4 - 2
Pressure Measurement
Measurement
Part Name
bar (lb/in
2
)
Method
Port
Main Relief
Standard: 314 - 320 bar (4554 - 4641 lb/in
2
)
Dipper Relief
G1(G2)
Power Boost: 343 - 350 bar (4975 - 5076 lb/in
2
)
Boom Port Relief
Raise
358 - 365 bar (5192 - 5294 lb/in
2
)
Boom Up Relief
G2
Lower
295 - 305 bar (4278 - 4423 lb/in
2
)
Boom down Relief
G2
Bucket Port Relief
Open/Close
358 - 365 bar (5192 - 5294 lb/in
2
)
Bucket Relief
G2
Dipper Port Relief
Out/In
358 - 365 bar (5192 - 5294 lb/in
2
)
Dipper Relief
G1
Swing Port Relief
Left/Right
275 - 285 bar (3988 - 4133 lb/in
2
)
Swing Relief
G1
Pilot Relief
37 - 43 bar (536 - 624 lb/in
2
)
Lever Neutral
G3
Accumulator
15 ± 5 bar (217 ± 72.5 lb/in
2
)
G3
Track Motor Relief
338 - 348 bar (4902 - 5047 lb/in
2
)
G1(G2)
Section E
Hydraulics
9803/6410
Section E
4 - 2
Issue 1
Pressure Testing
Pressure Testing - General
Confirmation of the oil Temperature
Confirm the oil temperature is between 45° - 55° C using the
self check function. If the temperature is low use the following
warm-up procedure.
Warming-up Procedure
1
Turn the Throttle Control to mid-range and make sure the
Work Mode Selection Switch is set to S.
2
Press the One Touch Idle Switch.
3
Run the engine until the Coolant Temperature gauge
reads within the normal (green) range.
4
Set the Servo Isolator Switch to ON to enable the
hydraulic servo controls to be operated.
5
Operate the bucket control slowly until it reaches one end
of its travel and leave it there for 30 seconds.
6
Operate the bucket control slowly to the other end of its
travel and leave it there for 30 seconds.
7
Repeat steps 5 and 6 for 10 minutes to warm up the
hydraulic circuit.
8
Now operate the excavating controls three to five times in
each direction to distribute warm hydraulic oil around the
system.
Содержание JS130
Страница 39: ...3 3 Section 3 Routine Maintenance 9803 6410 Section 3 3 3 Issue 1 Greasing continued Excavator End...
Страница 65: ...Section 3 Section 3 9803 6410 Issue 1 9 1 9 1 Routine Maintenance Component Location Diagram...
Страница 118: ......
Страница 119: ...3 1 Section C Electrics 9803 6410 Section C 3 1 Issue 1 Layout Operator s Cab...
Страница 142: ...5 3 Section C Electrics 9803 6410 Section C 5 3 Issue 1 Pump Control FLOW CHART...
Страница 145: ...5 6 Section C Electrics 9803 6410 Section C 5 6 Issue 1 Pump Control Cushioned Boom Starting continued Flow Chart...
Страница 148: ...5 9 Section C Electrics 9803 6410 Section C 5 9 Issue 1 Pump Control Pressure Increasing System continued Flow Chart...
Страница 155: ...5 16 Section C Electrics 9803 6410 Section C 5 16 Issue 1 Pump Control Power Supply Cut Delay Flow Chart...
Страница 159: ...5 20 Section C Electrics 9803 6410 Section C 5 20 Issue 1 Pump Control Swing brake Swing lock continued Flow Chart...
Страница 160: ...5 21 Section C Electrics 9803 6410 Section C 5 21 Issue 1 Pump Control Lever Lock Circuit Diagram Time Chart...
Страница 161: ...5 22 Section C Electrics 9803 6410 Section C 5 22 Issue 1 Pump Control Lever Lock continued Flow Chart...
Страница 207: ......
Страница 209: ......
Страница 210: ...3 4 Section E Hydraulics 9803 6410 Section E 3 4 Issue 2 Schematics Shuttle Block...
Страница 211: ...Section E Section E Hydraulics 9803 6410 Issue 2 3 5 3 5 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 212: ...Section E Section E Hydraulics 9803 6410 Issue 1 3 6 3 6 Schematics Pilot Control Line Hose Connection Diagram JS03540...
Страница 234: ...14 1 Section E Hydraulics 9803 6410 Section E 14 1 Issue 1 JS00010 Hydraulic Pump Regulator Dismantling and Assembly...
Страница 278: ...32 2 Hydraulic Circuit Diagram Section E Hydraulics 9803 6410 Section E 32 2 Issue 1 Control Valve JS01700...
Страница 279: ...33 1 Neutral Circuit Section E Hydraulics 9803 6410 Section E 33 1 Issue 1 Control Valve JS01610...
Страница 284: ...33 6 Boom Raise BM Operation Section E Hydraulics 9803 6410 Section E 33 6 Issue 1 Control Valve L...
Страница 287: ...33 9 Slew Operation SW Priority Circuit Section E Hydraulics 9803 6410 Section E 33 9 Issue 1 Control Valve JS01770...
Страница 293: ...Hydraulics 9803 6410 Issue 1 34 3 34 3 Section E Section E Control Valve JS01820 Dismantling and Assembly cont d...
Страница 532: ...Contents Page No Technical Data 1 1 i Engine 9803 6410 i Issue 1 Section K Section K...