![JDS Uniphase T-BERD 6000A Скачать руководство пользователя страница 21](http://html2.mh-extra.com/html/jds-uniphase/t-berd-6000a/t-berd-6000a_testing-manual_3587519021.webp)
Page 21 of 28
Technical Support
1 866 228-3762
Systems Engineer
321-243-0600
3.
RFC-6349 Test Procedures
The following procedures describe how to measure Layer 4 TCP throughput with the T-BERD 6000A
in accordance with the RFC-6349 benchmarking methodology. The RFC-2544 procedure outlined in
Section 2 should be completed prior to RFC-6349 testing.
Test procedures are described for:
Electrical and Optical handoffs
10Mbps, 100Mbps, and 1Gbps links
Technicians should follow procedure in one of the following sections, depending on his location (A
side or Z side). The RFC-6349 test is run from the A-Side. The Z-side is configured as a TCP Server.
Meter
A-Side
Z-Side
T-BERD 6000A
Section 3.1
Section 3.2