background image

JT-90 48V 

On a 24V board circuit 

Strips factory mounted

Parallel switch

Bottom side  

Parallel switch

Top side  

2a

2b

1b

1a

Controller

Service batteries

Start battery

Charger 24V

Alternator

Dc-Dc converter

24-12 20A

Fuse

Main switch

Contactor 

Battery isolator

Do not extend this 

power cable

Содержание D-010-07

Страница 1: ...This is a short manual for a Jet Thruster installation For more detailed information see installation manual D 010 07 Keep this manual and the D010 07 always on board QUICK START D 105 00...

Страница 2: ......

Страница 3: ...0 2 0 2 0 03 0 03 UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN MILLIMETERS ANGLES IN DEGREES TOLERANCES 0 2mm 0 5 BREAK ALL EDGES Ra 3 2 Weight in kg Material Size Customer Part No Note Reference Do N...

Страница 4: ...preparation Determine pump position nozzle position hose routing throughout the ves sel Clean all stainless steel composite parts thoroughly with acetone or Brake cleaner Make sure all grease is remov...

Страница 5: ...o be 90 to Center line of boat Nozzle s position 7 10 cm below waterline Parallel to waterline Batteries directly next to pump Most Critical steps to meet See all other steps and meet them as well Pum...

Страница 6: ...of battery 1 with negative of service battery Common ground Use proper battery pole clamps Use proper and good fitting terminals Install battery pole caps 3 Nozzle position Nozzles as far forward or...

Страница 7: ...7 CM 15 20 cm 90 90 7 cm 7 CM 15 20 cm 90 90 7 cm 7 CM 15 20 cm 90 90 7 cm Step 1 Step 2 Step 3...

Страница 8: ...ront the threaded parts with the wet wipes This will cause the sealant not to bond and will cause leakage 5 Water inlet and acces to shut off valve Ball valve must be easily accessible Inlet hose max...

Страница 9: ...Hose max 60 C 90 90 Step 4 Step 5 Step 6...

Страница 10: ...rs 8 Control panel in helm station Use drilling template for installing control panel Glue front plate panel onto dashboard with flexible marine sealant 9 Controller Preferably install controller near...

Страница 11: ...C 85 85 23 70 85 85 23 70 Jet Thruster controller Controls Pump unit Valve bow Valve Stern 12V Jet Thruster controller Controls Pump unit Valve bow Valve Stern 12V 25 C Slang max 60 C 125 C 85 85 23 7...

Страница 12: ...I 115 58 I 330 00 I 316 00 I 321 00 V 100 58 P 115 58 I 302 00 I 307 00 I 308 00 I 105 00 I 113 58 I 310 00 I 331 00 I 312 00 JT 30 50 JT 50 50 JT 50 example setup...

Страница 13: ...I 267 00 I 268 01 I 269 GF I 271 00 I 213 00 CP 050 00 V 200 50 I 275 01 I 330 00 I 215 00 I 321 00 I 270 01 I 331 00 P 259 00 JT 70 50 JT 90 50 JT 90 example setup...

Страница 14: ...JT 30 12V Charged 12V Contactor Main switch Fuse Optima battery Controller Service batteries Start battery Charger 12V Alternator Battery isolator Do not extend this power cable...

Страница 15: ...harged 12V Step up charger Contactor Main switch Fuse Optima batteries Controller Service batteries Start battery Charger 12V Alternator Mac plus 12 24V DC charger Battery isolator Do not extend this...

Страница 16: ...switch Strips factory mounted Parallel switch Bottom side Parallel switch Top side Contactor Main switch Fuse Controller Service batteries Start battery Battery isolator Charger 12V Alternator Optima...

Страница 17: ...24V On a 24V board circuit Main switch Fuse Contactor 2a 2b 1b 1a Controller Dc Dc converter 24 12 20A Service batteries Start battery Charger 24V Alternator Battery isolator Do not extend this power...

Страница 18: ...12V Step up charger Controller Service batteries Start battery Charger 12V Alternator Mac plus 12 24V DC charger Contactor Main switch 2a 2b 1b 1a Fuse Optima batteries Battery isolator Do not extend...

Страница 19: ...h Contactor Main switch Strips factory mounted Controller Service batteries Start battery Charger 12V Alternator Parallel switch Bottom side Parallel switch Top side 2a 2b 1b 1a Fuse Optima batteries...

Страница 20: ...ory mounted Parallel switch Bottom side Parallel switch Top side 2a 2b 1b 1a Controller Service batteries Start battery Charger 24V Alternator Dc Dc converter 24 12 20A Fuse Main switch Contactor Batt...

Страница 21: ...witch 2a 2b 1b 1a Service batteries Start battery Charger 12V Alternator Fuse Main switch Contactor Controller Parallel switch Bottom side Parallel switch Top side Strips factory mounted Mac plus 12 2...

Страница 22: ...nd check wiring diagram Red Light Flashing Valve is not open in me restart system Check micro switches for water damage Open valve to clean inside 12V 12V E 301 00 Controller to joystick cable 10mtr 3...

Отзывы: