
Operation
Starting the Engine
105
105
9811/9950-1
Warming Up
P11-2032
Before starting work in temperatures below -15°C (5°F),
hydraulic fluid must be warmed.
1
Warm up the engine:
After starting the engine set the throttle lever to mid
position and run for 10 minutes.
Note: Do not operate any services. After the warm up
period make sure that everyone is clear of the machine.
2
Warm up the hydraulic oil:
a
Increase engine speed to maximum. Warm the
hydraulic oil by repeatedly selecting bucket crowd
by moving the right hand lever to the left for 5
seconds. Repeat for several minutes.
b
Select dozer up by moving dozer control lever
backwards, keep selected for one minute.
3
Warm up hydraulic circuit:
a
Reduce engine speed by moving throttle lever to
mid position.
b
Raise and lower boom from ground level to full
height five times.
c
Stroke the dipper fully in both directions, five
times.
d
Rotate the bucket fully in both directions, five
times.
e
Slew the upper structure clockwise for one
revolution and stop. Slew the upper structure
anticlockwise for one revolution and stop.
f
Repeat 3c three times.
4
The machine should now operate correctly. Should
operation still appear slow, then steps 3b and 3c may
be repeated.
HE Services
Содержание 8026 CTS
Страница 2: ...0 0 9811 9950 Notes E S e r v i c e s...
Страница 23: ...Introduction Machine Description 5 5 9811 9950 1 C031400 B1 Fig 2 ZTS 8 0 3 0 1 3 2 4 7 6 5 8 E S e r v i c e s...
Страница 62: ...Introduction Machine Security 44 44 9811 9950 1 Page left intentionally blank E S e r v i c e s...
Страница 68: ...Operation Entering and Leaving the Cab 50 50 9811 9950 1 Fig 8 B A E S e r v i c e s...
Страница 71: ...Operation Doors and Windows 53 53 9811 9950 1 C035100 Fig 11 E S e r v i c e s...
Страница 99: ...Operation Operating Levers Pedals 81 81 9811 9950 1 Page left intentionally blank E S e r v i c e s...
Страница 101: ...Operation Operating Levers Pedals 83 83 9811 9950 1 C035010 3 Fig 34 SAE h 1 A B E S e r v i c e s...
Страница 103: ...Operation Operating Levers Pedals 85 85 9811 9950 1 731911 Fig 36 F E S e r v i c e s...
Страница 105: ...Operation Operating Levers Pedals 87 87 9811 9950 1 731911 Fig 38 F E S e r v i c e s...
Страница 107: ...Operation Operating Levers Pedals 89 89 9811 9950 1 796300 B3 Fig 40 A B A B D E S e r v i c e s...
Страница 109: ...Operation Operating Levers Pedals 91 91 9811 9950 1 C019940 2 Fig 41 C B A A B E S e r v i c e s...
Страница 111: ...Operation Operating Levers Pedals 93 93 9811 9950 1 796300 B4 Fig 43 A B D E S e r v i c e s...
Страница 132: ...Operation Preparing the Machine for Travel 114 114 9811 9950 1 732010 7 Fig 54 150mm 6in E S e r v i c e s...
Страница 141: ...Operation Working with the Machine 123 123 9811 9950 1 731990 2 Fig 55 1 2 3 E S e r v i c e s...
Страница 169: ...Operation Transporting the Machine 151 151 9811 9950 1 800950 3 Fig 67 X B C B C A D C E S e r v i c e s...
Страница 171: ...Operation Transporting the Machine 153 153 9811 9950 1 800990 4 Fig 68 E S e r v i c e s...
Страница 223: ...Routine Maintenance Greasing 205 205 9811 9950 1 Fig 72 ZTS 8 0 4 0 B A A B C C C D D E E F F H H G E S e r v i c e s...
Страница 257: ...Routine Maintenance Fuel System 239 239 9811 9950 1 T015790 2 Fig 93 A E S e r v i c e s...
Страница 266: ...Routine Maintenance Tracks and Running Gear 248 248 9811 9950 1 Fig 98 E S e r v i c e s...
Страница 298: ...Optional Attachments Quickhitch Rockbreaker 280 280 9811 9950 1 Fig 112 H F J K Z V Y E S e r v i c e s...
Страница 302: ...Optional Attachments Quickhitch Rockbreaker 284 284 9811 9950 1 Page left intentionally blank E S e r v i c e s...
Страница 307: ...Specifications Static Dimensions 289 289 9811 9950 1 Static Dimensions Fig 120 B E D F C A E S e r v i c e s...
Страница 320: ...Specifications Vibration 302 302 9811 9950 1 Page left intentionally blank E S e r v i c e s...