8
7.0
Unpacking
Open shipping container, and any secondary
boxes. Check for shipping damage; report any
damage immediately to your distributor and
shipping agent. Do not discard any shipping
material until the Cold Saw is assembled and
running properly.
Compare the contents of your container with the
following parts list to make sure all parts are intact.
Missing parts, if any, should be reported to your
distributor. Read the instruction manual thoroughly
for assembly, maintenance and safety instructions.
7.1
Contents of shipping container
1 Cold
Saw
1 Operating
Lever
1 Work
Stop
Assembly
4
Hex Cap Screws with Nuts
1 Handle
1 Roller
Assembly
2 Splash
Plates
1
Coolant Tank w/ Pump (inside base)
1
Operating Instructions and Parts Manual (not
shown)
1
Product Registration Card (not shown)
Figure 7-1
8.0
Installation and assembly
Tools required for assembly (not provided):
6mm hex key (Allen wrench)
12mm and 19mm open-end wrenches
Remove all packing material from around the
machine. Remove screws holding the saw to the
skid. Lift the machine off the skid using straps
around the cast iron portions of the head (keep
straps away from blade, levers, etc.).
The location should have sufficient lighting to
prevent shadows around the work area. Leave
enough room on all sides of the machine for
movement of stock and for general maintenance
work.
The base of the machine must be anchored to the
floor by two lag bolts or studs properly anchored
into concrete.
After positioning the machine, remove any cords
that were used to secure the head in lowered
position during shipping.
Exposed metal surfaces have been coated with a
rust-protectant from the factory. Remove this using
a soft cloth dampened with a cleaner/degreaser.
Do not use gasoline, paint thinner, acetone, or
other highly flammable substances, and avoid
using an abrasive pad as it may scratch metal
surfaces.
Содержание CS-275
Страница 19: ...19 16 1 1 CS 275 Cold Saw Machine Assembly Exploded View...
Страница 23: ...23 16 2 1 CS 315 Cold Saw Machine Assembly Exploded View...
Страница 28: ...28 17 0 Electrical connections 17 1 Models CS 275 and CS 315 3 Phase 3 Phase Only...
Страница 29: ...29 17 2 Model CS 275 1 Phase Single Phase 115 230V...
Страница 30: ...30 17 3 Model CS 315 1 Phase Single Phase 230V...
Страница 31: ...31 This page intentionally left blank...
Страница 32: ...32 427 New Sanford Road LaVergne TN 37086 Phone 800 274 6848 www jettools com...