J-200 Series
16.4 Export 50Hz J-210 & J-220 Models
This wiring diagram is used for all J-210 & J-220 230V 50Hz Export spa
models.
Standard 3-Wire 230 VAC Connection (50 Hz, 1 Phase Service)
Use copper conductors ONLY. Wire size must be appropriate per NEC and/or
local codes.
BLK
BLK
BLU
BLU
BLU
BLU
BLU
BLU
BRN
BRN
BRN
BRN
BRN
BRN
BRN
Heater
2.7kW @ 230 VAC
Pressure Switch
Hi-limit/Freeze Sensor
Temperature Sensor
J2
J3
Spa Light
Transformer
230 VAC
J1 Logic Jumper Settings
JP1 1-2 ON = 20A Logic (Factory Setting)
JP1 1-2 OFF = 30A Logic
JP1 7-8 ON = °C Temperature Display (Factory Setting)
JP1 7-8 OFF = °F Temperature Display
J20
J21
J12
J14
J16
J11
J15
J13
J17
J7
J8
J9
J10
J5
J6
Heater IN
Heater OUT
F1*
K5
K7
K8
J1
Control
Panel
THERM
SWITCH
7
5
3
1
8
6
4
2
Optional
Ozonator
O3
F1
20A
250V
SC-20
GRN
TB1
BLU
BRN
1
2
GROUND
Main Pump
HI
LO
Hard
Wire
Only
41
Содержание J - 230
Страница 1: ...owner s manual J 2 0 0 S e r i e s J 280 J 270 J 230 J 220 J 210 2530 277T Rev A...
Страница 55: ......