
CAUTION: Installing the device in a rack requires two people. One person should position the
device in the rack, while the other secures it by using the rack screws.
ATTENTION: L’installation de l’appareil dans un rack nécessite deux personnes. Une
personne doit positionner l’appareil dans le rack, tandis que l’autre le fixe à l’aide des vis du
rack.
Ground the chassis
To ground the chassis, do the following:
1. Ensure that the rack on which the system is to be mounted is properly grounded and in compliance
with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on
the rack (no paint or isolating surface treatment).
2. Attach a lug (not provided) to a #18 AWG minimum grounding wire (not provided), and connect it to
the grounding point on the system rear panel. Next, connect the other end of the wire to rack
ground.
The following image illustrates the steps:
CAUTION: The chassis ground connection must not be removed unless all supply
connections have been disconnected.
ATTENTION: Le raccordement à la terre ne doit pas être retiré sauf si toutes les connexions
Chapter 4 How do I...
– 11 –
913-2626-01
Содержание UHD100T32
Страница 1: ...UHD100T32 Release 1 3 Getting Started Guide 913 2626 01 Document version 202104170944 05 30...
Страница 3: ...This page intentionally left blank 913 2626 01 iii...
Страница 9: ...This page intentionally left blank 913 2626 01 ix...
Страница 11: ...This page intentionally left blank 913 2626 01 xi...
Страница 23: ...This page intentionally left blank 913 2626 01 8...
Страница 87: ...This page intentionally left blank 913 2626 01 72...
Страница 90: ...W workflow 7 INDEX 75 913 2626 01...
Страница 91: ...Ixia a Keysight Business 1400 Fountaingrove Parkway Santa Rosa CA 95403 1738 Keysight Technologies 2018 2021...