background image

LT_MO8

Example for fabricating permanent 

installation for re-location of gas 

main through insertion tee.

Alternate configuration for vertical insertion of rod: 

Insertion Tee with 45º Elbow

(16-HVTTR required for tapping this configuration)

800.346.1956

WWW.JAMESONLLC.COM

 

 

FUSION TIME

COOLING TIME

TOTAL                          

COOLING TIME

Minimum 

KVA

Minimum 

Generator 

Breaker

Seconds

Minutes

Minutes

 

 

 

 

In clamp position * and 

prior to movement

Prior to pressure taps 

and backfilling

1” CTS Coupling *

45 

10

20

1.0 

10

1” IPS Coupling*

50 

10

20

1.0 

10

2” Insertion Tee

90

10

25

1.0

10

* Clamping required on couplings

Warranty

Jameson products carry a warranty against any defect in material and workmanship for a period of one year from date of shipment 

unless failure is due to misuse or improper application. 
Jameson shall in no event be responsible or liable for modifications, alterations, misapplications or repairs made to its products by 

purchaser or others. 
This warranty is limited to repair or replacement of the product and does not include reimbursement for shipping or other expenses 

incurred. Jameson disclaims any other express or implied warranty.

Содержание 16-14-600-GL

Страница 1: ...e regarding the use of its gas line tracer products Jameson LLC cannot be responsible for any use of its products that does not comply with these instructions However you are also cautioned to comply...

Страница 2: ...equip ment Failure to follow instructions could result in an accident causing serious injury Do not allow chil dren or untrained personnel to use this equipment Follow your company installation proced...

Страница 3: ...ed operating personnel only This publication was written to assist in the training of personnel in the appropriate procedures and operating tech niques for joining polyethylene pipe with the Jameson I...

Страница 4: ...apter Advance cutter with tapping tool until the stop is engaged completing hot tap Back out cutter with tapping tool and seal against top of tapping tee body This ensures cutter does not restrict flo...

Страница 5: ...procedures provided with your equipment and those established by your company Install Rod into Stuffing Box 2 Remove cap of Stuffing Box by removing the 3 screws 3 INSPECT O RING If it shows any sign...

Страница 6: ...below 45kHz Follow proper locating practices established by your company or your locating equipment manufacturer Removing the Rod 18 When tracing is complete pull rod back through Tap Tee and reinsta...

Страница 7: ...led rod Any resistance reading generally between 2 12 ohms indicates proper continuity 6 Remove end ferrule Clean rod end and end ferrule with cleaning solvent or alcohol to remove debris and glass fi...

Страница 8: ...oupling 45 10 20 1 0 10 1 IPS Coupling 50 10 20 1 0 10 2 Insertion Tee 90 10 25 1 0 10 Clamping required on couplings Warranty Jameson products carry a warranty against any defect in material and work...

Отзывы: