The Checklist
Before Running the Turbine
•
Charge ECU Battery
•
Prepare fire extinguisher
•
Check fuel lines and filter. Make sure they are clean with no restrictions
•
Check that the fuel tank vent is unobstructed
•
Mix 5 % oil in fuel (i.e.: 1 quart per 5 gallons of kerosene)
•
Fill fuel tank(s). Make sure the main and header tanks are full
•
Be certain the starting gas release valve is closed, before filling the starting gas tank
•
Turn on receiver switch
•
Place the model with nose into the wind
•
Start
turbine
After Stopping the Turbine
•
Turn model into the wind. Stop turbine
•
After the cooling process (approximately two minutes), turn off receiver switch
•
After each flying session, open starting gas release valve, to empty the tank, before
storing the model. This should be executed in a safe area
10
Содержание SPH5
Страница 60: ...Copyright JetCat USA LLC 2001 2007 60 ...