background image

Support: 855-473-7449 or 408-943-4100                                     Email: [email protected]

Page 4

3.4 Mount the Unit in the Rack

Caution: Two people are required to safely lift the chassis for rack installation or removal.

 Do not install 

drives until after the chassis has been installed in the rack, and remove all drives before removing the chassis 

from the rack�

Extend both inner rails outwards from the rack until they lock in place�  Align the cabinet rails with the inner 

rack rails and slide them into the rack rails until they are fully seated�

When both cabinet rails are secured in the rack rails, gently push the chassis until it stops halfway in� Slide the 

blue release tabs on both cabinet rails towards the front of the system (1) while pushing the unit into the rack� 

Push the chassis into the rack until it is flush with the front of the rack (2).

Anchor the unit in the rack on both sides with long M5 screws�

Содержание TrueNAS ES24

Страница 1: ...TrueNAS ES24 Expansion Shelf Basic Setup Guide Version 1 9...

Страница 2: ...nts 1 Unpacking the Unit 1 2 Become Familiar with the ES24 System 2 3 ES24 Rail Kit Assembly 3 3 1 Separate Cabinet Rails from Rack Rails 3 3 2 Mount Cabinet Rails 3 3 3 Mount the Rack Rails 3 3 4 Mou...

Страница 3: ...tain proper air ow for cooling Two 3 meter Mini SAS HD to Mini SAS HD cables One Serial Cable Accessory kit with 2 IEC C13 to NEMA 5 15P power cords 2 IEC C13 to C14 cords and a set of velcro cable ti...

Страница 4: ...for power 1 locate ID 3 and fault 4 The fault light illuminates during the initial power on self test POST or when the TrueNAS software generates an alert On the back panel is the serial number 1 two...

Страница 5: ...net rail on the other side A TrueNAS ES24 requires 4U of vertical rack space The rack rails are installed in the bottom 2U of the total 4U height The inner rack rail must be unlocked and retracted bef...

Страница 6: ...both inner rails outwards from the rack until they lock in place Align the cabinet rails with the inner rack rails and slide them into the rack rails until they are fully seated When both cabinet rai...

Страница 7: ...lue when the drive is active or a hot spare The lower light is solid red if a fault has occurred Press the silver button on the drive tray to open the latch Carefully slide the tray into a drive bay u...

Страница 8: ...5 Connect Power Cords Do not plug the power cords into a power outlet yet Connect a power cord to the back of one power sup ply Place the cord in the plastic clamp and press the tab into the latch to...

Страница 9: ...into power outlets Wait two minutes for the drives to start If the TrueNAS system is on it can remain on while the expansion shelf is connected The ES24 is compatible with several TrueNAS systems Typ...

Страница 10: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 8 6 2 M50...

Страница 11: ...s com docs 8 Contacting iXsystems For assistance please contact iX Support Contact Method Contact Options Web https support ixsystems com Email support iXsystems com Telephone Monday Friday 6 00AM to...

Страница 12: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 10...

Отзывы: