REL1.3
Page 77 of 80
RZ/G1M/G1N Qseven SOM Hardware User Guide
iWave Systems Technologies Pvt. Ltd.
3.3.2
Guidelines to insert the Qseven SOM into Carrier board
•
Make sure that the carrier board is completely powered off.
•
Insert the Qseven module in to the MXM connector at an angle of 30° as shown below in the first photo.
•
Check the Notch position of Qseven module is proper while inserting.
•
Once the Qseven module is inserted to the MXM connector properly, press the board vertically down as shown
below (in the second photo), such that the board is fixed firmly into the expansion connectors.
Figure 16: Qseven Module Insertion procedure
Содержание iW-RainboW-G20M
Страница 66: ...REL1 3 Page 66 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 67: ...REL1 3 Page 67 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 68: ...REL1 3 Page 68 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 69: ...REL1 3 Page 69 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...
Страница 80: ...REL1 3 Page 80 of 80 RZ G1M G1N Qseven SOM Hardware User Guide iWave Systems Technologies Pvt Ltd...