background image

Jasco J-810 CD – Quick ON/OFF Guide  

Turning ON the system: 

1.

 

Open  the  nitrogen  valve 

(the  black  handle  has  to  be  aligned  with  the  copper  pipe  –  turn  it 

slowly in order to have a steady increase of pressure in the system)

  

2.

 

Purge the system for at least 10 min 

(40 min if it hasn’t been used in over 2 days); 

 

steps 3 & 4 can be done while waiting.

 

3.

 

Turn  on  the  water  bath  and  the  temperature  controller;  press  start  on  the  temperature 

controller front panel 

4.

 

Switch on the spectrometer 

(once the system is initialised the shutter LED will light up)

 

5.

 

Double  click  on

  Spectra  Manager

,  select  the  type  of  experiment  you  want  to  do.  A  new 

window opens asking you to wait until the system is fully purged (this takes 10 min),

 

6.

 

A self-diagnosis will be performed and the Xe lamp should automatically turn ON. The lamp 

indicator turns green. 

 

7.

 

The lamp will require at least 10 min to stabilize after ignition 

Note:

 If it is necessary to restart the lamp after running, it must be allowed to cool for about 15 

mins  before  re-ignition  is  attempted. 

Do  not  switch  off  the  lamp  if  there  are  less  than  8 

hours between you and the next user. Contact the next user via e-mail.

 

Отзывы: