J-200
8. Select the power supply inlet you want to use (Figure A). Feed power
cable to control box, then install it through the large opening provided
in the bottom side of the box.
9. Connect wires, color to color, on terminal blocks TB1 and TB3
(Figure C, page 18). TIGHTEN SECURELY! All wires must be
hooked up securely or damage could result.
10. Install control box door and screws and reinstall the cabinet side
panels.
Figure B - Control Box
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
TB1
3
2
1
7
8
3
6
2
2
Figure A
Equipment Area
1. Control Box
2. Power Supply Inlet(s)
3. 2-Speed Pump #1
4. Heater
5. Pump Drain Plug
Flow
Note: Pump Locations Vary by Model
5
5
1
4
6. 1-Speed Pump #2
7. Optional CD Ozonator (Purchased Separately)
8. Ozone Injector
9. Control Panel
9
17
Содержание J - 200 J - 230
Страница 1: ...owner s manual J 2 00 Co llection J 280 J 270 J 230 J 210 2530 277W Rev B ...
Страница 64: ......