16
NEW DAILY
–
CHASSIS INTERVENTIONS
CHASSIS INTERVENTIONS
2.4
WHEELBASE MODIFICATION
–
Printed 603.95.789
–
1 Ed. - Base 02/2014
For the pneumatic fitting see Chapter 2.14 (
Effects on braking
Generally speaking, shortening the wheelbase will have a negative effect on braking.
Table 2.10 indicates the wheelbase modification limits. Contact the IVECO Department - Homologation & Technical Application to
find out at what conditions (brake cylinders, minimum tare, theoretically admissible loads, tyres, height of centre of gravity) trans-
formation can be allowed.
Table 2.10 - Braking, wheelbase modification limits
Model
Version
Wheelbase
Minimum (mm)
Maximum (mm)
33S, 35S
Truck, van
3000
4100
35C, 40C
Truck, van
3000
4100
45C, 50C
Van
3000
4750
45C, 50C
Truck
3450
4750
60C, 65C, 70C
Truck, van
3520
4750
▶
The changes of the wheelbase on vehicles equipped with ASR necessarily lead to the updating of
the setting parameters of its control unit.
Intervention procedure
Proceed as follows to obtain good results:
●
position the vehicle so that the chassis is perfectly horizontal, use appropriate trestles;
●
detach the drive shafts, braking system hoses, cables and all other equipment that may interfere with proper work execution;
●
identify the reference points on the frame (e.g: guide holes, suspension supports);
●
mark the reference points with a slight punch mark on the top flaps on both side members, after having verified that the con-
junction line is at a perfect right angle with the longitudinal axle of the vehicle;
●
if moving the suspension supports, identify the new position using the previously determined references;
●
make sure that the new measurements are identical on both the right and left sides; the diagonal check, for lengths of at least
1500 mm must not yield deviations of over 2 mm;
●
make the new holes using as jig - if any other tools are unavailable - the supports and gusset plates of the crossbars;
●
secure the supports and crossbars using nails or screws; if using screws, bore the holes and use calibrated screws class 10.9
with anti-unscrewing nuts; if size allows, flanged head screws may be employed;
●
if cutting the frame (to be carried out according to indications of the second item in "Welding Operations" - Paragraph "Weld-
ing" (
Page 9)) mark a second line of reference points so that the work area is set between the two lines (plan for a dis-
tance of at least 1500 mm upon work completed). Carry over the points relative to the cutting area between the two lines;
proceed as instructed in Paragraph "Welding" (
●
before welding, check that the side members and any added parts are perfectly aligned and perform the check measure-
ments on both sides and along the diagonal line, as previously indicated. Apply the reinforcements as in Paragraph "Welding"
Содержание NEW DAILY
Страница 1: ...NEW DAILY BODYBUILDERS INSTRUCTIONS L I G H T R A N G E ISSUE 2014...
Страница 4: ...Printed 603 95 789 Base 02 2014...
Страница 6: ...Printed 603 95 789 Base 02 2014...
Страница 8: ...Printed 603 95 789 Base 02 2014...
Страница 9: ...Printed 603 95 789 Base 02 2014 SECTION 1 GENERAL INFORMATION...
Страница 10: ...Printed 603 95 789 Base 02 2014...
Страница 12: ...4 NEW DAILY GENERAL INFORMATION GENERAL INFORMATION Printed 603 95 789 1 Ed Base 02 2014...
Страница 25: ...Printed 603 95 789 Base 02 2014 SECTION 2 CHASSIS INTERVENTIONS...
Страница 26: ...Printed 603 95 789 Base 02 2014...
Страница 86: ...62 NEW DAILY CHASSIS INTERVENTIONS CHASSIS INTERVENTIONS Printed 603 95 789 1 Ed Base 02 2014...
Страница 87: ...Printed 603 95 789 Base 02 2014 SECTION 3 APPLICATIONS OF SUPERSTRUCTURES...
Страница 88: ...Printed 603 95 789 Base 02 2014...
Страница 120: ...34 NEW DAILY APPLICATIONS OF SUPERSTRUCTURES APPLICATIONS OF SUPERSTRUCTURES Printed 603 95 789 1 Ed Base 02 2014...
Страница 121: ...Printed 603 95 789 Base 02 2014 SECTION 4 POWER TAKE OFFS...
Страница 122: ...Printed 603 95 789 Base 02 2014...
Страница 124: ...4 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 136: ...16 NEW DAILY POWER TAKE OFFS POWER TAKE OFFS Printed 603 95 789 1 Ed Base 02 2014...
Страница 137: ...Printed 603 95 789 Base 02 2014 SECTION 5 ELECTRONIC SUB SYSTEMS...
Страница 138: ...Printed 603 95 789 Base 02 2014...
Страница 140: ...4 NEW DAILY ELECTRONIC SUB SYSTEMS ELECTRONIC SUB SYSTEMS Printed 603 95 789 1 Ed Base 02 2014...
Страница 189: ...Printed 603 95 789 Base 02 2014 SECTION 6 ADBLUE AND SCRT SYSTEM...
Страница 190: ...Printed 603 95 789 Base 02 2014...
Страница 192: ...4 NEW DAILY ADBLUE AND SCRT SYSTEM ADBLUE AND SCRT SYSTEM Printed 603 95 789 1 Ed Base 02 2014...
Страница 201: ...Printed 603 95 789 Base 02 2014 APPENDIX A DAILY PEOPLE CARRIER...
Страница 202: ...Printed 603 95 789 Base 02 2014...
Страница 204: ...4 NEW DAILY DAILY PEOPLE CARRIER DAILY PEOPLE CARRIER Printed 603 95 789 1 Ed Base 02 2014...
Страница 217: ...Printed 603 95 789 Base 02 2014 APPENDIX B DAILY CNG AND CNG WITH RECOVERY MODE...
Страница 218: ...Printed 603 95 789 Base 02 2014...
Страница 240: ...Printed 603 95 789 Base 02 2014...