Slots Note a Use a small straight blade screwdriver to extend the spring loaded retainer hooks 6 out and release the switch from the body 1 2 4 5 3 7 6 PlatformConsole JoystickInstalla...

Страница 33: ...N 5 MAST COMPONENTS 3121228 JLG Lift 5 1 SECTION 5 MAST COMPONENTS 5 1 MAST COMPONENTS OVERVIEW Figure 5 1 Mast Components 1 Material Handling Tray 2 Platform Assembly 3 Mast Assembly 4 Platform Mast...

Страница 34: ...ay Assembly 2 Tie Straps for Platform Console Harness 3 Countersunk Flat Head Socket Screws Washers and Locknuts 4 Hex Head Screws Wash ers and Locknuts a Platform shown without right side rails and p...

Страница 35: ...will need to temporarily uncap the extend and return hydraulic lines to allow mast section 2 to and return hydraulic lines to allow mast section 2 to be extended in the next step Capture any hydraulic...

Страница 36: ...oms o oms out ag ut against ainst the cylinder head the cylinder head 3 3 Comp Compress t ress the he he head ret ad retraini raining ri ng ring en ng enough ough to al to allow low the cylinder head...

Страница 37: ...aces is unacceptable In the event that an unacceptable condition occurs the piston should be unacceptable condition occurs the piston should be replaced replaced Tube Assembly Tube Assembly Visually i...

Страница 38: ...lation 1 Lift Down Valve a 2 Valve Solenoid b 3 Manual Release Assembly 4 O Ring with Backing Rings a 5 Valve O Ring a 6 Solenoid O Ring a Notes a Coat all o rings with clean hydraulic fluid before as...

Страница 39: ...hardware to the top of mast Always install slide pad shims with slide pads inserted into the slide pad channels ends of mast sections even Apply ing Krytox spray JLG P N 3020041 onto the slide pads a...

Страница 40: ...e sections together until ends are even 2 Insert slide pads into the slide pad channels at bot tom end of mast between section 1 and 2 one on each side of the mast with beveled surface facing out towa...

Страница 41: ...astening and shimming the slide pad on the top left side of the mast install a sequence cable bracket against the mast under the flatwasher 11 Thread slide pad attaching bolts two 2 1 4 20UNC x 3 8 lo...

Страница 42: ...the lower chain anchor bracket Loosely thread two 2 3 8 16UNC nuts onto the stud threads on each chain 7 Slide the anchor plate into the closed rail at the bot tom of mast section 4 and attach the an...

Страница 43: ...the mast See Section 5 5 Platform 7 FT HEIGHT Limit Switch OPTION 14 The mast assembly is now complete and ready to install onto the base frame TopofMast Section 4 Slide PadInstallation 1 Slide Pads 2...

Страница 44: ...Short Circuit 6 21 Code 12 Right Drive Motor Short Circuit 6 21 Code 13 Traction Module In Fold Back 6 21 Code 14 Pump Motor Disconnected 6 22 Code 15 Lift Down Valve Disconnected 6 22 Code 16 Lift Do...

Страница 45: ...4 MAIN POWER CIRCUIT TROUBLESHOOTING Machine Will Not Power Up 6 35 MAST TROUBLESHOOTING Platform Will Not Lower Manually 6 36 Platform Lift Up And Down Jerky 6 36 Mast Noisy When Lifting And Lowering...

Страница 46: ...Amperage Draw for Various Components COMPONENT AMPERAGE GroundControlModule 95Amps roomtemperaturewithratedload TractionControlModule LEVEL SURFACE 24V RATED LOAD 15 GRADE 24V RATED LOAD NO LOAD 24V 7...

Страница 47: ...is in the drive speed cut back target raised the proximity switch then cuts back the machine drive speed When machine is in the drive speed cut back mode a turtle is mode a turtle is displayed on the...

Страница 48: ...edinto anACoutlet anACoutlet G Go oT To oS St te ep p2 2 S Se ee e B Ba at tt te er ry y B Ba at tt te er ry y C Ch ha ar r ger Servicing ger Servicing Section3ofthisManual Section3ofthisManual 2 2 Is...

Страница 49: ...allevelofthe machines restingsurfacein machines restingsurfacein boththeXandtheY boththeXandtheY directions Doessurfacecheckwithin directions Doessurfacecheckwithin machinespecifi machinespecifi catio...

Страница 50: ...acrosspositive andnegative leadsinM2connec tor wiringharnessgoingtotheright drivemotor Isreadingwithin spec 1 to 3ohms Replace Traction Module GotoStep2 2 Repairorreplacerightdrivemotorwiring brusheso...

Страница 51: ...egative lug No Voltage Thiscircuitshould beisolated RepairorReplace Componentsas Required GotoStep2 2 Checkforcontinuityofboththepinstoground NoGround Replace Traction ControlModule Table 6 13 Code 12...

Страница 52: ...eacrossthepositive andnegative studsonthe pumpmotor SeeTable6 2 ReplaceGround ControlModule RepairorReplace PumpMotoror Motor Brushes Table 6 16 Code 15 Lift Down Valve Disconnected STEP ACTION SPEC Y...

Страница 53: ...7 PlugthecommunicationscableontheTractionControlModuletotheround socketontheoppositeendofthe module Doesthisfixproblem Done Replace GroundControl Module Table 6 35 Code 200 299 Platform Control Consol...

Страница 54: ...between eachpowerrecycle Doesfaultclear Done GotoStep2 2 IsacodenumberdisplayingontheGroundControlStation Code 316 GotoStep3 Replace TractionControl Module Code 325 GotoStep5 3 Confirmthatbothinstalle...

Страница 55: ...EP ACTION SPEC YES NO 1 Checkfor24VDCatthepositive andnegative mainpowercable connectionsontheGroundControlModule 24VDC GotoStep2 Replacethe175 AmpInlineFuseon the Positivepower cable 2 Checkcontinuit...

Страница 56: ...SECTION 6 TROUBLESHOOTING 3121228 JLG Lift 6 45 Figure 6 6 10MSP Overview of Electrical System Components...

Страница 57: ...SECTION 6 TROUBLESHOOTING 6 46 JLG Lift 3121228 Figure 6 7 Electrical Diagram 1870201_G Keyed Switch Removed for AustraliaSpec...

Страница 58: ...SECTION 6 TROUBLESHOOTING 3121228 JLG Lift 6 47 Figure 6 3 Electrical Diagram 1870201 G...

Страница 59: ...Figure 6 8 Hydraulic Diagram 2792684_A 1 Tank 5 Pressure Adjust Valve 9 Check Valve 2 Filter Screen 6 Extend Line 10 PressureCompensator FlowControlValve 3 Pump 7 Hydraulic Filter 11 Manual Decent Va...

Страница 60: ......

Страница 61: ...ce 33 0 5 53 88 31 70 33 0 5 53 88 31 79 JLG Deutschland GmbH Max Planck Str 21 D 27721 Ritterhude Ihlpohl Germany 49 0 421 69 350 20 49 0 421 69 350 45 JLG Equipment Services Ltd Rm 1107 Landmark Nor...

Отзывы: