MARCH 2004
LUBRICATION
7.79
MARINE ENGINES INSTALLATION
When setting up the engine, it is essential to take into account that there must be enough room in the
engine compartment to have access to the pump and replace the lubricant.
NOTE
During the oil change procedure, take the necessary proper counter measures to avoid spilling oil in the bilge.
A., B. Manual pump activation to drain the oil.
7.6
ENGINE VENT
Inside the engine, part of the combustion gas leaks out of the cylinders and flows into the lubrication
circuits due to the high pressure; at the same time, the oil produces vapour due to the high tempera-
ture. This gas mixture, generally called blow-by, is exhausted out of the engine because of the engine
overpressure.
In the IVECO marine engines, the blow-by gases are concentrated in calibrated channels before they
reach the air filter, to be suctioned again and taken into combustion. Every model has a device that reg-
ulates the flow of re-suctioned blow-by, separates the liquid components through appropriate filters and
leads them to the oil sump.
Filters must be periodically changed; thus, easy access to this device should be guaranteed.
Figure 2
A
B
Содержание Marine Diesel Engines
Страница 1: ...MARINE DIESEL ENGINES INSTALLATION HANDBOOK T E C H N O L O G I C A L E X C E L L E N C E ...
Страница 8: ...MARCH 2004 INTRODUCTION 1 8 MARINE ENGINES INSTALLATION ...
Страница 24: ...MARCH 2004 ENGINE BOAT CHOICE FACTORS 2 24 MARINE ENGINES INSTALLATION ...
Страница 34: ...MARCH 2004 DRIVE 3 34 MARINE ENGINES INSTALLATION ...
Страница 50: ...MARCH 2004 DRIVE 3 50 MARINE ENGINES INSTALLATION ...
Страница 52: ...MARCH 2004 ENGINE INSTALLATION 4 52 MARINE ENGINES INSTALLATION ...
Страница 60: ...MARCH 2004 AIR SUPPLY 5 60 MARINE ENGINES INSTALLATION ...
Страница 64: ...MARCH 2004 AIR SUPPLY 5 64 MARINE ENGINES INSTALLATION ...
Страница 66: ...MARCH 2004 FUEL SUPPLY 6 66 MARINE ENGINES INSTALLATION ...
Страница 74: ...MARCH 2004 FUEL SUPPLY 6 74 MARINE ENGINES INSTALLATION ...
Страница 76: ...MARCH 2004 LUBRICATION 7 76 MARINE ENGINES INSTALLATION ...
Страница 80: ...MARCH 2004 LUBRICATION 7 80 MARINE ENGINES INSTALLATION ...
Страница 82: ...MARCH 2004 COOLING 8 82 MARINE ENGINES INSTALLATION ...
Страница 90: ...PLUG WITH ANODE PROTECTION EFFECT MARCH 2004 COOLING 8 90 MARINE ENGINES INSTALLATION Figure 7 ...
Страница 92: ...MARCH 2004 DISCHARGE 9 92 MARINE ENGINES INSTALLATION ...
Страница 98: ...MARCH 2004 DISCHARGE 9 98 MARINE ENGINES INSTALLATION ...
Страница 100: ...MARCH 2004 AUXILIARY SERVICES 10 100 MARINE ENGINES INSTALLATION ...
Страница 104: ...MARCH 2004 AUXILIARY SERVICES 10 104 MARINE ENGINES INSTALLATION ...
Страница 106: ...MARCH 2004 CONTROLS 11 106 MARINE ENGINES INSTALLATION ...
Страница 110: ...MARCH 2004 ELECTRICAL INSTALLATION 12 110 MARINE ENGINES INSTALLATION ...
Страница 120: ...MARCH 2004 GALVANIC CORROSION PROTECTION 13 120 MARINE ENGINES INSTALLATION ...
Страница 126: ...MARCH 2004 CONTROL TEST PROCEDURES 14 126 MARINE ENGINES INSTALLATION ...
Страница 131: ......