background image

829172-00(0)

© 2006 Ingersoll-Rand Company Limited

611 and 711 Series Swing Clear Continuous Hinges

Mark frame hole locations.

1

Mount hinge to door.

2

Mount door to frame

3

Check for proper operation.

4

Determine TOP of hinge using

door and frame as guide.

Open hinge and place frame leaf

flat against surface of frame leaving

1/8” gap between top of hinge and

bottom of frame header, and edge

of hinge frame leaf flush with inside

edge of frame.

Mark hole locations on frame using

center punch. A center punch mark is

required to start self drilling screws accurately.

DO NOT install hinge to frame at this time.

Place door leaf of hinge against hinge

edge of door so that top of hinge is

flush with top of door and edge guard

is flush with inside face of door.

With hinge held firmly in place, use

#10 x 1/2” self drilling screws to fasten

leaf to metal door, or #10 x 1 wood

screws to fasten leaf to wood door.

Note:

 Fasten top screw first, and

bottom most screw second, making

sure hinge is aligned correctly.

ALL HOLE LOCATIONS ON HINGE LEAF MUST BE FASTENED TO

DOOR FOR PROPER OPERATION. FAILURE TO INSTALL ALL

FASTENERS WILL VOID WARRANTY AND UL FIRE LABEL LISTINGS.

Installation Instructions

Note:

Before proceeding, check to be sure that hinge is proper size. Height of hinge should be 7/8”

LESS than opening height. See other side of page for cutting instructions.

A.

B.

C.

A.

B.

1/8”

Flush

Move door into opening and align

mounting holes in frame leaf of hinge

with marks on frame made in step 1

above. Note: An angle block, jack or

shims will be helpful in positioning

the door properly.

With hinge and door held firmly and

accurately in place, use #10 x 1/2”

self drilling screws to fasten

frame leaf of hinge to  frame

in marked locations.

A.

B.

ALL HOLE LOCATIONS ON HINGE LEAF MUST BE FASTENED TO

FRAME FOR PROPER OPERATION. FAILURE TO INSTALL ALL

FASTENERS WILL VOID WARRANTY AND UL FIRE LABEL LISTINGS.

Close door and check for

proper operation and

clearances. There should be

1/8” clearance between the

top of the door and the bottom

of the frame header, and 5/32”

clearance between the frame

and edge of the door when the

door is closed. Adjustments

can be made by shimming

frame or door leaf of hinge.

A.

5/32”

1/8”

Door

Frame

Flush with

top of door

Door

Flush

829172-00

To bottom of frame

!

CAUTION

Please follow the installation instructions carefully. Not doing so may

result in improper installation and void the manufacturer’s guarantee.

INSTALLATION NOTES

No reinforcing is necessary except on heavy doors. Reinforcement and

rivet nuts are required in the frame and door when door weight exceeds

300 pounds. Maximum door weight is 600 pounds.

If the mullion is between the doors, treat as a single door installation. If

the mullion is behind the doors, treat as a double door installation.

Reinforcing and Rivet Nuts:

Pairs of Doors with Mullions:

Отзывы: